Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247Q325 + (00:13:58, 2 December 2024)
- IR 05000499/1988009 + (00:13:59, 2 December 2024)
- ML20247Q318 + (00:14:00, 2 December 2024)
- ML20247Q315 + (00:14:04, 2 December 2024)
- ML20247Q316 + (00:14:04, 2 December 2024)
- ML20247Q312 + (00:14:05, 2 December 2024)
- ML20247Q314 + (00:14:05, 2 December 2024)
- ML20247Q310 + (00:14:06, 2 December 2024)
- ML20247Q309 + (00:14:07, 2 December 2024)
- ML20247Q307 + (00:14:08, 2 December 2024)
- ML20247Q304 + (00:14:08, 2 December 2024)
- ML20247Q302 + (00:14:09, 2 December 2024)
- ML20247Q303 + (00:14:09, 2 December 2024)
- ML20247Q299 + (00:14:10, 2 December 2024)
- ML20247Q298 + (00:14:11, 2 December 2024)
- ML20247Q297 + (00:14:11, 2 December 2024)
- ST-HL-AE-3115, Responds to 890221 Request for Addl Info Re Deletion of Test 27, Rod Cluster Control Assembly (Rcca) Below-Bank Position Measurement Test. Summary of Results of Tihange 3 Static Rcca Drop & Rcca below-bank Position Measurement Test Enc + (00:14:12, 2 December 2024)
- ML20247Q293 + (00:14:12, 2 December 2024)
- ML20247Q285 + (00:14:13, 2 December 2024)
- ML20247Q289 + (00:14:13, 2 December 2024)
- ML20247Q284 + (00:14:14, 2 December 2024)
- ML20247Q278 + (00:14:15, 2 December 2024)
- ML20247Q276 + (00:14:16, 2 December 2024)
- BECO-89-138, Monthly Operating Rept for Aug 1989 for Pilgrim Nuclear Power Station + (00:14:17, 2 December 2024)
- ML20247Q273 + (00:14:17, 2 December 2024)
- ML20247Q270 + (00:14:18, 2 December 2024)
- ML20247Q269 + (00:14:19, 2 December 2024)
- ML20247Q268 + (00:14:19, 2 December 2024)
- ML20247Q266 + (00:14:20, 2 December 2024)
- 2CAN038910, Discusses NRC Re Denial of Request for Partial Exemption to 10CFR50.62 requirement.C-E Owner Group Has Reconsidered Alternate Design Options to Satisfy Requirement & Scheduled Followup Meeting to End Reevaluation Effort + (00:14:21, 2 December 2024)
- ML20247Q263 + (00:14:21, 2 December 2024)
- ML20247Q261 + (00:14:22, 2 December 2024)
- ML20247Q256 + (00:14:22, 2 December 2024)
- PY-CEI-NRR-1061, Special Rept:On 890811,vibration & Loose Parts Monitoring Sys Experienced Spurious Alarms.Caused by Excessive Background Noise.Design Change Request Submitted to Address Hard Line Cable Issue + (00:14:23, 2 December 2024)
- ML20247Q253 + (00:14:24, 2 December 2024)
- ML20247Q246 + (00:14:27, 2 December 2024)
- BSEP-98-0094, Submits Summary of Insp Results for Feedwater Nozzle & Safe End Insps Performed During Refueling Outage 12 (B213R1). Engineering Svc Request (ESR) 97-00033, Unit 2 Feedwater Sparger Evaluation Based on B213R1 IVVI Exam Results, Encl + (00:14:28, 2 December 2024)
- ML20247Q236 + (00:14:29, 2 December 2024)
- ML20247Q237 + (00:14:29, 2 December 2024)
- ML20247Q234 + (00:14:30, 2 December 2024)
- IR 05000271/1989013 + (00:14:31, 2 December 2024)
- ML20247Q231 + (00:14:31, 2 December 2024)
- ML20247Q229 + (00:14:32, 2 December 2024)
- IR 05000266/1989016 + (00:14:33, 2 December 2024)
- ML20247Q219 + (00:14:33, 2 December 2024)
- BSEP-89-0510, Responds to Violations Noted in Insps 50-324/89-01 & 50-325/89-01.Corrective Actions:Util Site Procedure PLP-04 Governing Corrective Actions & Providing Guidance on How to Ensure Failures,Malfunctions & Deficiencies Developed + (00:14:34, 2 December 2024)
- ML20247Q214 + (00:14:35, 2 December 2024)
- ML20247Q211 + (00:14:35, 2 December 2024)
- ML20247Q208 + (00:14:36, 2 December 2024)
- ML20247Q205 + (00:14:37, 2 December 2024)
- ML20247Q204 + (00:14:37, 2 December 2024)
- B17260, Responds to RAI Re URI from Insp Rept 50-423/98-82 Re Resolution of Missing Training Records.Commitments Made by Util,Encl + (00:14:38, 2 December 2024)