Text
._
u J'Y fr o
UNITED STATES g-f
'g NUCLEAR REGULATORY COMMISSION 5
- E WASHINGTON, 0. C. 20555
%, *...+$
DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY.
THE CLEVELAND ELECTRIC, ILLUMINATING COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. 50-412 BEAVER VALLEY POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 19 License No. NPF-73 1.
The Nuclear Regulatory Comisrion (the Commission) has found that:
A.
The application for amendment by Duquesne Light Company, et al.
(thelicensee)datedAugust 11, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8908070402 S90802 ADOCK 0500 2
gDR
I e
.. o 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:
.(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 19 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. 'The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment.is effective on issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR RfiULATORY COMMISSION hn F. Stolz, Dire or P oject Directorat I-4 ivision of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 2, 1989 i
g i
ATTACHMENT TO LICENSE-AMENDMENT NO. 19
' FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 Replace the following pages of the Appendix' A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of inange..
Remove Insert 3/4 7-18 3/4 7-18 3/4 7-19 3/4 7-19
- .C
' PLANT SYSTEMS 3/4.7.8' SUPPLEMENTAL LEAK COLLECTION AND RELEASE SYSTEM (SLCRS)
' LIMITING CONDITION FOR OPERATION 3.7.8.1~ Two'SLCRS exhaust air filter trains shall be OPERABLE.
' APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With one SLCRS exhaust air filter train inoperable, restore the inoperable
' train to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.8.1 Each SLCRS exhaust air filter train shall be demonstrated OPCRABLE:
At least once per 31 days by initiating, from the control room, flow a.
.through~the " standby" HEPA filter and. charcoal adsorber train and verifying that the train operates for at least 15. minutes with the heater controls operational.
b.
At least once per 18 months and (1) after each complete or partial replacement of a HEPA. filter or charcoal adsorber bank, or (2) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (3) following painting, fire or chemical release in any ventilation zone communicating with the system by:
1.
Verifying that the charcoal adsorbers remove > 99.95% of a halo-genated hydrocarbon refrigerant test gas when they are tested in place in accordance with ANSI N510-1980 while operating the ventilation system at a flow rate of 57,000 cfm~+ 10%.
l 2.
Verifying that the HEPA filter banks remove > 99.95% of the DOP when they are tested in place in accordance ~ith ANSI N510-1980 while operating the ventilation system at a flow rate of 57,000 cfm i 10%.
i 3.
Subjecting the carbon contained in at least one test canister or at least two carbon samples removed from one of the charcoal adsorbers to a laboratory carbon sample analysis and verifying a j
removal efficiency of > 99% for radioactive methyl iodide at an air flow velocity of 077 ft/sec 1 20% with an inlet methyl iodide l.
concentration of 1.5 to 2.0. mg/m, > 70% relative humidity, 3
and 30*C.
C; other test conditions shall be in accordance with ANSI N510-1980.
The carbon samples not obtained from test canisters shall be taken with a slotted tube sampler in accord-ance with ANSI N509-1980.
I i
BEAVER VALLEY - UNIT 2 3/4 7-16 Amendment No. 19
y r-PLANT SYSTE_MS jyRVEILLANCERE0VIREMENTS 4.
Verifying a system flow rate of 57,000 cfm i 10% during system l
operation.
i c.
At least once per 18 months by:
1.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 6.8 inches Water Gauge while operating the ventilation system at a flow rate of 57,000 cfm i 10%.
l l
2.
Verifying that the exhaust from the contiguous area is diverted through the SLCRS filter train on a Containment Isolation -
Phase "A" signal in less than 5 minutes.
d.
Verifying that the air flow distribution to each HEPA filter and chartoel adsorber is within + 20% of the averaged flow per unit af ter initial installation aiid after any maintenance af fecting the flow distribution.
e.
At least once per 4 months of system operation, perform the surveil-lance requirement of 4.7.8.1.b.3.
BEAVER VALLEY - UNIT 2 3/4 7-19 Amendment No. 19
_ _ _ _ _ _ _ _ _