Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1982-012-03, /03L-0:on 820119,routine QA Audit of Fire Protection Sys Test Found Three Valves Marked Not Accessible & Had Not Been Checked.Caused by Personnel Error.Periodic Test Performed & Valves Found in Correct Position + (10:27:42, 19 December 2024)
- 05000324/LER-1982-026-03, /03L-0:on 820202,low Level Switch, 2-B21-LIS-NO31B-2,which Provides One of Signals Required to Initiate Automatic Depressurization Sys Failed.Cause Could Not Be Determined.Switch Replaced + (10:27:51, 19 December 2024)
- 05000324/LER-1982-026, Forwards LER 82-026/03L-0 + (10:28:07, 19 December 2024)
- 05000261/LER-1982-033, Forwards LER 82-033/01X-1 + (10:28:11, 19 December 2024)
- 05000369/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl + (10:28:14, 19 December 2024)
- ML20049J499 + (10:28:17, 19 December 2024)
- 05000260/LER-1982-008-03, /03L-0:on 820127,after Calibr,Rod Block Monitor Channel B Failed to Pass Functional Test of SI 4.2.C-2. Caused by Electronic IC Failure Possibly Due to Voltage Spike During Calibr.Ge 136B1333G1 Gain Change Card Replaced + (10:28:20, 19 December 2024)
- 05000280/LER-1982-013-03, /03L-0:on 820126,dropped Control Rod Resulted in Quadrant to Average Power Tilt of Greater than 2%.Caused by Corroded Conductors in Power Supply Due to Break in Cable Admitting Moisture.Cable Repaired & Control Rod Realigned + (10:28:26, 19 December 2024)
- ML20049J496 + (10:28:35, 19 December 2024)
- 05000260/LER-1982-008, Forwards LER 82-008/03L-0 + (10:28:48, 19 December 2024)
- 05000280/LER-1982-019-03, /03L-0:on 820202,PT-27 Revealed Ampere Readings for Heat Tracing Circuits 24C,25A,panel 2 & Circuit 24D, Panels 1 & 2 (Boron Injection Tank Recirculation Line) Below Acceptance Criteria.Caused by Loss of Heat Tracing + (10:29:04, 19 December 2024)
- ML20049J488 + (10:29:23, 19 December 2024)
- ML20049J487 + (10:29:24, 19 December 2024)
- ML20049J486 + (10:29:25, 19 December 2024)
- 05000260/LER-1982-010-03, /03L-0:on 820121,during Full Power Operation SI 4.1.B.2 (APRM Output Signal Calibr) Not Performed within Required Frequency During 811014-28.Caused by Personnel Error + (10:29:28, 19 December 2024)
- 05000280/LER-1982-011-03, /03L-0:on 820126,three Incidents of Unsampled Release from Subsurface Drains to Discharge Canal Occurred. Caused by Operator Error.Administrative Controls Established to Notify Health Physics Prior to Pumping of Drains + (10:29:33, 19 December 2024)
- ML20049J483 + (10:29:42, 19 December 2024)
- ML20049J481 + (10:29:44, 19 December 2024)
- 05000259/LER-1982-015-03, /03L-0:on 820209,instrumentation O-XR-90-102-1, O-XR-90-102-2 (620 MSL Windspeed & Direction) & O-XR-90-103 (737 MSL Wind Direction) Failed.Caused by Lightning Striking Environ Data Station.Instrumentation Replaced + (10:29:47, 19 December 2024)
- ML20049J478 + (10:29:49, 19 December 2024)
- ML20049J477 + (10:29:51, 19 December 2024)
- 05000327/LER-1982-017-03, /03L-0:on 820128,during Insp & testing,safety- Related Mechanical Snubbers 47A053-272,47A053-300 & 1-CVCH-914 Discovered Inoperable.Caused by Corrosion of First & Bent Retaining Nut Guide Rods on Latter Two + (10:29:56, 19 December 2024)
- 05000259/LER-1982-015, Forwards LER 82-015/03L-0 + (10:30:02, 19 December 2024)
- 05000328/LER-1982-016-03, /03L-0:on 820127,steam Generator Pressure Channels for Loops 3 & 4 to Remote Shutdown Instrumentation Declared Inoperable Due to Failure to Meet Channel Check Requirements.Caused by Open Circuit on Loop 2-PI-1-19C + (10:30:16, 19 December 2024)
- ML20049J468 + (10:30:24, 19 December 2024)
- 05000328/LER-1982-016, Forwards LER 82-016/03L-0 + (10:30:27, 19 December 2024)
- ML20049J465 + (10:30:31, 19 December 2024)
- ML20049J464 + (10:30:37, 19 December 2024)
- ML20049J463 + (10:30:38, 19 December 2024)
- 05000327/LER-1982-017, Forwards LER 82-017/03L-0 + (10:30:43, 19 December 2024)
- ML20049J459 + (10:30:46, 19 December 2024)
- ML20049J458 + (10:30:48, 19 December 2024)
- ML20049J456 + (10:30:49, 19 December 2024)
- ML20049J455 + (10:30:50, 19 December 2024)
- ML20049J453 + (10:30:52, 19 December 2024)
- ML20049J452 + (10:30:53, 19 December 2024)
- ML20049J448 + (10:30:55, 19 December 2024)
- ML20049J447 + (10:30:56, 19 December 2024)
- ML20049J446 + (10:31:06, 19 December 2024)
- ML20049J445 + (10:31:24, 19 December 2024)
- ML20049J444 + (10:31:26, 19 December 2024)
- IR 05000289/1981020 + (10:31:39, 19 December 2024)
- ML20049J440 + (10:31:43, 19 December 2024)
- ML20049J439 + (10:31:44, 19 December 2024)
- ML20049J438 + (10:31:46, 19 December 2024)
- ML20049J437 + (10:31:49, 19 December 2024)
- ML20049J436 + (10:31:50, 19 December 2024)
- ML20049J435 + (10:31:51, 19 December 2024)
- ML20049J433 + (10:32:06, 19 December 2024)
- ML20049J432 + (10:32:07, 19 December 2024)
- ML20049J431 + (10:32:11, 19 December 2024)