Forwards Summary of Changes to Plant Settlement Monitoring Surveying Procedure 1-PT-115,for Review Per Aslab Decision ALAB-578
ML20244B748
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/09/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-424, NUDOCS 8906130262
Download: ML20244B748 (3)


Text

-- -

.4 1

. VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 i

i June 95 1989 United States Nuclear Regulatory Commission Serial No.89-424 i

Attention:

Document Control Desk NAPS /JHL/KAS Washington, D.C. 20555-Docket'Nos. 50-338.

50-339 l

License Nos. NPF-4 l

h NPF-7 i

Gentlemen:

l VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 l

SLIILEMENT MONITORING PROCEDURE REVISION

.i Enclosed is a summary of changes to the North Anna Power Station Settlement l

Monitoring Surveying Procedure, 1-PT-115.

This information is being transmitted for your review pursuant to Atomic Safety'and Licensing Appeal Board Decision ALAB-578.

.If you have any questions, please contact us.

Very truly yours, 1

W. L.

tewart Senior Vice President - Power Enclosure 1

ACOl 8906130262 890609 PDR.ADOCK 05000338 l

p PDC

g

/

cc:

U. S. Nuclear Regulatory Comission 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr.~J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station f

- - ~

l,,

t c

P i

St# MARY OF CHANGES TO SETTLEMENT MONITORING PROCEDURE

.This summary provides notification 'in accordance with' Atomic Safety and Licensing Appeal Board Decision ALAB-578, that the Virginia Electric and Power:

Company has revised-the Settlement Monitoring Surveying Periodic ~

Test i

1 Procedure,- 1-PT-115.

This -procedure is used by the contract surveyor, L

Bengston, DeBell. Elkin and Titus, Ltd. to monitor the settlement of-' Class I structures at North Anna Power Station. This procedure provides instructions

-for surveying to Second Order, Class II accuracy.

The changes made to the procedure establish the methodology for correlating the measurement obtained from the Philadelphia Rod to the Invar Stave in order to assure consistent survey readings are obtained when either rod.i s used.

The contract surveyor uses.the Philadelphia Rod to survey obstructed settlement points that cannot' be surveyed with the Invar Stave.

In addition, a Field Conditions Data Sheet Attachment was added to the test procedure in

. order to provide the surveyor with a document to note-problems or unusual conditions experienced during the survey.

Other changer to the test procedure were administrative in nature and do not affect the metr.od of surveying or the test results.