Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045E718 + (16:22:16, 19 December 2024)
- ML20045E714 + (16:22:18, 19 December 2024)
- ML20045E713 + (16:22:19, 19 December 2024)
- ML20045E711 + (16:22:19, 19 December 2024)
- LD-93-096, Forwards Submittal 3 of Sys 80+ Design Descriptions & Associated ITAAC for Review & Approval + (16:22:21, 19 December 2024)
- ML20045E708 + (16:22:23, 19 December 2024)
- ML20045E707 + (16:22:24, 19 December 2024)
- ML20045E706 + (16:22:25, 19 December 2024)
- ML20045E704 + (16:22:26, 19 December 2024)
- ML20045E703 + (16:22:27, 19 December 2024)
- ML20045E701 + (16:22:29, 19 December 2024)
- 05000362/LER-1993-003, :on 930527,discovered Three Containment Isolation Valves w/motor-operator Switch Setttings Nonconservative,Per GL 89-10.Caused by Using Outdated Configuration.Valves Secured + (16:22:30, 19 December 2024)
- ML20045E696 + (16:22:32, 19 December 2024)
- ML20045E693 + (16:22:32, 19 December 2024)
- ML20045E692 + (16:22:34, 19 December 2024)
- ML20045E689 + (16:22:35, 19 December 2024)
- ML20045E688 + (16:22:36, 19 December 2024)
- ML20045E681 + (16:22:38, 19 December 2024)
- ML20045E683 + (16:22:38, 19 December 2024)
- ML20045E680 + (16:22:40, 19 December 2024)
- ML20045E679 + (16:22:41, 19 December 2024)
- ML20045E678 + (16:22:44, 19 December 2024)
- ML20045E677 + (16:22:45, 19 December 2024)
- ML20045E676 + (16:22:46, 19 December 2024)
- ML20045E675 + (16:22:47, 19 December 2024)
- ML20045E674 + (16:22:48, 19 December 2024)
- LD-93-097, Forwards Response to NRC Request for Addl Info to Suppl Info on Sys 80+ Design Descriptions.Vendor Performing Integrated Review of CESSAR-DC & Design Descriptions/Itaac to Ensure Consistency W/Documents Already Submitted + (16:22:50, 19 December 2024)
- ML20045E672 + (16:22:50, 19 December 2024)
- HL-3358, Responds to NRC Re Violation Noted in Insp Repts 50-321/93-07 & 50-366/93-07.Corrective Actions:Involved Individual Disciplined & Memo Issued to Personnel W/Emphasis on Complying W/Radiological Protection Postings + (16:22:52, 19 December 2024)
- ML20045E667 + (16:22:54, 19 December 2024)
- ML20045E666 + (16:22:55, 19 December 2024)
- BVY-93-063, Proposed Change 172 to License DPR-28,clarifying TS Definition of Alteration of Reactor Core + (16:22:56, 19 December 2024)
- ML20045E663 + (16:22:58, 19 December 2024)
- ML20045E661 + (16:22:59, 19 December 2024)
- ML20045E659 + (16:23:00, 19 December 2024)
- ML20045E657 + (16:23:01, 19 December 2024)
- 05000298/LER-1993-024, :on 930527,discovered That Testing of Four Reactor Vessel Low Water Level RPS Sensors Not Completed as Scheduled.Caused by Personnel Error.Stroke Testing Suspended & Surveillance Testing Completed + (16:23:03, 19 December 2024)
- ML20045E653 + (16:23:12, 19 December 2024)
- IR 05000327/1993009 + (16:23:13, 19 December 2024)
- ML20045E647 + (16:23:15, 19 December 2024)
- JPN-93-044, Proposed Tech Spec 4.7.A.2.f Re Containment Leak Rate Testing + (16:23:16, 19 December 2024)
- ML20045E637 + (16:23:18, 19 December 2024)
- ML20045E641 + (16:23:18, 19 December 2024)
- ML20045E629 + (16:23:19, 19 December 2024)
- ML20045E628 + (16:23:21, 19 December 2024)
- ML20045E627 + (16:23:22, 19 December 2024)
- ML20045E624 + (16:23:23, 19 December 2024)
- ML20045E623 + (16:23:24, 19 December 2024)
- ML20045E622 + (16:23:32, 19 December 2024)
- ML20045E615 + (16:23:35, 19 December 2024)
- NG-93-2450, Confirms That Util Will Include Propane Tank in Ipeee,As Part of Resolution for GSI 106.Completion of IPEEE Scheduled for Nov 1995,as Described in Util + (16:23:36, 19 December 2024)