Monthly Operating Rept for Jul 1990 for Jm Farley Nuclear Plant,Unit 1
ML20058P389
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/31/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-90-4447, NUDOCS 9008170014
Download: ML20058P389 (5)


Text

.-- -- . - .. . - - . - - - _

..o' l

_

40 inverness Center Parkway  !

j

  • Post Offee Box 1295 Birmingham, Alabama 35201 l Telephone 205 868 55B1 i W, G. Hairston. Ill f t

senior vee President Nuclear Operations . August 14. 1990 AlabamaPbwer l

l' NA-90-4447 ttne soutt:em e*ctre sntom

' i r

. k Docket No. 50-348 l

U. S. Nuclear Regulatory Commission ,

ATTN Document Control Desk  !

Vashington, D. C. 20555 Joseph M. Farley Nuclear Plant Unit l' .

L Monthly Operating Data Report t l

j- Attached is the July 1990 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications, _,

If you have any questions, please advise.

Respectfully submitted, 3

'g G. Hairston,-III l JGStedb2604 f Attachment cci Mr. S. D. Ebneter .

Mr. S. T. Hoffman Mr. G. F. Maxwell I

L T

?

g- ,

m

..p JOSEIH M. FARLEY NUCLEAR ITANT LNIT 1 NARRATIVE SlFNARY OF OPERATIONS

~ July, 1990 ,

There was one significant power reduction arxl one reactor trip during die renth of July.

On July 13, power was raiuoed on Unit:1 to replace the 1A corxiensate panp notor.

Also, it was necessary to' replace a leaking oll sight glass on the IB cordensate panp motor. The_ unit was returned to full power operation on July' 18.

At 2218 on July 20, the reactor was manually tripped followird the automatic.

trip of the 1A steam generator feed punip (SGFp)'. 'Ihe SGFp turbine tripped on overspeed due to the- failure of. the speed sensor converter The reactor was tripyxl manually in anticipation of an automatic reactor ti p.= The unit was- -

synchronized to the grid at 0446 on July 24 tuxt returned _ to full power on July 25.

'Ihere were no other unit shutdowns or significant power reductions during the month of July.

'Ihe following major safety-related am.intenance was' perforined dura.c the month of July:

1. Hiscellaneous corrective and preventive maintenance was perfonned on the diesel generators.

2.

Adjust.seents were unde to the 1D service water panp lubricating water supply regulating valve.

3. The pinion gear' was replaced 'on' the 10 service water panp "A" train Ixwer supply breaker DK-05.
j l

. . l

. OPERATING DATA REPORT  ;

i t

l DOCKET No. 50-348  !

DATE August 3, 1990 i COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes l

1. Unit Name: Joseph H.-Farley - Unit 1 1) Cumulative data since l

-2. R; porting Period: July 1990 12-1-77, date of  ;

3. Licensed Thermal Power (MVt): 2,652 commercial operation.  !
4. N;;eplate Rating (Gross MVe): 860 L5. Design Electrical Rating (Net MVe): 829
6. M:ximum Dependable Capacity (Gross MVe): 866.1
7. M:ximum Dependable Capacity (Net MVe): 823.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,-  ;

Give Reasons: N/A .,

9. Pcver Level To Which Restricted, If Any (Net MVe): N/A 10.R22 sons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative ,
11. Hours In Reporting Period 744 5,087
  • 111,023
12. Number Of Hours Reactor Vas Critical 679.9 5,022.9 85,281.3
13. R: actor Reserve Shutdown Hours 0.0 0.0 3,650.0 1
14. Hours Generator On-Line 665.5 5,008.5 83,718.7
15. Unit Reserve Shutdown Hours. 0.0 0.0 0.0 '
16. Gross Thermal Energy Generated (MVH) 1,690,942 12,787,925 213,941,841
17. Gross Electrical Energy Generated (MVH) 541,596 4,148,778 68,913,928
18. Nat Electrical Energy Generated (MVH) 509,822 3,930,012 ~65,024,978
19. Unit Service Factor 89.4 98.5 75.4 >
20. Unit Availability Factor . .

