October 12e 1993 i
MEMORANDUM FOR:
Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation James G. Partlow,' Associate Director for Projects Office of Nuclear Reactor Regulation FROM:
Roy-P. Zimmerman Rosemount Transmitter Review Group Leader
SUBJECT:
COMPLETION OF REVIEW 0F ROSEMOUNT TRANSMITTER ISSUES The Rosemount Transmitter Review' Group (RTRG) has completed its review and evaluation of the Rosemount transmitter loss-of-fill-oil issue.
Mr. James Sniezek, the NRC Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, established the. RTRG by his.
memorandum of May 21, 1993, in. order:to obtain.an assessment of Rosemount.
transmitter oil-loss concerns, including an evaluation of the adequacy'of the.
actions specified in NRC.Bulletin 90-01, Supplement 1, " Loss of Fill-Oil in Transmitters Manufactured by Rosemount." The RTRG effort included the full-time participation of, four members of the technical staff (including me), and part-time assistance from a member of the AE0D staff. experienced in-statistics, reliability, and probabilistic risk assessment. Al so,' several members of the NRC Office of Investigations (01) and a member of the NRC Office.of the' Inspector General-(IG) gave the RTRG information on this topic.
During our review, we met with representatives from Rosemount, EPRI, and NUMARC to gain an understanding of each organization's perspective, involvement, and actions regarding this issue. The RTRG also. met with representatives of Grand Gulf Nuclear Station and Arkansas Nuclear to obtain.
~
an understanding of their enhanced monitoring programs and operating-experience with Rosemount transmitters. These facilities were selected based on (1) the relatively high number of Rosemount transmitters installed and (2)'
the diversity in NSSS manufacturers represented. We also spoke by-telephone '
with licensee personnel from about a dozen' utilities, gaining additional insights.
Further,.we had extensive dialogues with members of the NRC staff who had been or were involved with the loss-of-fill-oil issue.
The enclosure responds to the May 21, 1993, memorandum and includes the findings, conclusions, and recommendations regarding the specific items -
assigned to the RTRG for review and evaluation.
(original signed by).
Roy Zimmerman Rosemount Transmitter Review Group Leader.
Enclosure:
As stated.
Qj.: ;) (dya &f
- ZEJ g ya (dD )^
For distribution see next page g 7 g gy uj g
(j](9.a,u5T gggIM CBHS COPY g
9310250010 931012 PDR ORC NRRB 0000%U
.l pu).
t PDR
I i
Memorandum for T.E.Murley DISTRIBUTION:
1 JSniezek, EDO SNewberry,NRR-w/o
_Jtiauck, NRR w/o..
- PDRh(w/o' proprietary info.),
JWermiel, NRR BBoger, NRR - w/o
. CENTRAL 1. FILES /PDR:e:
RTRG Members HScott, OlG - w/o WRussell, NRR - w/o CBerlinger, NRR - w/o BHayes, 01 - w/o Ploeser, NRR - w/o LNorrholm, NRR-w/o RPerch,NRR-w/o DSpaulding, NRR-w/o JRamsey, NRR-w/o Tle, NRR-w/o pl-l(('t Rfb AE00:TPAB RGN-I/EB OEDOM VIB:DRIL:NRR D:DRIL:NRR DRasmuson:ld fdDGreca VMcCree A ampbell Rzimmerman LC
/ /93 I 9/av93 y /20 /93 [
9/20/93 9 /aa/93 M
W-P P
r
-~sitr/n i
i i
i 2 ' d "19101 -
2'*d
'SP2LO CG/10/01-
"M1 *.786 AIMIDMN WOMd
.,j J
)
i Memorandum for T.E.Murley dated -
DISTRIBUTION w/oroorietary information:
-JSniezek, E00 l
JLee, NRR JWermiel, NRR RTRG Members DISTRIBUl NN w/o oroprietar_y information:
i WRussell, NRR SNewberry, NRR RPerch, NRR BHayes, 01 ERossi, NRR JMauck, NRR LNorrholm, NRR BBoger, NRR PDR DSpaulding, NRR HScott, OIG JRamsey, NRR CBerlinger, NRR Tle NRR PLoeser, NRR AEOD:TPAB RGN-I/EB OEDO VIB:DRIL:NRR D:DRIL:NRR DRasmuson:ld/cm NDGreca VNcCree LCampbell RZimmerman
/ /93
/ /93
/ /93
/ /93
/ /93 A review of the RT M draft report,did rot reveal any new concerns that would require additional investigative efforts by OI:RIV l
i e
0 i
5
1 i
SUBJECT:
ROSEMOUNT TRANSMITTER REVIEW GROUP REPORT I
EVALUATION PERIOD:
May 21 through September 1993 j
i GROUP LEADER:
Roy P.
