Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247L479 + (00:54:55, 2 December 2024)
- ML20247L480 + (00:54:55, 2 December 2024)
- ML20247L478 + (00:54:56, 2 December 2024)
- 05000482/LER-1989-012, :on 890626,control Room Ventilation Isolation Signal Initiated When Control Room Air Intake Radiation Monitor GKRE-04 Experienced Loss of Power.Caused by Blown Fuse.Fuse Replaced + (00:54:58, 2 December 2024)
- ML20247L476 + (00:54:59, 2 December 2024)
- ML20247L472 + (00:55:00, 2 December 2024)
- ML20247L473 + (00:55:00, 2 December 2024)
- ML20247L469 + (00:55:01, 2 December 2024)
- ML20247L467 + (00:55:01, 2 December 2024)
- 05000302/LER-1989-021, :on 890614,during Surveillance Test,Reactor Protection Sys Actuation Received.Cause Unknown.Monitoring Program Instituted to Look at Switch After Any Reactor Protection Sys Actuation + (00:55:03, 2 December 2024)
- ML20247L464 + (00:55:04, 2 December 2024)
- ML20247L463 + (00:55:05, 2 December 2024)
- ML20247L461 + (00:55:05, 2 December 2024)
- ML20247L459 + (00:55:07, 2 December 2024)
- ML20247L460 + (00:55:07, 2 December 2024)
- ML20247L456 + (00:55:08, 2 December 2024)
- ML20247L457 + (00:55:08, 2 December 2024)
- ML20247L454 + (00:55:09, 2 December 2024)
- ML20247L455 + (00:55:09, 2 December 2024)
- ML20247L453 + (00:55:12, 2 December 2024)
- ML20247L451 + (00:55:16, 2 December 2024)
- 05000302/LER-1989-025, :on 890629,plant Separated from Normal Offsite Power Source.Electrical Storm Was in Progress.Caused by Electrical Fault in 230 Kv Switchyard.Damaged Current Transformer Replaced + (00:55:30, 2 December 2024)
- ML20247L449 + (00:55:31, 2 December 2024)
- RBG-30419, Forwards Listing of Levels of Nuclear Property Insurance Coverage for Facility by Policy Number & Limit + (00:55:32, 2 December 2024)
- ML20247L448 + (00:55:32, 2 December 2024)
- ML20247L442 + (00:55:33, 2 December 2024)
- ML20247L441 + (00:55:34, 2 December 2024)
- ML20247L438 + (00:55:34, 2 December 2024)
- ML20247L437 + (00:55:38, 2 December 2024)
- ML20247L436 + (00:55:39, 2 December 2024)
- 05000482/LER-1989-010, :on 890616,discovered That Tech Spec Requirement 4.11.2.6 Re Quantity of Radioactive Matl Not Met.Caused by Inadequate Programmatic Controls.Procedures Re Gas Decay Tank Additions Revised + (00:55:43, 2 December 2024)
- ML20247L431 + (00:55:48, 2 December 2024)
- ML20247L432 + (00:55:48, 2 December 2024)
- IR 05000282/1989008 + (00:55:53, 2 December 2024)
- 05000259/LER-1989-017-02, :on 890701,potential Transformer Compartment Door on 4 Kv Shutdown Board B Fell Open Disconnecting Fuse & Cabinet Contacts.Caused by Door Latching Mechanism Failure. General Operating Instruction to Be Issued + (00:55:56, 2 December 2024)
- ML20247L424 + (00:55:57, 2 December 2024)
- ML20247L420 + (00:55:58, 2 December 2024)
- ML20247L419 + (00:55:59, 2 December 2024)
- ML20247L418 + (00:55:59, 2 December 2024)
- PNO-II-89-037, Region II Notified That 2 of 53 Capsules Failed Cluck Test.Two Capsules Segregated Until Suitable Storage Location Can Be Found by DOE.Pre-shipment Testing Will Continue + (00:56:00, 2 December 2024)
- ML20247L417 + (00:56:00, 2 December 2024)
- ML20247L409 + (00:56:01, 2 December 2024)
- ML20247L407 + (00:56:02, 2 December 2024)
- ML20247L408 + (00:56:02, 2 December 2024)
- ML20247L406 + (00:56:03, 2 December 2024)
- ML20247L405 + (00:56:03, 2 December 2024)
- ML20247L402 + (00:56:04, 2 December 2024)
- ML20247L401 + (00:56:05, 2 December 2024)
- ML20247L400 + (00:56:05, 2 December 2024)
- ML20247L396 + (00:56:06, 2 December 2024)
- ML20247L398 + (00:56:06, 2 December 2024)
- ML20247L395 + (00:56:07, 2 December 2024)