m ]C_ James E, Cross-Portland General SectricCompany Vice President and Chief Nuclear Officer June 28, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington DC 20555
Dear Sirs:
Cat 1CallalinILSflumi1Mula Due to the permanent shutdown of the Trojan Nuclear Plant, Portland General Electric Company'is canceling several commitments that were made based on the assumption of continued operation. These commitments are described in the attachment.
PGE is continuing to review commitments made to the Nuclear Regulatory Commission. Additional commitments identified that should be. canceled or modified will be the subject of future correspondence.
Sincerely,
[&
Attachment c:
Mr. Bobby H. Faulkenberry Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. J. F. Melfi NRC Resident Inspector t-Trojan Nuclear Plant l
4 0\\
0200!M 0
\\
j 9307020330 930628 PDR ADOCK 05000344 p
PDR 121 S W Sa mon Stwt Pcriand. Oregon 97204 (503)464-8897
Trojan Nuclear Plant Document Control Desk.
Docket 50-344
' June 28, 1993 License NPF-1 Attachment Page 1 of 5 NUCLEAR REGULATORY COMMISSION -(NRC) COMMI'It4ENTS BEING CMCELED_0B_CliMGED_DHE_ID_IHE PERMANENI_EJIHIDOWN OF TROJM A.
Commitment NRC Inspection Report 50-344/91-39 documented a commitment by Portland General Electric Company (PGE) to change'the operating characteristics for the Control Room Emergency Recirculation System (CB-16).
Current Action This action was intended to improve the reliability of CB-16 and does not affect the system's operability. The reliability problem is due to CB-16 tripping on low oil pressure due to cyclic operation at low load.
During low load conditions, the Control Room Emergency Ventilation System (CB-1) is capable of handling the entire cooling load if CB-16 trips. During high load conditions, CB-16 is not subjected to cyclic-operations.
In the event CB-16 does trip when needed to maintain Control Room temperature, the Control Room heat up rate is low enough to' permit operators to reset CB-16.
Based on the above discussion, CB-16 will not be modified.
B.
Commitment NRC Inspection Report 50-344/92-30 documented a commitment by PGE ~ to" assess the delay in implementing the air operated valve (A0V) action plan.
Current Actinn The purpose of the A0V action plan was to enordinate and track activities required to convert the existing Preventive Maintenance Program for A0Vs into a formal A0V Program. - Since Trojan has been permanently defueled,.the number of A0Vs required to remain operabic has been significantly decreased.
The Preventive Maintenance Program will continue to be used for the-A0Vs required to be operable while defueled. The A0V action plan has been canceled and PGE will not assess the delay in implementing the action plan.
-y e,m
.r,n-,
,y,,
-- + -,
s-
..r,--
, - ~
, Trojan Nuclear Plant' Document Control: Desk
'I Docket 50-344 June 28, 1993 License NPF-1 Attachment.
Page 2 of 5 C.
Commitmani In a letter dated November 19, 1992, PGE committed to' inform.the.NRC of the results of a program to develop a volumetric examination of the steam generator. nozzle inner radii.
Current _Antion
-The Trojan 1 Plant is in a permanently defueled condition and the Reactor Coolant System is no longer required. This test is no longer necessary.
D.
Commitment 7
In a letter dated July 26, 1991, PGE committed to review the ef fectiveness of the Design Control Program.
1 CMrrent Antinn An effectiveness review of the Design Control Program was begun in December,.1992. Due to the permanent closure of Trojan both the scope and controls of the Design Change Program will be significantly l
changed. A review of the existing program is not warranted and the effectiveness review begun-in December has been canceled.
E.
CQEGitment In a letter dated June 1, 1992, PGE committed to pursue a flow-measurement installation for the centrifugal charging and boric acid transfer pumps that did not rely on temporary instruments.
Currsni_ Action i
The centrifugal charging and boric acid transfer pumps are not required to be operable while defueled; therefore, this installation fi will not be pursued.
F.
Commitment In the Fire Protection / Appendix R-Program Milestone Update letter to the NRC, PGE committed to implement modifications required to support -
)
a revised Appendix R safe shutdown methodology.