89.4 98.5 75.4  ?

21. Unit Capacity Factor (Using MDC Net) 83.2 93.3 72.5
22. Unit Capacity Factor (Using DER Net) 82.7 93.2 70.7
23. Unit Forced Outage Rate 10.6 1.5 7.8 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A _

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A i

'26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved ,

INITIAL CRITICALITY 08/06/77' 08/09/77 q INITIAL ELECTRICITY 08/20/77 08/18/77 ,

COMMERCIAL OPERATION 12/01/77 12/01/77 I 1

Fora 2/34 I l

1 i

l

4.

DOCKET NO. 50-348 UNIT 1 DATE August 3, 1990 J COMPLETED BY D. N. Morey  ;

?

TELEPHONE (205)899-5156 i

MONTH July- _

l DAY .AVEP. AGE DAILY POWER-LEVEL DAY' AVERAGE DAILY POVER LEVEL (MVe-Net) (MVe-Net) 1 802 17 695 2 805 18 807 3 812 19 809

-4 810 20 751 5 807 21 0' 6 803 22 0 -

7 803 23 0

  • 8 805 24 -323 9 806 25 795 >

10 806 26 809 j 11 807 27- 815  ;

12 807 28 813' 13 784 29 812: ,

14 492 30 811 15 679 31 808 16 689 '

-INSTRUCTIONS On this format, list the average daily unit power level in MVe-Net for each day in the reporting month. Compute _to the nearest whole megawatt.

l i

O sHLN AND PatfER ItEoUCTIONs DOCIET 180. 50-348 tERI" shpE J. M. FMtIZT - tIrIT 8 *

.+

DhTE Ansgust 3,1990 .*

aP!PIETED BT D. N. PeltET ,

REPoPT POEfTit JUI.T TE12PImEE (205)S99-5156 -

1 I I I I I >=Tn= or i1.rcEnsEE I i -I cmsE & cDamEcrrvE I I I I 1

I canATron 1 2

Isnurrrna 1Eer i sTsm I ammmer i Acrros to i I mE m w I ooie arxn i emmr e I axe

  • I axr5 3

Imo. 'IDarE ITrrE l(nwmS) i PmE=r mEc=Escz i l004 l900713 1 5 l 0 l A l It/A I N/A l SD I P IP ' le=ser to replace 1A condensate pump motor . -l 1 I i 1 I l l l l land is con *=ute r=, toekins =tet stas =- 1 I I I I I I i i l I i

!l005 [900720 l F l 78.5 l A l 2 l90-005-00l sJ l P lManuallytriggedthecoactorfollowingthe 'l

'l 'l l l l l l j l . l automatic trip of time 1A steam generator food pump l Il l ] l l l l 1 l l(sGFP). TheSGFPturbinetrippedonoverspeedduel l- .I I i l l I I I isothefaun.ofta..,eedsensorco-,rter. the l

'l l l l l l l l l lreactorwastrippedmanuallyisanticipationofanl

.I i 1 I 1 1 I I I lautomaticremetortrip. th. IA sore speed sensor i

.I I I I I i 1 I i iconent u we reet.ced. I l~ l i I I i 1 I I I I I I I I I i l I  ! I I I I I l l I I I I I I l- 1 l l 1 I I I I I I I I i l I i i i i i l l l- 1 I I I i i l i I I I I I I I i l i i i

! l, I I I I I I I I i i le i I I I l- 1 I I I I I I I I I I I I I I I l~ l i I I I I I I I I I i i l I I I I I I I I I l i I I .I I I I I i l i I i 1. I I i i F: Forced Roemon: Method: Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 8-Maintonataco or Test 2-Manual Scram. Entry sheets for Licensee c-stefueling 3-Automatic Scram. Event Report (12R) File (IEUUtBG-IHtequlatory Restriction 44)ther (Emplain) 0161)

E-Operator Training & License Examination F-Administrative Exhibit 1 -Same Source G-operational Error (Explain) -

NH)ther (Explain)