IR 05000317/1989013

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-317/89-13 & 50-318/89-13 on 890501-05 (Ref 10CFR73.21 & 2.790).No Noncompliance Noted.Major Areas Inspected:Mgt Support, Program Plans & Vital & Protected Area Barriers
ML20244B749
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/05/1989
From: Cameron D, Keimig R, Lancaster W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20244B744 List:
References
50-317-89-13, 50-318-89-13, NUDOCS 8906130263
Download: ML20244B749 (11)


Text

[ . .

.s ,

meestrh_s

-

@ .$ a ' ' '

'

g-969 f}

kdi $W {y:ry,)

..( CRGM11^#U -

U.S. NUCLEAR-REGULATORY COMMISSION

REGION I

50-317/89-13 Report Nos. 50-318/89-1_3 5 0-317 Docket Nos. 50-318 DPR-53 License Nos. DPR-69 Licensee: Baltimore Gas and Electric Company Facility Name: Calvert' Cliffs Nuclear Power Plant, Units 1 and 2 Inspection At: Lusby, Maryland Inspection Conducted: May 1-5, 1989 Type of Inspection: Routine, Unannounced Physical Security Inspectors:

D. F. Cameron, Reactor Engineer - date Physical Security

/

-- N k- bb W. K. Lancaster, Physical Security Inspector 4kfiT

' date

-

l'

Approved by: M zd/

/R. R. Keimig, Gttief, Safegu s Section 6-/-#9 date Division of Radiation Sa and Safeguards Inspection Summary: Routine, Unannounced Physical Security Inspectio {

(Combined Inspection Report Nos. 50-317/89-13 and 50-318/89-13 1 Areas Inspected: Licensee Actions on Findings of the NRC's.RER; Management i

Support, Program Plans, and Audits; Protected and Vital Area Physical Barriers, Detection and Assessment Aids; Protected and Vital Area Access Control of Personnel, Packages, and Vehicles; Alarm Stations and Communications; Power Supply; Testing, Maintenance, and. Compensatory Measures; Training and H}

Qualification !

Results: The licensee was in compliance with NRC requirements in the areas inspecte gDR ADOCK0500g7

_a_ _ - - -

- _ - - _ - _ - - - _ - - _

. .

'

..

-

DETAIL . ' Key Personnel Contacted Licensee Personnel-

  • R.- Dernoga, Manager, Facilities Management V. Bradly, Director, Security Services

L. Gibbs, General Supervisor, Calvert' Cliffs Security Operations

  • Gwiazdowski, Assistant General Supervisor, Nuclear Security-
  • C, Hart, Supervisor, Security Training and Education Unit-
  • Ross, Security Licensing Analyst
  • Alvey, Nuclear Security Supervisor
  • Flinn, Nuclear Security Supervisor
  • .

Lund, Nuclear Security Superviso * Leonard, Supervisor,. Security Screening Unit

  • Cox, Supervisor, Security Support Unit
  • Rae, Security Systems Analyst U. S. Nuclear Regulatory Commission (NRC)
  • H. Eichenholz,- Senior Resident Inspector
  • Indicates those present at the Exit Intervie . Licensee Action on Findings from the NRC's Regulatory Effectiveness Review (RER) The RER, which was conducted on October 7-33, 1985, identified two

-

inadequacies.and six weaknesses in.the licensee's security program which were considered to provida a level of protection significantly less than intended by the NRC, and, if allowed to continue, could degrade to safeguards vulnerabilitie . Current Status - all but four items identified in the-report (RER .

report Paragraph Nos. 2.2.1, 2.2.2, 2.3.1 and ' 2.3.5) were identified in NRC Combined Inspection Report No. 50-317/87-28 and 50-318/87-29, as being satisfactorily correcte Following-is a status of the items that remained open:

T63 PIEMil 00Rif63 SERT.23 E E ! E ! 0 9 IS !si FOR P S LW BiSCLOSEE,IT IS IllT9tilallALLY LEFT R A K

. . . . . _ . .

.

.

.

-

.

l

'

Tills PARAMAPN CSEms gArgg afsnmatis g3 IS NOT FOR PSUC OlSCl050RE, It IS IMEgggly ,.

Lifi RA The NRC considers these three items (2.2.1, 2.3.1 and 2.3.5) to be-resolve THIS PARAGRAPfl CORAINS SAFEGIIARDS liff0RMATION AND IS NOT ISR PU8tle DISCl0SURE, li IS INTENIlONAlly liffBl This matter remains open and will be reviewed during future inspections of the licensee's security progra l l Management Support, Security Program Plans, and Audits

, Management Support - Management. support for.the licensee's physical security program was determined to be adequate by the inspector This determination was based upon the inspectors' review of various

,

I j aspects of the licensee's progra The licensee has continued to upgrade the Calvert Cliffs physical security program since the last routine physical security inspectio Some of these security proaram unorades are as follown

-; l tus rman cenAES SMEUARDS NFDPET10M AND IS NOT IGR PUBLIC DIStulSIRE,IT 15 INf91tl0llALLY '

LUT R . - . - -- .

