ML20045G770

From kanterella
Jump to navigation Jump to search
Notification of 930612 & 13 Meetings w/ABB-C-E in Rockville, MD to Discuss Operating Procedures Validation & Design of Nuplex 80+ Control Complex.Agenda Encl
ML20045G770
Person / Time
Site: 05200002
Issue date: 07/09/1993
From: Stewart Magruder
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9307150154
Download: ML20045G770 (4)


Text

.

p@cavQ g 47-WtG UNITED STATES

,., e M ti E

. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20566 0001

/

4 July 9, 1993 Docket No.52-002 P

MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski R. Gallo E. Adensam F. Congel J. Partlow B. Grimes E. Butcher D. Crutchfield W. Travers J. Wiggins-W. Bateman,'ED0 T. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo M. Virgilio C. Rossi

~ ~

~~ ~

THRU:

R. W.'Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors.

and License Renewa' Office of Nuclear Rector Regulation FROM:

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors e

and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+-(HUMAN. FACTORS MEETING)

DATES AND July 12, 1993 (10 a.m. - 5 p.m.)

4 TIMES:

July 13, 1993 (9:45 a.m. - 5 p.m.)

'l LOCATION:

U. S. Nuclear Regulatory Commission One White Flint North 1

11555 Rockville Pike q

Rockville, Maryland 20852 l-F-19 (July 12, 1993) 13-B-15 (July 13, 1993)

PURPOSE:

Meeting to discuss operating procedures validation and design of Nuplex 80+ control complex. A proposed _ agenda is enclosed.

O khb 93o7150154 930709

~ P DR ADOCK 05200002 6

^

tw

_ q

. July 9, 1993 PARTICIPANTS *:

NRC A!LB-CE C. Thomas C. Brinkman G. West D. Harmon R. Eckenrode R. Fuld J. Bongarra G. Galletti S_N_L S. Magruder W. Stubler (Original signed by)

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees' are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

Members of the public who wish to attend should contact me at (301) 504-3139.

DISTRIBUTION:

Docket File PDST R/F SBajwa, 12G18 MXFranovich PDR TEssig TVWambach RBorchardt PShea OPA EJordan, MNBB 3701 GGrant, ED0 ACRS (11), w/o enc 1.

RPerch, 8D1 NRR Mailroom,12C'8 P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES CMcCracken, 8D1 MPratt, 7E4 Receptionist, WF SMagruder JBongarra, 10D24 GWest, 10D24 REckenrode, 10024 CThomas, 10H5 GGalletti, 10D24 kPDST:ADp rd:PDST:ADAR SC:PDSl:ADA,R 0FC:

NAME: PShb

}SMagrude$z TEssig/j@

[3/93 07/3/93 07/q /93 DATE:

0FFICIAL DOCUMENT COPY:

CEHFMTG.SLM

ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. C. B. Brinkman, Acting Director Nuc? ear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

l '.

Agenda System 80+

Human Factors Meeting July 12-13, 1993 Monday. July 12. 1993. Room 1-F-19 10:00 - 10:15

Introductions

10:15 - 12:30 Discuss Resolution of Procedural Issue a

12:30 - 01:30 Lunch 01:30 - 04:30 Continu2 Discussion on Procedural Issue 04:30 - 05:00 Wrap-up/ Discuss schedule.

Tuesday. July. 13. 1993. Room 13-B-l5 09:45 - 11:30 Discuss Staff Comments on Nuplex 80+ HSI Design 11:30 - 12:30 Lunch 12:30 - 04:30 Continue Discussion on Nuplex 80+ HSI Design 04:30 - 05:00 Wrap-up/ Discuss schedule Enclosure