Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1982-018, Forwards LER 82-018/03L-0 + (23:47:33, 19 December 2024)
- ML20042A609 + (23:47:34, 19 December 2024)
- IR 05000298/1981025 + (23:47:38, 19 December 2024)
- ML20042A605 + (23:47:39, 19 December 2024)
- ML20042A604 + (23:47:40, 19 December 2024)
- 05000271/LER-1982-003-01, /01T-0:on 820208,sample of Standby Liquid Control Boron Concentration Below Tech Spec Limits.Investigation in Progress.Administrated Limit & Sampling Frequency Increased + (23:47:42, 19 December 2024)
- ML20042A602 + (23:47:43, 19 December 2024)
- ML20042A599 + (23:47:45, 19 December 2024)
- ML20042A601 + (23:47:45, 19 December 2024)
- ML20042A598 + (23:47:46, 19 December 2024)
- 05000271/LER-1982-003, Forwards LER 82-003/01T-0 + (23:47:47, 19 December 2024)
- 05000369/LER-1982-016-03, /03L-0:on 820211,discovered Pivot Pin Missing from safety-related Hanger Located in Centrifugal Charging Pump 1B Room Supporting Pump 4-inch Discharge Line Rendering Hanger Inoperable.Cause Undetermined.New Pin Installed + (23:47:51, 19 December 2024)
- 05000237/LER-1982-007-03, /03L-0:on 820213,during Routine Surveillance of Reactor Level Switch LIS 2-263-58B,setpoint Found to Be Above Tech Spec Limit.Caused by Instrument Setpoint Drift. Switch Adjusted + (23:47:53, 19 December 2024)
- ML20042A593 + (23:47:54, 19 December 2024)
- ML20042A592 + (23:47:55, 19 December 2024)
- ML20042A590 + (23:47:56, 19 December 2024)
- 05000369/LER-1982-016, Forwards LER 82-016/03L-0 + (23:47:57, 19 December 2024)
- 05000328/LER-1982-023-03, /03L-0:on 820209,in Mode 1,loop 4 Main Steam Header Remote Shutdown Pressure Channel 2-PT-1-26C Declared Inoperable.Caused by Failure of Amplifier Card in GE Transmitter Due to Excessive Heat from Steam Leaks + (23:47:59, 19 December 2024)
- 05000237/LER-1982-007, Forwards LER 82-007/03L-0 + (23:48:01, 19 December 2024)
- 05000328/LER-1982-023, Forwards LER 82-023/03L-0 + (23:48:02, 19 December 2024)
- ML20042A580 + (23:48:03, 19 December 2024)
- 05000338/LER-1982-009-99, /99L-0:on 820216,electric Driven Fire Pump 1-FP-P-1 Was Tagged Out & Declared Inoperable for Longer than 7 Days.Caused by Required Maint on 1B Circulating Water Pump.Redundant Source of Fire Water Provided + (23:48:07, 19 December 2024)
- 05000331/LER-1982-015-01, /01T-0:on 820225,RHR Svc Water Valve MOV-1947 Failed to Close During Normal Operation.Caused by Wear of Valve Operator Stem Nut.Stem Nut MOV-1947 & Gaskets Replaced,Operator Lubricated & Limit Switches Reset + (23:48:09, 19 December 2024)
- 05000338/LER-1982-009, Forwards LER 82-009/99L-0 + (23:48:14, 19 December 2024)
- ML20042A574 + (23:48:15, 19 December 2024)
- 05000331/LER-1982-015, Forwards LER 82-015/01T-0 + (23:48:16, 19 December 2024)
- 05000261/LER-1982-002-03, /03L-0:on 820207,condensate Measuring Sys Breaker HVH-1 Tripped During Periodic Testing.Caused by Reverse Rotation Due to Missing Discharge Damper Louver.Reverse Rotation Stopped.Damper Repairs Underway + (23:48:18, 19 December 2024)
- ML20042A568 + (23:48:22, 19 December 2024)
- ML20042A567 + (23:48:22, 19 December 2024)
- ML20042A566 + (23:48:23, 19 December 2024)
- ML20042A565 + (23:48:24, 19 December 2024)
- 05000261/LER-1982-002, Forwards LER 82-002/03L-0 + (23:48:25, 19 December 2024)
- 05000316/LER-1981-067, Forwards Updated LER 81-067/03X-1 + (23:48:27, 19 December 2024)
- 05000323/LER-1981-002, Interim Deficiency Rept Re Inadequate Design of Sys Contained in Annulus Area of Containment Bldg,Initially Reported 811105.Further Info of Progress Is Identified in Suppls to LER 81-002 + (23:48:29, 19 December 2024)
- ML20042A560 + (23:48:30, 19 December 2024)
- 05000346/LER-1982-009-03, /03L-0:on 820209 & 0217,door 107 Was Found Blocked Open.Cause of First Incident Was Design Deficiency.Second Finding Caused by Personnel Error.Orientation & Requalification Classes & Contractor Classes Initiated + (23:48:32, 19 December 2024)
- 1CAN038204, Advises of Incorrect Statement in Util That HPI Safe End Weld Areas Were Inspected Using Radiographic Technique in 1977.Dye Penetrant Was Actual Insp Technique + (23:48:33, 19 December 2024)
- IR 05000315/1981022 + (23:48:35, 19 December 2024)
- ML20042A553 + (23:48:36, 19 December 2024)
- ML20042A555 + (23:48:36, 19 December 2024)
- PLA-1032, Part 21 Rept Re Existence of Goldfish in Spray Pond, Initially Reported 820303.Goldfish Elimination Will Be Completed Prior to Summer 1982.Util Will Periodically Examine Pond to Preclude Reintroduction of Fish Population + (23:48:37, 19 December 2024)
- 05000346/LER-1982-009, Forwards LER 82-009/03L-0 + (23:48:39, 19 December 2024)
- ML20042A549 + (23:48:42, 19 December 2024)
- ML20042A548 + (23:48:43, 19 December 2024)
- ML20042A547 + (23:48:44, 19 December 2024)
- ML20042A546 + (23:48:45, 19 December 2024)
- ML20042A545 + (23:48:46, 19 December 2024)
- 05000324/LER-1982-031-03, /03L-0:on 820209,water Leak Dripping on Primary Containment Atmospheric Monitor 2-CAC-ATH-1263,came in Contact W/Monitor Power Supply Transformer Resulting in Loss of Power.Transformer Replaced + (23:48:48, 19 December 2024)
- ML20042A543 + (23:48:50, 19 December 2024)
- 05000324/LER-1982-025-03, /03L-0:on 820215,routine Surveillance Revealed Oily Film on Inside Window to Main Steam Line Tunnel Temp High Channel B Actuation Relay A71B-K2B.Caused by Melted Insulation from Relay Coil.Relay 12HFA51A49F + (23:48:51, 19 December 2024)
- ML20042A539 + (23:48:53, 19 December 2024)