. . . .. . .

. .__

_

__ . _ -

_ _- -

, -

-

, . # 1, i

..l

..

j

.

l

  • Upgrading the firearms training: program to include, procurement of a-computerized firearms- target system 'and improvements to the:

~

range;

  • Conducting expanded and formalized self-assessments.of the various aspects of the security program;  ;
  • Mair.taining'an excellent security training programLfor the:

security force;

  • Conducting annual crmtingency drills with off-site local law enforcement agencies;.
  • Sending security supervision to other nuclear power plants toL evaluate other nuclear security. programs; and,
  • Expanding nuclear operations personnel involvement in security-

-

related contingency drill '

The inspectors found these types'of upgrades to be indicative of'a high quality and performance oriented security program. Thel inspectors noted that security force members (SFMs) are, ;inTgeneral',

very knowledgeable of their post duties, contents of procedures'and

.

'

their.other responsibilities and exhibit a very professional demeanor. On-site. security managers and supervisors' appeared to be-effectively implementing a quality program and corporate support is-highly evident. Minor security concernsLidentified by the inspectors :

_

during the' inspection were addressed with on-site. security manageme'nt ~

and prompt corrective actions were'taken as applicable. The inspectorsnoted,however,thatsomefof'thelicensee's' security:

systems are showing signs of. age as evidenced.by their marginal effectiveness. The SFMs are adequately compensating for_ these -

systems and~ equipment deficiencies but human performance has inherent weaknesses. In summary, the inspectors; determined that the-licensee-has 's good, strong security program that. is generally:very effectiv However, the effectiveness of the program could be further.: improved j by upgrading the aging systems and equipment.- Security program plans - Thefinspectors verified that changes to the licensee's Security, Contingency, and Guard Training and -

Qualification Plans, as-implemented, did'not decrease th effectiveness of the respective plans,) and'had been submitted in -

..

L accordance with NRC requirement O Audits r The inspectors reviewed the 1988 and 1989 ann'ual. securit program audit reports'and verified that the audits had been conducted in accordance with- the Security Plan (the Plan). The audits were'

comprehensive in scope with the results reported to the appropriate i levels of'manageinent. The. inspectors' review included the response of the security organization toLthe audit findings and the corrective i

}i

- = . >

- - - - - - - - . ..

-

.

, ...

,

4'

u actions taken to remedy any adverse l finding The. documented'

' corrective actions appeared appropriate for the finding The inspectors-noted during:the review of the 1989 audit report.that1 lthe'-Quality Assurance (OA) auditors appeared to focus on the performance and effectiveness of the SFM's but not.on 'the security

~

systems and equipment. .The. inspectors. expressed a. concern to the-licensee that the performance;and effectiveness of the securityr - ;

systems and equipment. should-also'be reviewed as' stringently as 'all other areas that are audited.' The licensee. informed the inspectors ..

that those areas are routinely evaluated byL the corporate: security I staff. The results of those evaluations'will be reviewed in.- 1 subsequent inspection . Protected and Vital Area physical Barriers, Cetection and Assessment Aids Protected Area Barriers - The inspectors condutted a physical .

inspection of the protected area (PA) barrier l on May 1. and r 2,- 198 H

.The inspectors determined, by observation, that the barriers were'

installed and' maintained as. described in'the Plan. The inspectors:

observed that the PA barrier had beeniupgraded since'the last j inspection. The upgrade consisted of the -addition' of "ra:or1 ribbon"'

to the top of the barrier at selected locations.- f

. '

Till! PARERAPil COMIB SEMARBS IE0EM10)i MB iS ET FOR PUBUC 1

'

DISCLOSUT6E, IT IS INTENil0!! Ally LUT BLAE Protected Area Detection Aids - The inspectors observed the prot'ected area perimeter detection aids on May 2.and 3, 1989, and determined that they were installed, maintained and operated as committed to in the Pla !

EB PMM Em!m sagag i MM1% M315 ET ice rygg .l ELDIDE, IT IS (A73r9jygy j WT BUK  :

!

n

'\

i

_____--_--__L-__--------- ' " ' ~ ~~ "~ * *

.-

,

.

,.

..

  • +

.5 Isolation Zones'- The inspectors verified'that isolation zones were adequately maintained.to permit. observation of activities on both sides'of the-protected area barrie . Assessment Aids'- The' inspectors observed the protected' area-perimeter as'Esment s aids. and determined that they.were generally .

installed, maintained, and' operated as committed to in the Pla TSS PARAGRAPH COEAINS SAFEGilARDS-IF.f0P. Mall 0N AND IS NOT FOR PIRE DISC 10SilRE, II l$ IMr LEFT BLAK  ;

)

'l l

!

