Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000416/1990022 + (04:28:35, 17 December 2024)
- IR 05000346/2019006 + (04:28:36, 17 December 2024)
- ML20062F753 + (04:28:36, 17 December 2024)
- ML20062F750 + (04:28:37, 17 December 2024)
- ML20062F752 + (04:28:37, 17 December 2024)
- ML20062F749 + (04:28:38, 17 December 2024)
- ML20062F747 + (04:28:39, 17 December 2024)
- ML20062F744 + (04:28:40, 17 December 2024)
- ML20062F743 + (04:28:40, 17 December 2024)
- ML20062F741 + (04:28:41, 17 December 2024)
- ML20062F742 + (04:28:41, 17 December 2024)
- ML20062F740 + (04:28:42, 17 December 2024)
- ML20062F738 + (04:28:44, 17 December 2024)
- ML20062F739 + (04:28:44, 17 December 2024)
- ML20062F735 + (04:28:45, 17 December 2024)
- ML20062F736 + (04:28:45, 17 December 2024)
- ML20062F733 + (04:28:46, 17 December 2024)
- 05000327/LER-1982-093-03, /03L-0:on 820706,ice Condenser Intermediate Deck Doors 1 & 5 in Bay 9 & Door 1 in Bay 10 Failed Lift Test SI-108 After Being Found Iced Over.Caused by Failed Heat Tape Causing Line to Rupture.Drain Line Repaired + (04:28:48, 17 December 2024)
- 05000302/LER-1978-061-03, /03L-0:on 781117,emergency Diesel Generator EDG-3B Failed to Fast Start on First Two Consecutive Attempts.Cause of Event Unknown Since Diesel Was Started Twice Following Anomaly W/O Aid of Maint + (04:28:50, 17 December 2024)
- ML20062F729 + (04:28:51, 17 December 2024)
- ML20062F726 + (04:28:51, 17 December 2024)
- 05000302/LER-1978-061, Forwards LER 78-061/03L-0 + (04:28:52, 17 December 2024)
- ML20062F724 + (04:28:52, 17 December 2024)
- ML20062F722 + (04:28:53, 17 December 2024)
- ML20062F723 + (04:28:53, 17 December 2024)
- 05000263/LER-1978-021, Forwards LER 78-021/03L-0 + (04:28:55, 17 December 2024)
- 05000302/LER-1978-059-03, /03L-0:on 781113,control Complex Atmospheric Radiation Monitor RMA-5 Went to High Flow Alarm,Preventing Actuation of Interlocks Which Route Control Room Air Through Emergency Ventilation Sys.Caused by Vacuum Pump Seizing + (04:29:00, 17 December 2024)
- ML20062F715 + (04:29:01, 17 December 2024)
- ML20062F713 + (04:29:01, 17 December 2024)
- 05000302/LER-1978-059, Forwards LER 78-059/03L-0 + (04:29:02, 17 December 2024)
- ML20062F710 + (04:29:02, 17 December 2024)
- ML20062F707 + (04:29:05, 17 December 2024)
- ML20062F705 + (04:29:09, 17 December 2024)
- PNO-III-90-077, on 901121,moisture Density Gauge Stolen + (04:29:09, 17 December 2024)
- ML20062F702 + (04:29:11, 17 December 2024)
- ML20062F701 + (04:29:12, 17 December 2024)
- ML20062F700 + (04:29:12, 17 December 2024)
- ML20062F696 + (04:29:14, 17 December 2024)
- ML20062F695 + (04:29:15, 17 December 2024)
- ML20062F694 + (04:29:15, 17 December 2024)
- ML20062F690 + (04:29:16, 17 December 2024)
- ML20062F691 + (04:29:16, 17 December 2024)
- 05000366/LER-1982-067-03, /03L-0:on 820705,A & B Svc Water Supply Valves to RHR & Core Spray Pump Room Cooler Failed to Pass Core Spray Operability Procedure Requirements.Caused by Lack of Lubrication.Valves Lubricated & Reassembled + (04:29:18, 17 December 2024)
- ML20062F686 + (04:29:19, 17 December 2024)
- 05000327/LER-1982-093, Forwards LER 82-093/03L-0 + (04:29:20, 17 December 2024)
- ML20062F683 + (04:29:21, 17 December 2024)
- 05000263/LER-1978-022, Forwards LER 78-022/03L-0 + (04:29:22, 17 December 2024)
- 05000324/LER-1978-074-03, /03L-0 on 781112:reactor Steam Dome High Pressure Switch B32-PS-N018B Did Not Reset & Would Not Allow RHR Valve E11-F008 to Open for Shutdown Cooling at Reactor Pressure of 102psig.Caused by Sticking micro-switch + (04:29:26, 17 December 2024)
- ML20062F676 + (04:29:27, 17 December 2024)
- 05000366/LER-1982-067, Forwards LER 82-067/03L-0 + (04:29:29, 17 December 2024)
- IR 05000295/1990026 + (04:29:29, 17 December 2024)