ML20042A609
| ML20042A609 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/15/1982 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | Williams J NRC |
| Shared Package | |
| ML20042A610 | List: |
| References | |
| U-0437, U-437, NUDOCS 8203230610 | |
| Download: ML20042A609 (1) | |
Text
- _ ____ ____. _ _ _ _ _ _ _ - _ _.
a U-0437 N,
L30-82(03-15)-6 g
March 15, 1982 DOihlS)
,9 W R 2 2 fg
~
- IS$$$fe' ;b l
TO:
J. H. Williams
'*C N
l NRC Clinton Project Manager FROM:
George E. Wuller Illinois Power Company (217)424-6989 SUBJ:
Lake Clinton - Thermal Effluent Limitations l
Herb, per our conversation on 3/10, attached are copies of the following background documents on the subj ect matter.
These are provided to clarify the issue as related to the Clinton Unit 1 construction permit.
1.
May 14, 1981 - IPCB Order (R80-17; Docket PCB 81-82).
2.
May 28, 1981 - IPCB Order (R80-17).
3.
May 28, 1981.- IPCB Order (PCB 81-82).
4.
Ill. Register 6/19/81 - IPCB Notice of Proposed Repealer.
5.
June 25, 1981 - IPCB Opinion of the Board (PCB 81-82).
6.
August 20, 1981 - IPCB Proposed Opinion of the Board (R80-17).
7.
October 8, 1981 - IPCB Final Order of the Board (R80-17).
GEW/lt cc:
J. D. Geier J.
C. Henry, A-17 f0
/
//
!!M88e!4888g PDR
_ _ _ _ _ _ _ - _ - _ - _