The licensee committed to analyze'these potential weaknesses and .i'

initiate corrective actions.as.necessar This matter will be reviewed in future-inspection Vital Area' Barriers - The-inspectors conducted a physical' inspection of several. vital area barriers on May .4 and 5,1989. The inspectors' ;i determined, by. observation, that the barriers were installed and maintained as described in the Plan' .

l Vital Area Detection Aids - The inspectors observed the vital. are i l detection aids and determined that they'were installed, maintained- !

l and operated as committed:to in the Plan'. '

i i

i j

. . _ . . , . . . - . . . . . . _ _ . 1

_

____ --_ - _ ._ . _ - -_-

, -

.

.n 6 Protected and Vital Area Access Control of Personnel, Packages and Vehicles . Personnel Access Control - The inspectors determined that the licensee was exercising positive control over personnel access to the protected and vital area This determination was based on the following:

'

(1) The inspectors verified that personnel are' properly identified and authorization is checked prior to issuance of badges and key-card (2) The inspectors. verified-that the licensee has a program t confirm the trustworthiness and reliability of employees and contractor personnel. This program includes checks on employment, credit, and criminal history,, and a psychological examinatio (3) The inspectors verified-that the licensee has a fitness-for-duty program in place. The drug testing program consists of:

  • All new hires (licensee and contractors) are ' tested before being granted unescorted access;-
  • Testing for cause of all personnel; and,

'Beginning June 1,1989, random testing.of all personne f The licensee has also begun periodic searches of the owner-controlled area and the PA with drug detection dog I I

(4) The inspectors reviewed the security lock and key' procedures and i determined that they were ' consistent with commitments in the Plan. The inspectors also reviewed the protected and vital area' i key inventory logs, and discussed lock and key procedures with i members of the security force and the licensee's; security staf j (5) The insper. tors verified that the licensee takes precautions to ensure that an unauthorized name cannot be added to the access list by having a member of management review the list every 31 day ;

(6) The inspectors verified that the licensee has a search program, ,

as committed to in the Plan, for firearms, explosives,  !

incendiary devices and other unauthorized materials. ' The  !

inspectors observed personnel access processing during shift  !

changes, visitor access processing, and interviewed members of the' security force and licensee's security staff about personnel ,

access procedures'. l l

TES PARAGRAPH CONTAl#$ SAFEGliADS INf0RMAil0H AND IS NOT FOR PUBLIC

DISCLOSUltE, II IS INTENil0HAllY LEFI BLAN .. . _ _ _ _ _ - - _ - _ _ _ _ - _ - _ _ - . _ _ _ _ _ _ _ . . . _ _ _ ____ __-_ __ - .__ __:_:_2 _ _ _ L __'L __ _ __ l

_ --

.

o

- -

.

.

.

.

.

Tills PARAGRAPil CONANS SAFEMM NFORilA110ll AND IS NOT FOR PRIC

.DISCL880RE, E lt EmmOWilY >

LUT RAN (7) The ' inspectors determined, by observation, that: individuals in the Protected Area (PA) and Vital _ Area (VA) display'their access badges as required, j

j (8) The inspectors verified that the licensee has escort procedures for visitors to the PA and VA '1 (9) The inspectors verified that the licensee'has. a mechanism for expediting access to vital equipment during emergencies and that- I the mechanism is adequate for its p., pose' .

,

(10) The inspectors verified that unesco ed access to VAs is limited :

to authorized individuals. The access list is: revalidated at !

least once every 31 days as committed to in the Pla Package and Material Access Control - The inspectors determined that~

the licensee was exercising positive control over packages and material that are brought into the protected area at the main. access ;

'

portal. The inspectors reviewed the package and material control

, procedures and found that they were ' consistent with commitments .in

!

the. Plan. The inspe'ctors also observed package 'and material i processing and interviewed members ofl the ' security force and the i licensee's security staff about ' package and material control procedure .

-- - - - - . - - -

_ _ _: _ _= : = -_

-

__ _ _ _ _ _ _

_

4 *

., z # . 4 8- -j q

y

-.

1Mt PARAGRAPil C9lliAINS 'SAFECUARDS-

INFDEAT10W AND IS NOT FOR PilEE DISCLOSURE, li is IlliEllillllELF lElT EAll ,

,

I i

'!

~

c., Vehicle Access Control'- The inspectors determined that the-licensee-properly controls vehicle access ~to and within the protected' are .

The_. inspectors verified that vehicles are properly authorized-prior:

to being allowed to enter the PA. Identification-is verified by the -

.

