Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059A887 + (12:05:12, 17 December 2024)
- ML20059A883 + (12:05:13, 17 December 2024)
- ML20059A885 + (12:05:13, 17 December 2024)
- ML20059A882 + (12:05:14, 17 December 2024)
- ML20059A880 + (12:05:15, 17 December 2024)
- ML20059A881 + (12:05:15, 17 December 2024)
- ML20059A879 + (12:05:16, 17 December 2024)
- ML20059A875 + (12:05:20, 17 December 2024)
- ML20059A871 + (12:05:26, 17 December 2024)
- ML20059A869 + (12:05:27, 17 December 2024)
- ML20059A867 + (12:05:28, 17 December 2024)
- ML20059A866 + (12:05:30, 17 December 2024)
- ML20059A864 + (12:05:31, 17 December 2024)
- ML20059A863 + (12:05:32, 17 December 2024)
- ML20059A860 + (12:05:32, 17 December 2024)
- ML20059A858 + (12:05:34, 17 December 2024)
- ML20059A857 + (12:05:35, 17 December 2024)
- ML20059A856 + (12:05:36, 17 December 2024)
- ML20059A855 + (12:05:40, 17 December 2024)
- ML20059A853 + (12:05:41, 17 December 2024)
- 05000443/LER-1990-019, :on 900721,discovered That Time Limitation of Tech Spec 3.8.4.1 Exceeded by Nearly 7 H.Caused by Personnel Failure to Follow Procedures.Root Cause Analysis & Enhancement Sys Evaluation Initiated + (12:05:43, 17 December 2024)
- ML20059A850 + (12:05:44, 17 December 2024)
- ML20059A848 + (12:05:45, 17 December 2024)
- ML20059A844 + (12:05:49, 17 December 2024)
- RBG-39809, Forwards Rev 1 to River Bend Nuclear Station Near-Term Performance Improvement Plan, Per Operational Safety Team Insp Request + (12:05:50, 17 December 2024)
- ML20059A842 + (12:05:51, 17 December 2024)
- ML20059A841 + (12:05:52, 17 December 2024)
- ML20059A839 + (12:05:52, 17 December 2024)
- BSEP-93-0171, Responds to NRC Re Violation & Deviation Noted in Insp Repts 50-324/93-39 & 50-325/93-39 on 930923-27.Subj Violation Denied.Corrective Actions for Deviation Includes Approval of Procedure O-PLP-26 + (12:05:53, 17 December 2024)
- ML20059A837 + (12:05:57, 17 December 2024)
- RBG-39214, Withdraws 930917 Request for one-time Exemption from Scheduling Requirements of 10CFR55.59(a)(1) to Allow One Month Extension of 24 Month Duration Requirement for Operator Requalification Program + (12:05:58, 17 December 2024)
- ML20059A836 + (12:05:58, 17 December 2024)
- ML20059A834 + (12:05:59, 17 December 2024)
- IR 05000285/1990033 + (12:06:00, 17 December 2024)
- ML20059A832 + (12:06:02, 17 December 2024)
- NG-93-5334, Forwards Response to RAI Re Proposed TS Change Request on LPCI Operability + (12:06:03, 17 December 2024)
- ML20059A830 + (12:06:04, 17 December 2024)
- ML20059A827 + (12:06:05, 17 December 2024)
- ML20059A825 + (12:06:06, 17 December 2024)
- NG-93-5260, Informs of Corporate Organizational Changes + (12:06:06, 17 December 2024)
- ML20059A821 + (12:06:07, 17 December 2024)
- 05000325/LER-1993-012, :on 930928,Group 1 Isolation Signal Generated Due to Resetting Main Turbine for Testing.Caused by Defective Procedure.Operating Procedure 50 Will Be Revised + (12:06:10, 17 December 2024)
- ML20059A817 + (12:06:11, 17 December 2024)
- ML20059A816 + (12:06:12, 17 December 2024)
- 05000361/LER-1993-007, :on 930921,determined That non-conservative Error Made in Input to Original Large Break LOCA (LBLOCA) Analysis Which Affected Calculated Peak Fuel Cladding Temp. Existing LBLOCA Analysis Reevaluated + (12:06:14, 17 December 2024)
- ML20059A811 + (12:06:19, 17 December 2024)
- ML20059A809 + (12:06:19, 17 December 2024)
- ML20059A807 + (12:06:21, 17 December 2024)
- ML20059A805 + (12:06:23, 17 December 2024)
- ML20059A804 + (12:06:23, 17 December 2024)
- ML20059A802 + (12:06:25, 17 December 2024)
- ML20059A801 + (12:06:25, 17 December 2024)