Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247R292 + (00:05:15, 2 December 2024)
- ML20247R293 + (00:05:15, 2 December 2024)
- ML20247R291 + (00:05:16, 2 December 2024)
- ML20247R288 + (00:05:17, 2 December 2024)
- ML20247R285 + (00:05:21, 2 December 2024)
- ML20247R282 + (00:05:22, 2 December 2024)
- ML20247R283 + (00:05:22, 2 December 2024)
- ML20247R281 + (00:05:23, 2 December 2024)
- ML20247R280 + (00:05:24, 2 December 2024)
- ML20247R278 + (00:05:25, 2 December 2024)
- PNO-II-89-041A, Updating PNO-II-89-041 Re Apparent Pyrophoric Reaction in Depleted U Waste Shipment Received at Barnwell Low Level Waste Disposal Facility.Cause of Reaction Undetermined.Ban on Waste Shipments to Facility Placed + (00:05:25, 2 December 2024)
- ML20247R274 + (00:05:26, 2 December 2024)
- ML20247R275 + (00:05:26, 2 December 2024)
- ML20247R273 + (00:05:27, 2 December 2024)
- ML20247R271 + (00:05:27, 2 December 2024)
- ML20247R270 + (00:05:28, 2 December 2024)
- ML20247R266 + (00:05:30, 2 December 2024)
- ML20247R267 + (00:05:30, 2 December 2024)
- ML20247R264 + (00:05:31, 2 December 2024)
- ML20247R263 + (00:05:31, 2 December 2024)
- NRC-89-3448, Forwards Westinghouse SP/90 Position on Selected Severe Accident Issues to Be Discussed During 890714 Meeting W/Nrc in Rockville,Md.Issue Topics Include Fire Protection, Intersys Loca,Midloop Operation & ATWS + (00:05:32, 2 December 2024)
- 05000416/LER-1998-002-01, :on 980421,failure to Maintain Standby DG Seismically Qualified as Required by TS Was Noted.Caused by Failure to Comply W/Sys Operating Instruction 04-1-01-P75-1. Door Was Closed Immediately + (00:05:34, 2 December 2024)
- ML20247R260 + (00:05:35, 2 December 2024)
- IR 05000458/1989012 + (00:05:36, 2 December 2024)
- ML20247R253 + (00:05:37, 2 December 2024)
- ML20247R250 + (00:05:38, 2 December 2024)
- ML20247R245 + (00:05:43, 2 December 2024)
- B13146, Responds to NRC Questions Re Vacuum Breakers from Torus to Reactor Bldg + (00:05:44, 2 December 2024)
- ML20247R241 + (00:05:44, 2 December 2024)
- ML20247R238 + (00:05:46, 2 December 2024)
- ML20247R234 + (00:05:47, 2 December 2024)
- ML20247R233 + (00:05:47, 2 December 2024)
- ML20247R232 + (00:05:48, 2 December 2024)
- ML20247R229 + (00:05:49, 2 December 2024)
- ML20247R228 + (00:05:49, 2 December 2024)
- ML20247R227 + (00:05:50, 2 December 2024)
- ML20247R226 + (00:05:51, 2 December 2024)
- PNO-III-89-049, on 890731,reactor Operators Manually Scrammed Reactor from 25% Power as Water Level in Reactor Approached High Level Reactor Trip Point.Caused by Rupture in Bellows on Feedwater Header.Outage Expected to Last Approx 4 Days + (00:05:51, 2 December 2024)
- ML20247R223 + (00:05:52, 2 December 2024)
- ML20247R217 + (00:05:57, 2 December 2024)
- ML20247R219 + (00:05:57, 2 December 2024)
- ML20247R216 + (00:05:58, 2 December 2024)
- ML20247R213 + (00:05:59, 2 December 2024)
- ML20247R212 + (00:06:00, 2 December 2024)
- ML20247R211 + (00:06:00, 2 December 2024)
- ML20247R209 + (00:06:01, 2 December 2024)
- ML20247R210 + (00:06:01, 2 December 2024)
- ML20247R208 + (00:06:02, 2 December 2024)
- ML20247R207 + (00:06:03, 2 December 2024)
- ML20247R205 + (00:06:04, 2 December 2024)
- ML20247R203 + (00:06:05, 2 December 2024)