H SFM at'the vehicle access portal. This procedure.is consistent with'

the commitments in the Plan. The' inspectors also reviewed the vehicle search procedures and determined that they were consistent' t with commitments in the Plan. LThis determination was made-by-

~

J observing vehicle processing and search, inspection of vehicle-logs, I and by interviewing members of the . security 7orce' and licensee's security staff about vehicle search.' procedures. The.Linspector-also determined that-at least two SFMs control vehicle assess at.the main j vehicle assess ooin !

l h 4

'

IFK#llMR AE9 IS ET TH mits '

DittiBSEE, li 18 lifiaTi!RLtV llTT BLAR  ;

i

.

i_ a _

- - ~ .

_ - - - - _ - _ _ . ..

___ _ -- - _ - -__ .

v, s

,

A* 9

THIS PARAGRAPH C0lliAINS SAltGUARDS-

'IHf0RitAll0ll Aldl'IS 110T FOR PIES DISCLOSURE, IT 13 INWmlMll!/

tm stAK , Alarm Station and Communications:

The inspectors. observed the? operation.of the central and seco.ndary alarm stations (CAS/SAS) and determined that they' were maintained and operated as-committed to in.the Plan. ECAS and.SAS' operators were1 interviewed by

. the inspectors and found to be knowledgeable of their duties =and; responsibilities. The inspectors verified that:the CAS does not contain-

~

any ' operational activities that:would interfere.with the assessment-and  !

- response functions.-

-

The inspectors also observed tests ~of all' communications capabilities in-both the CAS and the SAS and reviewed the testing records for the communications' channel s. All' were found to be as committed to in the '

.,1 Pla , Emergency-Power Supply

' The inspectors verified that- there: are 'several ' systems (batteries, security diesel generator, plant emergency diesel generators,l3nd. plant-

- on-site AC power) that provide backup. power.to the security: systems land reviewed the accompanying test and maintenance procedares. The systems-and procedures were consistent with'the Plan. .The'ba'tteries, battery chargers, inverters, and the diesel generators are located lin locked  ;

area '1 Testing, Maintenance and Compensatory Measures The ir.spectors reviewed testing and maintenance records. The: testing and'

maintenance records committed to in the Plan were on file and readily available for review. The security systems are maintained:and repaired by- '!

several differer.t groups, located both on and off-site,rtherefore,' the i security organization is not always ensured of prompt repair and return t !l service of malfunctioning security equipment. The licensee agreed-to

~

'

review this situatio The' inspectors also reviewed the licensee's use of compensatory measures and determined them to be as committed to in'the Pla . Security Training and Qualification ,

o The inspectors randomly selected and reviewed the training and q0alifica - O tions records for. ten SFMs. _ Physical qualifications'and firearms qualifi--

cations records were inspected _ These records were,fortarmed guards, 2 security monitors and supervisory personnel. The inspectors determined'

that the.. required training had been conducted.in accordance with the:

~

security program. plans and that 'it was properly documente !

l

. .- . . . , . .

. . . _, .

m .- ~

,1- , .

,. s l .

"

The licensee administers the training program with eight professionals-(1 supervisor, 3 instructors /on-site, 2~ instructors /of f-site, != clerk and:1

.part-time firearms instructor). .. Newly hired SFMs receive a minimum of ten weeks of. basic' training'(including'40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of' firearms. training). The Colbert County' Junior college is awarding!20 ' college credits for the completion of; this basic training. orogram to aualified students. - SFMs' are also on a five week: routine training ' schedule, i.e. , every fifth week they receiv~e one week of' training. ' Training schedules are prepared one year in advanc Several'SFMs were interviewed to determine.if they possessed the requisite knowledge and ability to carry out/their assigned duties. The' interview results their j. indicated that they are very professional and knowledgeable off ob requirement The inspectors determined-that the turnover rate in the security' force (both ' proprietary and contractor personnel) is' very low, with almo'st al turnover as a resulti of transfers within the licensee's organizatio At the time of the inspection, the . licensee's security force consisted of 150 personnel (10 supervisory personnel, '10 security system operators, .4 SFMs and 88 contract watchm'en, 53 of whom were outage-related only). The-inspectors verified that the armed response force meets the commitments in

-

the Plan and that there is always one full-time member of the security '

organization on-site who has' the authority to direct security activitie .i The. corporate security department has tiso added one full-time

.

.!

investigator to the site,to conduct on-siteLinvestigation ~

1 Exit Interview The inspectors met with the licensee representatives indicated in paragraph I at the conclusion of the inspection on May 5, 1989. At the time, the purpose and scope for the inspection were reviewed and the findings were presente At no time during the inspection was written material provided to the licensee by the inspecto i l

i

)

l i

i

]

q