Requests Exemption from 10CFR50,App J to Allow for Replacement of Piping & Welds Which Constitute Portions of Core Spray Sys Min Flow Lines W/O Having to Perform Type a Ilrt.Application for Amend to License DPR-59 Encl
ML20045E629
Person / Time
Site: FitzPatrick 
Issue date: 06/28/1993
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045E630 List:
References
JPN-93-044, JPN-93-44, NUDOCS 9307020256
Download: ML20045E629 (3)


Text

.

123 Main Street Wh.te Ptams, fJew York 1C601 914 681 6?46 Ralph E. Deedic Aufhon.ty e-ce1~e v.ce eresee,i Nuclear Generation June 28,1993 JPN-93-044 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 t

ATTN: Document Control Desk

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Exemption from 10 CFR 50 Appendix J and Proposed Technical Specification Changes Reaardino Containment Leak Rate Testina (JPTS-93-007)

References:

1.

NYPA letter, J. C. Brons to NRC, dated September 28,1989 (JPN-89-062), " Exemption from 10 CFR 50 Appendix J and

+

Proposed Change to the Technical Specifications Regarding i

Containment Leak Rate Testing (JPTS-89-025)."

2. NRC letter, D. E. LaBarge to J. C. Brons, dated October 4, 1989, issuing Amendment 140 to the FitzPatrick Technical Specifbations.

In accordance with 10 CFR 50.12 and 50.90, the Authority requests an exemption from 10 CFR 50, Appendix J and an amendment to the James A.

FitzPatrick Technical Specifications. This exemption and amendment would allow for the replacement of piping and welds which constitute portions of the Core Spray system minimum flow lines, without having to perform a Type A Integrated Leakage Rate Test (ILRT) as required by the Technical Specifications and 10 CFR 50 Appendix J. The next ILRT is scheduled to be conducted during the 1995 refueling outage. As described in the attachments, these requests satisfy the criteria for exemptions and an amendment to tha Technical Specifications.

Augmented erosion / corrosion inspections conducted during the 1992 refueling outage revealed the presence of pipe wall thinning on the Core Spray.

System minimum flow lines. In accordance with the requirements of ASME i

Section XI and ANSI B-31.1-1967 (the construction code for the FitzPatrick L

plant) approximately 5 feet of the "A" and *B" Core Spray System minimum flow piping will be replaced during the f all maintenance outage.

0200y

.Q$

n7E8sEnllg3 i

P r

a

)

Compensatory measures consist of an alternate inspection program, including 100% radiography of the new welds, surface examination on new welds that form a portion of the primary containment boundary, and a system leakage test (in accordance with ASME Section XI code,1980 Edition through winter 1981 Addenda, paragraph IWA-5213) to ensure structural integrity and -

leak tightness. These non-destructive examinations meet the intent of the Technical Specifications 4.7.A.2.f and Appendix J, which is to assure that modifications to the containment pressure boundary are leak-tight.

I This situation is very similar to the 1989 repair of weld 10-14-884A on the Core Spray System test return line. That weld repair required the creation of a new weld which could not be localleak rate tested. The Authority requested an exemption from 10 CFR 50, Appendix J and a change to the Technical Specifications (Reference 1). This request was granted by the NRC in i

Reference 2.

The Authority requests that this exemption request and amendment application be approved prior to startup from the fall 1993 maintenance outage currently schedaled to end in September.

Attachment i to this application contains the request for exemption from 10 CFR 50 Appenjix J,-Section IV.A. The proposed change to the Technical

[

Specifications is provided as Attachment ll. The Safety Evaluation for the proposed chEnge is included as Attachment 111. Attachment IV provides a copy of drawing FM-23A, " Flow Diagram - Core Spray System 14."

i in accordance with 10 CFR 50.91, a copy of this application and the i

associated attachments are being provided to the designated New York State

+

Official.

if you have any questions, please contact Mr. J. A. Gray, Jr.

Very truly yours, i

[m gj Ralph E. Beedle Executive Vice President j

Nuclear Generation cc:

U.S. Nuclear Regulatory Commission 475 Allendale Road i

King of Prussia, PA 19406 Office of the Resident inspector j

U.S. Nuclear Regulatory Commission P.O. Box.136 Lycoming, NY 13093 i

j

t t

Mr. Brian C. McCabe Project Directorate 1-1 Division of Reactor Projects - 1/11 i

U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 -

i Ms. Donna Ross i

New York State Energy Office 2 Empire State Plaza 16"' Floor Albany, NY 12223 i

h 5

b b

t I

l l

h i

I i

4 F

'l 1

5

..