Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045G794 + (15:48:35, 19 December 2024)
- ML20045G793 + (15:48:36, 19 December 2024)
- ST-HL-AE-4509, Forwards Correction to Page 1 of Attachment 1 to Re Description of Changes & Affected Pages to Unit 1 Pump & Valve Inservice Test Plan,Rev 6 + (15:48:37, 19 December 2024)
- 05000416/LER-1993-005, :on 930608,indicated That Response Time Test for RCIC Low Steam Pressure Isolation Instrumentation Invalid.Caused by Inappropriate Test Method.Procedures Governing Method of Testing Will Be Revised + (15:48:40, 19 December 2024)
- JAFP-93-0309, Discusses Unreported Change in Physical Status of Licensed Operators.Caused by Lack of Sufficient Administrative Guidance for Tracking Licensed Operator Status W/Respect to ANSI Requirements.Improved Checklist to Be Used + (15:48:44, 19 December 2024)
- ML20045G789 + (15:48:46, 19 December 2024)
- 05000219/LER-1993-004-01, :on 930602,discovered Potential Torus Condition Outside Design Basis.Caused by Inadequate Design Info. Documentation Procedures Revised.Torus Calculations to Include Peak Pressure Info + (15:48:47, 19 December 2024)
- ML20045G786 + (15:48:49, 19 December 2024)
- ML20045G785 + (15:48:50, 19 December 2024)
- ML20045G783 + (15:48:50, 19 December 2024)
- ML20045G782 + (15:48:52, 19 December 2024)
- ML20045G781 + (15:48:53, 19 December 2024)
- ML20045G780 + (15:48:54, 19 December 2024)
- ML20045G779 + (15:48:54, 19 December 2024)
- ML20045G778 + (15:48:55, 19 December 2024)
- ML20045G777 + (15:48:56, 19 December 2024)
- ML20045G776 + (15:48:56, 19 December 2024)
- ML20045G774 + (15:48:58, 19 December 2024)
- ML20045G772 + (15:48:58, 19 December 2024)
- ML20045G771 + (15:48:59, 19 December 2024)
- ML20045G770 + (15:49:00, 19 December 2024)
- ML20045G769 + (15:49:02, 19 December 2024)
- ML20045G768 + (15:49:03, 19 December 2024)
- ML20045G766 + (15:49:04, 19 December 2024)
- ML20045G767 + (15:49:04, 19 December 2024)
- ML20045G764 + (15:49:05, 19 December 2024)
- ML20045G763 + (15:49:06, 19 December 2024)
- ML20045G762 + (15:49:07, 19 December 2024)
- ML20045G761 + (15:49:08, 19 December 2024)
- ML20045G759 + (15:49:09, 19 December 2024)
- ML20045G757 + (15:49:10, 19 December 2024)
- ML20045G756 + (15:49:10, 19 December 2024)
- ML20045G753 + (15:49:12, 19 December 2024)
- B14513, Proposed Tech Specs Changing Bases Sections 3.5.A,3.5.B & 3.5.C to Provide long-term post-accident Core & Containment Cooling & to Clarify Basis & Identify Components Comprising FWCI Subsystem + (15:49:13, 19 December 2024)
- ML20045G751 + (15:49:16, 19 December 2024)
- ML20045G750 + (15:49:17, 19 December 2024)
- ML20045G747 + (15:49:18, 19 December 2024)
- ML20045G745 + (15:49:19, 19 December 2024)
- ML20045G742 + (15:49:20, 19 December 2024)
- ML20045G743 + (15:49:20, 19 December 2024)
- ML20045G738 + (15:49:22, 19 December 2024)
- ML20045G741 + (15:49:22, 19 December 2024)
- ML20045G737 + (15:49:23, 19 December 2024)
- ML20045G734 + (15:49:24, 19 December 2024)
- ML20045G735 + (15:49:24, 19 December 2024)
- RBG-38-699, Submits Antitrust License Condition Per 930113 Application for Amend to License NPF-7,in Response to 930204 Meeting W/ Nrc.Condition Approves Addition of Entergy Operations,Inc to License as Operator of Facility + (15:49:25, 19 December 2024)
- ML20045G732 + (15:49:27, 19 December 2024)
- ML20045G731 + (15:49:28, 19 December 2024)
- ML20045G730 + (15:49:28, 19 December 2024)
- 05000254/LER-1993-005-05, :on 930609,numerous Alarms Received in CR, Including HPCI Turbine Rupture Disc High Pressure Alarm. Caused by Ruptured Disk,Releasing Steam/Water Mixture. Test Will Be Conducted on Rupture Disks + (15:49:30, 19 December 2024)
- 05000318/LER-1993-002-01, :on 930608,inadvertent Arw Actuation Sys & RPS Actuations Experienced During Performance of Awf Sys Large Flow Surveillance Testing.Caused by Failure to Note Differential Pressure Condition.Valve Opened + (15:49:32, 19 December 2024)