Zimmerman, Deputy Director i
Division of Reactor Inspection and Licensee Performance Office of Nuclear Reactor Regulation GROUP MEMBERS:
Victor M. McCree, Regional Coordinator Office of the Executive Director for Operations
)
Aniello L.
Della Greca, Sr. Reactor Engineer l
Division of Reactor Safety, Region I Larry L.
Campbell, Reactor Engineer Vendor Inspection Branch Division of Reactor Inspection and Licensee Performance office of Nuclea Reactor Regulation C
s Dale Rasmu son,.Sr. Plant Systems Engineer (part-time)
Trends and atterns Analysis Branch Division of Safety Programs Office for Analysis and Evaluation of Operational Data j
(s) Roy Zimmerman Oct. 12, 1993 SUBMITTED BY:
Roy P.
Zimmerman Date
/
VIB:DRIL:NRR D:DRIL:NRR DRasmuson:1d NDGreca VMcCree LCampbell RZimmerman
, ;(
7 //$' / 93
/
/93
/
/93
/
/93
/
/93 q
AttkiS C f0h%[e siguJ-(Y dat u,
-s cco-e
I
?
f * /p %\\
g y[j,!
l UNITED STATES NUCLEAR REGULATORY COMMISSION was.nctou. o c. rosss ae g.""**
October 12, 1993 MEMORANDUM FOR:
Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation THRU:
James G. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation FROM:
Roy P. Zimerman Rosemount Transmitter Review Group Leader
SUBJECT:
COMPLETION OF REVIEW OF ROSEMOUNT TRANSMITTER ISSUES The Rosemount Transmitter Review Group (RTRG) has completed its review and evaluation of the Rosemount transmitter loss-of-fill-oil issue.
Mr. James Sniezek, the NRC Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, established the RTRG by his memorandum of May 21, 1993, in order to obtain an assessment of Rosemount transmitter oil-loss concerns, including an evaluation of the adequacy of the actions specified in NRC Bulletin 90-01, Supplement 1, ' Loss of Fill-Oil in Transmitters Manufactured by Rosemount." The RTRG effort included the full-time participation of four members of the technical staff (including se), dnd part-time assistance from a member of the AE00 staff experienced in statistics, reliability, and probabilistic risk assessment. Also, several members of the NRC Office of Investigations (01) and a member of the NRC Office of the Inspector General (IG) provided the RTRG with access to information in their respective files on this topic.
During our review, we met with representatives from Rosemount, EPRI, and NUMARC to gain an understanding of each organization's perspective, involvement, and actions regarding this issue. The RTRG also met with representatives of the Grand Gulf Nuclear Station and Arkansas Nuclear One to obtain an understanding of their enhanced monitoring programs and operating experience with Rosemount transmitters. These facilities were selected based on (1) the relatively high number of Rosemount transmitters installed and (2) the diversity in NSSS manufacturers represented. We also spoke by telephone with licensee personnel from about a dozen utilities, gaining additional Further, we had extensive dialogues with members of the NRC staff insights.
who had been or are involved with the loss-of-fill-oil issue.
j The enclosure responds to the May 21, 1993, memorandum and includes the findings, conclusions, and recomendations regarding the specific items assigned to the RTRG for review and evaluation.
Y =%
4 rman nt Transmitter Review Group Leader se l
Enclosure:
As stated i
--