Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058P404 + (12:37:28, 17 December 2024)
- IR 05000412/1990011 + (12:37:31, 17 December 2024)
- RS-93-035, Forwards Revised Copies of Overheads Presented at 930430 Meeting Now Designated as non-proprietary + (12:37:32, 17 December 2024)
- ML20058P399 + (12:37:33, 17 December 2024)
- ML20058P400 + (12:37:33, 17 December 2024)
- ML20058P398 + (12:37:34, 17 December 2024)
- ML20058P394 + (12:37:35, 17 December 2024)
- ML20058P393 + (12:37:37, 17 December 2024)
- ML20058P392 + (12:37:38, 17 December 2024)
- ML20058P390 + (12:37:38, 17 December 2024)
- ML20058P389 + (12:37:39, 17 December 2024)
- ML20058P388 + (12:37:42, 17 December 2024)
- ML20058P386 + (12:37:44, 17 December 2024)
- ML20058P383 + (12:37:46, 17 December 2024)
- ML20058P381 + (12:37:48, 17 December 2024)
- ML20058P377 + (12:37:49, 17 December 2024)
- ML20058P371 + (12:37:51, 17 December 2024)
- ML20058P374 + (12:37:51, 17 December 2024)
- ML20058P370 + (12:37:53, 17 December 2024)
- 05000499/LER-1990-012-01, :on 900713,ESF Actuation Occurred Due to Failed Open Feedwater Regulating Valve.Caused by Detached Positioner Feedback Linkage Arm.Training Bulletin Issued to Reemphasize Importance of Tightening Screws + (12:37:55, 17 December 2024)
- B13580, Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement + (12:37:57, 17 December 2024)
- B13607, Requests Relief from ASME Code Section XI to Reflect Mod to Piping Adjacent to Valve 2-SW-97A,in Response to Generic Ltr 90-05 + (12:37:58, 17 December 2024)
- ML20058P359 + (12:37:59, 17 December 2024)
- ML20058P358 + (12:38:01, 17 December 2024)
- ML20058P354 + (12:38:02, 17 December 2024)
- ML20058P352 + (12:38:04, 17 December 2024)
- ML20058P350 + (12:38:05, 17 December 2024)
- ML20058P348 + (12:38:05, 17 December 2024)
- ML20058P344 + (12:38:06, 17 December 2024)
- ML20058P338 + (12:38:08, 17 December 2024)
- ML20058P331 + (12:38:09, 17 December 2024)
- ML20058P335 + (12:38:09, 17 December 2024)
- L-93-059, Forwards Proprietary Response to Violations Noted in Insp Rept 70-1100/93-201 Re Matl Control & Accounting Program. Encl Withheld Per 10CFR2.790 + (12:38:10, 17 December 2024)
- ML20058P327 + (12:38:11, 17 December 2024)
- IR 05000297/1993002 + (12:38:12, 17 December 2024)
- ML20058P326 + (12:38:12, 17 December 2024)
- ST-HL-AE-3532, Special Rept:On 900711,nonvalid Failure of Standby Diesel Generator 13 Occurred.Caused by Loose Connections on Terminal Points on Test Mode Trip Circuitry.Connections Tightened + (12:38:13, 17 December 2024)
- ML20058P322 + (12:38:14, 17 December 2024)
- ML20058P319 + (12:38:15, 17 December 2024)
- ML20058P316 + (12:38:16, 17 December 2024)
- 05000353/LER-1990-011-02, :on 900713,positive Differential Pressure Condition Between Reactor Encl Secondary Containment & Outside Atmosphere Occurred,Resulting in Blowout Panel Actuation.Caused by Severed Air Supply Line + (12:38:18, 17 December 2024)
- ML20058P304 + (12:38:22, 17 December 2024)
- ML20058P303 + (12:38:23, 17 December 2024)
- 05000331/LER-1993-008, :on 930916,noted That Sbdg Output Breaker Failed to Close During Performance of LOOP-LOCA Surveillance Test.Caused by Procedural Inadequacy.Plant Procedures Revised to Address Auxiliary Switch + (12:38:26, 17 December 2024)
- ML20058P297 + (12:38:28, 17 December 2024)
- ML20058P298 + (12:38:28, 17 December 2024)
- ML20058P296 + (12:38:30, 17 December 2024)
- ML20058P295 + (12:38:31, 17 December 2024)
- 05000445/LER-1993-008, :on 930920,ASME Section XI Surveillance Missed Due to Less than Adequate Review of Work Documents.Performed Required Surveillance & Reinforced Expectations W/Cognizant Individuals + (12:38:33, 17 December 2024)
- ML20058P291 + (12:38:34, 17 December 2024)
- 05000353/LER-1990-012-02, :on 900715,reactor Scram Occurred Due to Main Turbine Trip on Low Main Condenser Vacuum Due to Failed Pipe.Caused by Insufficient Pipe Support Resulting in Vibration Induced Metal Fatigue.Pipe Replaced + (12:38:36, 17 December 2024)