Forwards Notice of Violation for Failure to Notify Nrc,Per Requirements of 10CFR55.25 Re Change in Physical Status of Licensed Operators
ML20045G786
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/07/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harry Salmon
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20045G787 List:
References
NUDOCS 9307150186
Download: ML20045G786 (3)


Text

m o;*

j l

JUL y1993 Doch et No. 50-333 Mr. harry P. Salmon, Jr.

Resident Manager New York Power Authority Jaraes A. FitzPatrick Nuclear Power Plant-Post Office Box 41 Lycoming, New York 13093

Dear Mr. Salmon:

SUBJECT:

CHANGE IN PHYSICAL STATUS OF LICENSED OPERATORS By your letter dated May 28,1993, which is enclosed, we were informed of two cases in which the required notification of a change due to medical conditions of licensed operators was not reported to the NRC within 30 days of learning of the diagnosis.

Based on the information supplied, it appears that your organization was not in full

.I compliance with NRC requirements. A Notice of Violation is enclosed and categorizes the violation by severity level in accordance with " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C.

Since your letter also describes the reason for the failure to notify the NRC, the corrective steps to preclude recurrence and that all other licensed operators medical examinations and license restrictions have been verified to be current and correct, no response to this violation

-i is required. We will review your actions in a future inspection of your license activities.

In accordance with Section 2.790 of 10 CFR Part 2, a copy of this letter and your May 28,1993, letter will be placed in the Public Document Room.

G:FITZVIO.1 OFFICIAL RECORD COPY i

A A d gn L

130000 jfv0'3 9307150186 930707 Q

I 1

1 PDR ADOCK 05000333 tg PDR lj; i

y

~

JUL 7 199)

Mr. Harry P. Salmon, Jr.

2 Your cooperation with us is appreciated.

Sincerely,

%<Y f

Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety

Enclosure:

Notice of Violation New York Power Authority letter dated May 28,1993 cc w/ encl:

R. Schoenberger, President R. Beedle, Executive Vice President - Nuclear G. Goldstein, Assistant General Counsel J. Gray, Jr., Director, Nuclear Licensing - BWR Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Director, Energy & Water Division, Department of Public Service,- State of New York K. Abraham, PAO (30) SALP Reports and (2) All Inspection Reports Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York, SLO Designee bec w/ encl:

Region I Docket Room (with concurrences)

V. McCree, OEDO R. Capra, NRR J Menning, NRR g.

~T9 NJ jp S RI:DRS RI:DRS hausen i et jk C

/

07/)_ /93 07/6/93 074/93 G: FIT 2VIO.1 OFFICIAL RECORD COPY

.