Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044F223 + (18:04:58, 19 December 2024)
- ML20044F221 + (18:04:59, 19 December 2024)
- PNO-II-92-073, on 921026,automatic Reactor Trip Experienced Due to Turbine Trip w/high-high SG Level Condition for SG 3. Licensee Continuing to Investigate Extent of Water Intrusion by Blowing Down Low Points & Monitoring Dew Point Temps + (18:05:01, 19 December 2024)
- PNO-II-92-072, on 921024,facility Went Critical at 5:15 Am & Returned to Svc (Online) at 1:37 Pm,Following 23-day Shutdown.Facility Will Remain at 50% Power Level Until Repairs on Feedpump Recirculation Pipe Weld Complete + (18:05:03, 19 December 2024)
- 05000440/LER-1993-011, :on 930419,identified That Excessive Strainer Differential Pressure Across RHR Suction Strainers Could Have Compromised Long Term Cooling During LOCA Operation. Caused by Inadequate Program Requirements + (18:05:05, 19 December 2024)
- ML20044F215 + (18:05:07, 19 December 2024)
- ML20044F214 + (18:05:08, 19 December 2024)
- ML20044F209 + (18:05:10, 19 December 2024)
- ML20044F205 + (18:05:12, 19 December 2024)
- ML20044F204 + (18:05:17, 19 December 2024)
- ML20044F203 + (18:05:18, 19 December 2024)
- ML20044F202 + (18:05:21, 19 December 2024)
- TAC:M81658 + (18:05:22, 19 December 2024)
- ML20044F201 + (18:05:26, 19 December 2024)
- ML20044F199 + (18:05:28, 19 December 2024)
- ML20044F197 + (18:05:29, 19 December 2024)
- ML20044F193 + (18:05:30, 19 December 2024)
- ML20044F192 + (18:05:31, 19 December 2024)
- ML20044F191 + (18:05:32, 19 December 2024)
- ML20044F190 + (18:05:34, 19 December 2024)
- TAC:L30549 + (18:05:35, 19 December 2024)
- ML20044F188 + (18:05:36, 19 December 2024)
- ML20044F189 + (18:05:36, 19 December 2024)
- ML20044F186 + (18:05:37, 19 December 2024)
- ML20044F185 + (18:05:38, 19 December 2024)
- ML20044F184 + (18:05:39, 19 December 2024)
- PNO-II-92-071, providing Plant Status.Unit 4 Voluntarily Shut Down Awaiting Completion of FEMA Review of Offsite Readiness for Restart (After Hurricane Andrew) & NRC Concurrence.Unit 3 Currently Defueled & Scheduled to Restart About 921124 + (18:05:41, 19 December 2024)
- ML20044F180 + (18:05:42, 19 December 2024)
- ML20044F179 + (18:05:43, 19 December 2024)
- PNO-II-92-070A, on 921019,AIT Dispatched to Facility Following Reactor Trip Due to Loss of Ac Power Followed by Degraded Emergency Power Supply.Following Implementation of Corrective Actions,Facility Restarted on 921026 + (18:05:45, 19 December 2024)
- ML20044F176 + (18:05:46, 19 December 2024)
- PNO-II-92-069, on 921015,MOV Mistakenly Throttled to Spray Nozzles,Resulting in Initiation of Spray in Rb.Resident Inspector Observed RB Entry to Pump Down Lube Oil Collection Tanks & Assess Condition in RB + (18:05:49, 19 December 2024)
- PNO-II-92-068, on 921009,maint Technician Slipped Into Refueling Cavity.Individual Not Injured by Fall & No Ingesting or Inhalation Occurred.Individual Successfully Decontaminated of Contamination on Lower Half of Body + (18:05:51, 19 December 2024)
- PNO-II-92-067, on 921011,approx 8,000 Gallons of RWST Water Mistakenly Drained to Auxiliary Bldg Sump.Drain Down of RWST Isolated & Standing Water Pumped Into Waste Holdup Tank 1.No Radiation Released to Environ.Pr Issued on 921012 + (18:05:53, 19 December 2024)
- ML20044F172 + (18:05:54, 19 December 2024)
- PNO-II-92-064, on 920930,alert Declared Due to Release of Toxic Gas in Vital Area.Licensee Has Reported That Release Had No Impact on safety-related Equipment & Plant Continues to Operate at 100% Power + (18:05:56, 19 December 2024)
- ML20044F170 + (18:05:57, 19 December 2024)
- PNO-II-92-061, on 920923,licensee Reported Potential Radiological Contamination Event Involving Am-241 Source. Licensee Has Placed Individuals Involved in Event Under Bioassay Program Involving Fecal Sampling & Urinalysis + (18:05:59, 19 December 2024)
- PNO-II-92-060, on 920923,licensee Reported That Troxler Model 3411B Portable Moisture Density Gauge Lost.If Gauge Not Located During Second Search,Licensee Will Prepare Press Release Describing Matl Lost + (18:06:01, 19 December 2024)
- ML20044F166 + (18:06:03, 19 December 2024)
- PNO-II-92-059, on 920918,contract Worker in Containment Slipped & Twisted Knee.Licensee Presently Responding to Media Interest Re Why Worker & Ambulance Attendants Unnecessarily Treated as Potentially Contaminated + (18:06:03, 19 December 2024)
- PNO-II-92-058, on 920914,facility Completed Normal Shutdown to Repair Seat Leakage from Pressurizer Safety Valve V1202 & Shutdown Exceeded 72 H.Valve Will Be Removed & Spare Safety Valve Installed + (18:06:06, 19 December 2024)
- ML20044F162 + (18:06:06, 19 December 2024)
- ML20044F160 + (18:06:07, 19 December 2024)
- ML20044F159 + (18:06:08, 19 December 2024)
- ML20044F157 + (18:06:09, 19 December 2024)
- 05000341/LER-1993-007, :on 930420,reactor Tripped on Intermediate Range Monitor Upscale During Reactor Pressure & Feedwater Transient.Caused by Personnel Error.Affected Pressure Transmitters Replaced + (18:06:11, 19 December 2024)
- ML20044F155 + (18:06:13, 19 December 2024)
- 05000334/LER-1993-007-01, :on 930423,discoverd That Original Piping Did Not Conform to Design Code Requirement.Caused by Design Deficiency.Headers Fitted W/Code Approved End Caps & Tested & Now Conform to Design Requirements + (18:06:14, 19 December 2024)
- ML20044F153 + (18:06:15, 19 December 2024)
- 05000334/LER-1993-008, :on 930423,leakage Detected Through Two Check Valves in Chlorine Injection Line.Caused by Failure to Include Valves in ASME Section XI Testing Program.Check Valves Added to ASME Testing Program + (18:06:17, 19 December 2024)