I
-l io
-. L
- a
_.. -~.
, Trojan Nuclear Plant Document Control Desk Docket 50-344 June.28,. 1993
' License NPF-1 Attachment Page 3 of 5 Current Action Since Trojan's Operating License has been amended to a Possession.
Only License the requirements of 10 CFR 50, Appendix R do not apply to Trojan.
This action will not be completed.
G.
Commilment In a letter dated June 1, 1992, PCE committed to perform additional leak testing of the Cable Spreading Room floor using revised acceptance criteria.
Currant _Acilan Post modification testing following the sealing of the Cable Spreading Room floor resulted in no significant leakage. Drip shields were installed over open electrical cabinets and the penetrations in other electrical cabinets have been sealed.
Based on the above, no additional test of the Cable Spreading Room floor will be performed.
H.
Commitmani In the exit meeting for NRC inspection 50-344/92-32, PGE committed to.
revise Periodic. Engineering Test (PET)'5-2, " Containment Local Leak Rate Testing", for deficiencies related to. technical content and specificity of work.
Current Atilon i
By letter dated April 12, 1993, the NRC granted PGE relief-from the Containment testing requirements of 10 CFR 50.54(o) and 10 CFR 50, Appendix J.
PET 5-2 will not be revised.
I.
Camilment i.
Due to a change in motor operated valve (MOV) testing approach, PGE
.l committed to retest three MOVs during their. Generic Letter 89-10 Test
~j
' Program schedule..This commitment was documented in NRC Inspection 1
Report 50-344/92-09.
1 l
I
- i
'l
'l
~
, Trojan Nuclear Plant Document Control Desk Docket 50-344 June 28, 1993 License NPF-1 Attachment Page 4 of 5 i
t Current _Antion Since Trojan has been permanently defueled, the scope of the'MOV Testing Program has been significantly reduced.
The three valves involved in the above commitment are no longer' included in the Testing Program; therefore, they will not be retested.
J.
Commitment In the response to Generic Letter 89-10, PGE committed to an MOV testing schedule that included valves to be tested in 1993, 1995,
(
and 1996.
Current Action Since Trojan has been permanently defueled, the scope of the MOV Testing Program has been significantly reduced. The valves'to be tested in 1993, 1995, and 1996 are no longer included in the. Testing Program; therefore, they will not be tested.
t N.
Commt% ment i
In a letter dated March 26, 1991, PGE submitted a simulator test plan-to comply with the requirements of 10 CFR 55.45(b)(5)(vi).
CurrenL_ Ant 19n Two years of the four-year test cycle have been completed. PGE has discontinued licensed operator training and examinations on the simulator.
Simulator certification will not be maintained and the four-year test cycle will not be completed.
L.
Commitment In Licensee Event Report 91-37, " Failure to Comprehensively Test Manual Engineered Safety Features Actuation Functions and Process Radiation Monitor Due to Deficiency in Surveillance Test Program",.
PGE listed significant activities specified in an action plan established in 1990 to correct deficiencies with the Trojan Surveillance Testing Program. These actions were listed for information as they were pertinent to the situation ~ described in the Licensee Event Report.
i f
- 3 n
a
-,--n
.w r
Trojan Nuclear Plant Document Control Desk Docket 50-344
.hne 28, 1993 License NPF-1 Attachment
-Page 5 of 5 Current _ Action Three of the four listed items were completed. The incomplete. item is to " Write existing surveillance processes into Surveillance
_l Procedures.
Due to the permanent closure.of Trojan, the Technical Specification Surveillance Program will be undergoing major revision. The surveillance processes that existed at the time the action plan was written have changed as a result of the_ plant closure. This action is no longer applicable to the current i
Surveillance Program and will not be completed.
M.
Commitmani In Licensee Event Report 92-26 " Fire Barrier Deficiencies Identified As Result of Ongoing Fire Barrier Surveillance Program", Revision 4, PGE committed to repair fire barriers T-063-01 and T-063-02 with a fire barrier caulk.
C.urranLAction Due to the permanent closure of Trojan, these fire barriers will not be repaired with a fire barrier caulk.
PGE will instead mainisin the required compensatory measures.