Text

.

l l

l l

(

l l

i Tewinee vaney Aumoray. P;,st once Box xxn Soudy-Desy Tennenee 373/9-2000 t

l t

i Robert A. Fenech Vee Presdent, Sequoyah Nucieat Rant December 8, 1993 U.S. Nuclear Regulatory Commission l

ATIN: Document Control Desk Washington, D.C. 20555 t

i Gentlemen:

l i

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

l I

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CORE OPERATING LIMITS REPORT (COLR),

REVISION 2 l

Reference:

  • 1VA letter to NRC dated September 17, 1993, "Sequoyah Nuclear Plant (SQN) - Unit 1 Core Operating Limits Report (COLR)"

In accordance with SQN Unit 1 Technical Specification (TS) 6.9.1.14.c, enclosed is the Unit 1 Cycle 7 COLR, Revision 2.

This revision is being provided to implemant the methodology approved by NRC in TS Change 93-07, End of Life Moderator Temperature Coefficient Relaxation (reference TAC Nos. M86824 and M86825).

j Please direct questions concerning this issue to W. C. Ludwig at j

(615) 843-7460.

i Sincerely, Robert A. Fenech t

-I Enclosure cc: See page 2 i

l, 1400~09 1

~

9312160133 931208 F

PDR ADOCK.05000327 t

y l

P yyg Lj

- =.

U.S. Nuclear Regulatory Commission i

Page 2 December 8, 1993 cc (Enclosure):

Mr. D. E. LaBarge, Project Manager l

U.S. Nuclear Regulatory Commission l

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road i

Soddy-Daisy, Tennessee 37379-3624 Regional Administrator 5

U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 8

i r

I l

l

I ENCLOSURE I

SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 7

-~';

CORE OPERATING LIMITS REPORT i

REVISION 2 I

NOVEMBER 12, 1993