Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-31263, Special Rept:On 890620,diesel Generator Control Room 1b Temp Above Tech Spec Limit of 104 F for More than 8 H.Caused by Heat Generated Inside Bldg by Standby Diesel Generator Keep Warm Sys,High Outside Temps & Insufficient Ventilation + (01:41:04, 2 December 2024)
- BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 + (01:41:05, 2 December 2024)
- ML20247G143 + (01:41:05, 2 December 2024)
- 05000461/LER-1989-013, :on 890302,all intermediate-range Channels Declared Inoperable Because Weekly Channel Functional Surveillance Could Not Be Performed Due to Plant Conditions. Caused by Personnel Error.Personnel Counseled + (01:41:07, 2 December 2024)
- ML20247G139 + (01:41:09, 2 December 2024)
- ML20247G138 + (01:41:10, 2 December 2024)
- IR 05000275/1989007 + (01:41:11, 2 December 2024)
- ML20247G134 + (01:41:11, 2 December 2024)
- RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 + (01:41:12, 2 December 2024)
- 05000313/LER-1989-017, :on 890420,discovered That Dhr/Low Pressure Injection Cooler Discharge Isolation Valves Not Tested Quarterly.Caused by Inadequate Mod Review Process.Provisions Made to Test Valves Every 3 Months + (01:41:14, 2 December 2024)
- ML20247G131 + (01:41:18, 2 December 2024)
- ML20247G129 + (01:41:18, 2 December 2024)
- 0CAN038913, Informs That Util Unable to Complete Relief Requests in Response to Violations Noted in Insp Repts 50-313/88-26 & 50-368/88-25 by 890331.Relief Requests from Inservice Insp Exams Will Be Submitted by 890531 + (01:41:19, 2 December 2024)
- ML20247G124 + (01:41:20, 2 December 2024)
- ML20247G122 + (01:41:21, 2 December 2024)
- ML20247G118 + (01:41:24, 2 December 2024)
- ML20247G119 + (01:41:24, 2 December 2024)
- ML20247G115 + (01:41:25, 2 December 2024)
- ML20247G116 + (01:41:25, 2 December 2024)
- ML20247G113 + (01:41:29, 2 December 2024)
- ML20247G112 + (01:41:30, 2 December 2024)
- ML20247G111 + (01:41:30, 2 December 2024)
- ML20247G110 + (01:41:31, 2 December 2024)
- ML20247G107 + (01:41:32, 2 December 2024)
- ML20247G105 + (01:41:33, 2 December 2024)
- ML20247G103 + (01:41:33, 2 December 2024)
- AECM-89-0142, Corrected Ltr Requesting for Withdrawal of 890130 Relief Request I-00020 from ASME Section XI Requirements,Per 10CFR50.55a(g)5(iii) + (01:41:34, 2 December 2024)
- ML20247G100 + (01:41:34, 2 December 2024)
- ML20247G099 + (01:41:35, 2 December 2024)
- ML20247G097 + (01:41:36, 2 December 2024)
- ML20247G098 + (01:41:36, 2 December 2024)
- ML20247G095 + (01:41:37, 2 December 2024)
- ML20247G096 + (01:41:37, 2 December 2024)
- 05000285/LER-1989-010, :on 890419,discovered That Polyflow Tubing to Sample Point on Roof Disconnected on Channel B of Two Toxic Gas Monitors.Caused by Deficiencies in Station Mod Program. Sample Tubing Replaced & Flow Rate Retested + (01:41:39, 2 December 2024)
- ML20247G093 + (01:41:41, 2 December 2024)
- ML20247G089 + (01:41:42, 2 December 2024)
- ML20247G091 + (01:41:42, 2 December 2024)
- ML20247G088 + (01:41:43, 2 December 2024)
- ML20247G087 + (01:41:44, 2 December 2024)
- ML20247G085 + (01:41:50, 2 December 2024)
- ML20247G084 + (01:41:50, 2 December 2024)
- ML20247G080 + (01:41:51, 2 December 2024)
- ML20247G081 + (01:41:51, 2 December 2024)
- ML20247G076 + (01:41:53, 2 December 2024)
- ML20247G078 + (01:41:53, 2 December 2024)
- ML20247G075 + (01:41:54, 2 December 2024)
- ML20247G072 + (01:41:55, 2 December 2024)
- ML20247G069 + (01:41:56, 2 December 2024)
- ML20247G070 + (01:41:56, 2 December 2024)
- ML20247G065 + (01:41:57, 2 December 2024)
- ML20247G067 + (01:41:57, 2 December 2024)
- ML20247G063 + (01:41:58, 2 December 2024)