ML20042A545

From kanterella
Jump to navigation Jump to search
Proposed Changes to Tech Specs 6-16 & 6-17,allowing All Type B & C Leakage Tests Which Fail During Outage to Be Reported in One Ler,Within 30 Days of End of Outage
ML20042A545
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/10/1982
From:
GEORGIA POWER CO.
To:
Shared Package
ML20042A536 List:
References
TAC-48120, NUDOCS 8203230539
Download: ML20042A545 (4)


Text