Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058L106 + (13:21:04, 17 December 2024)
- ML20058L105 + (13:21:05, 17 December 2024)
- 05000482/LER-1993-014, :on 900501,essential Svc Water Low Flow Prior to Refueling Outage Occurred.Cause Unknown.Reportability Determination Process Revised,Rers Logged & Entered Into Tracking Database + (13:21:07, 17 December 2024)
- ML20058L099 + (13:21:09, 17 December 2024)
- ML20058L096 + (13:21:09, 17 December 2024)
- BSEP-93-0185, Application for Amends to Licenses DPR-62 & DPR-71, Correcting TS Pages Issued for Amend 166 for Unit 1 & Amend 197 for Unit 2 Re Numac Steam Leak Detection Equipment + (13:21:12, 17 December 2024)
- 05000327/LER-1990-016-03, :on 900629,determined That Containment Purge Had Been Initiated on 900628 W/O Disabling Steam Generator Water Level Environ Allowance Modifier.Caused by Personnel Error.Limiting Condition for Operation Entered + (13:21:13, 17 December 2024)
- ML20058L089 + (13:21:14, 17 December 2024)
- ML20058L086 + (13:21:19, 17 December 2024)
- ML20058L082 + (13:21:20, 17 December 2024)
- ML20058L079 + (13:21:20, 17 December 2024)
- ML20058L077 + (13:21:21, 17 December 2024)
- ML20058L076 + (13:21:22, 17 December 2024)
- ML20058L074 + (13:21:22, 17 December 2024)
- ML20058L072 + (13:21:24, 17 December 2024)
- 05000425/LER-1990-010-02, :on 900702,observed That Unit 2 Process & Effluent Radiation Monitoring Sys Computer Screen Displayed Active Limiting Condition for Operation Against 2RE-2562C. Caused by Personnel Error.Personnel Counseled + (13:21:25, 17 December 2024)
- TXX-9024, Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel + (13:21:26, 17 December 2024)
- ML20058L067 + (13:21:27, 17 December 2024)
- 05000412/LER-1990-008-01, :on 900702,reactor Trip Occurred,Resulting from Turbine/Generator Trip.Caused by Personnel Error Which Resulted in Protection Relay Actuation.Event Reviewed W/Personnel & Design Mod Being Reviewed + (13:21:33, 17 December 2024)
- 05000344/LER-1990-029, :on 900629,control Switches for Safety Injection Pumps Found in Pull-to-Lock Position.Caused by Personnel Error in Failing to Follow Procedures.Pump Control Switches Placed in Auto Position + (13:21:35, 17 December 2024)
- ML20058L059 + (13:21:39, 17 December 2024)
- 05000029/LER-1990-005, :on 900706,determined That Pressurizer Code Safety Valve Exceeded Tech Spec Lift Tolerance of Nameplate Set Pressure.Caused by Setpoint Drift.Valve Retested & Disassembled + (13:21:41, 17 December 2024)
- ML20058L055 + (13:21:42, 17 December 2024)
- 05000369/LER-1989-010-04, :on 890515,main Feedwater & Auxiliary Feedwater Isolation Valves Determined to Be Potentially Inoperable. Caused by Mfg Deficiency.Emergency Procedures Changed + (13:21:44, 17 December 2024)
- ML20058L053 + (13:21:45, 17 December 2024)
- ML20058L052 + (13:21:46, 17 December 2024)
- ML20058L051 + (13:21:48, 17 December 2024)
- LIC-93-0295, Informs That Util Implemented Necessary Actions Associated W/Listed Open Issues & That Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close + (13:21:54, 17 December 2024)
- ML20058L045 + (13:21:55, 17 December 2024)
- ML20058L042 + (13:21:56, 17 December 2024)
- ML20058L041 + (13:21:57, 17 December 2024)
- JAFP-90-0581, Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed + (13:21:58, 17 December 2024)
- ML20058L040 + (13:21:58, 17 December 2024)
- 05000354/LER-1990-010-02, :on 900628,ESF Actuation/Rwcu Isolation on High Differential Flow Signal Occurred Due to Procedural Inadequacies & Personnel Error.Caused by Open Drain Path Upstream of Discharge Valve.Isolation Reset + (13:22:00, 17 December 2024)
- ML20058L034 + (13:22:01, 17 December 2024)
- ML20058L032 + (13:22:02, 17 December 2024)
- ML20058L031 + (13:22:03, 17 December 2024)
- ML20058L029 + (13:22:03, 17 December 2024)
- ML20058L028 + (13:22:04, 17 December 2024)
- ML20058L024 + (13:22:06, 17 December 2024)
- 05000425/LER-1990-009-02, :on 900630,manual Reactor Trip Initiated Due to Delays in Synchronization to Grid.Caused by Cognitive Personnel Error by Shift Superintendent.Personnel Counseled & Operating Procedure Revised + (13:22:08, 17 December 2024)
- ML20058L022 + (13:22:09, 17 December 2024)
- ML20058L020 + (13:22:10, 17 December 2024)
- 05000333/LER-1990-020, :on 900626,shutdown Cooling Mode of RHR Sys Isolated.Caused by Air in Pressure Switch Sensing Line Due to Deficient Installation Design.Possible Design Mod to Sensing Line to Eliminate Air Trap Considered + (13:22:12, 17 December 2024)
- ML20058L014 + (13:22:14, 17 December 2024)
- ML20058L013 + (13:22:14, 17 December 2024)
- ML20058L011 + (13:22:17, 17 December 2024)
- ML20058L007 + (13:22:18, 17 December 2024)
- ML20058L009 + (13:22:18, 17 December 2024)
- ML20058L006 + (13:22:19, 17 December 2024)
- ML20058L004 + (13:22:20, 17 December 2024)