Monthly Operating Rept for June 1982
ML20062F735
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/01/1982
From: Hanaford T
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20062F727 List:
References
NUDOCS 8208120125
Download: ML20062F735 (5)


Text

.

s. e.

AC40 - R A g

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 DATE 7/1/82 COMPLETED BY T. Hana ford TELEPHONE E49T7700 Ext. 702 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatino Station, Unit 2
2. Reporting Period: 1 June 1982 through 30 June 1982
3. Licensed Thermal Power (Mht): 169.5 MWt
4. Nameplate Rating (Gross MWe). 1127 MWe
5. Design Electrical Rating (Net MWe): 1087 MWe
6. Masimum Dependable Capacity (Gross MWei: 1127 MWe
7. Masimum Dependable Capacity (Net MWe): 1087 MWe
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since last Report.Give Reasons:

N/A Net MWe): N/A

9. Power LevelTo which Restricted.If
10. Reasons For Restrictions. If Any: Un Anj (it is in initial startup phase of testing This Month Yr..to Date Cumulatise 720 3239 3239

!!. Hours in Reporting Period

12. Number Of Hours Reactor has Critical 0 0 0
13. Reactor Resene Shutdown Hour, 0 0 0 0 0 0
14. Hours Generator On.Line 0 0 0
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 0 0 l

17 Gross Electrical Energy Generated (MWH) 0 0 0 lb. Net Electrical Energy Generated (MWH) 0 0 0

19. Unit Senice Factor O O O 20 Unit Asailabilits Factor 0 0 0
21. Unit Capacits Factor (Using 'IDC Net, 0 0 0 22 Unit Capacity Factor (Usin<. DER Net) 0 0 0 23 Unit Forced Outage Rate n n n
24. Shutdowns Scheduled Os.r Nest 6 Months (T3 pe. Date.and Duration of Eachi:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup. N/A
26. Umts in Test Status (Prior io Commercial Operationi. Forecast Achiesed l

INill \ L CRITIC A LITY 7/17/82 INITitL ELECTRICITY Week of 8/9/82 COMMERCI AL OPER ATION 8/15/82 8208120125 820715 PDR ADOCK 05000361 R

ap . . o l i l > > . . . P

.D,,R.

a - -

~ .-- _

'e*

AVER AGL D ALLY UNIT POWER LEVEL DOCKET NO. 50-361 UNn SONGS-2 DATE 7/I/02 COMPLETED BY T. Hanaford TELEPHONE 714-492-7700 Ext. 702 MONTH June DAY AVER AGE D AILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL iM he-Neu (MWe. Net) i 0 0

i7 0 0 2 is 3 0 i, 0 4 0 20 0 5 0  :: 0 6 0 0 22

, 7 0 0 23 8 0 24 0 9 0 0 25 10 0 0 26 0 0 is ,,

0 0 12 73 l 0 0 I3 29

~

0 14 0

39 0

15 ti N/A I s t, 0 l

l i

l l

i i

  • sso(e) ni ns ef,,
  • e- w e =

~ - - , - - --

< n -,_ . ,, - - - _ , , - _ , - , --,, ,

UNil SHUTl) OWNS AND POWER REDUCTIONS DOCKET NO. 50-361 UNIT N AME snNn9_7

  • DATE 7/1/82 COMPLETED BY T. Hanaford r REPORT MONTH June TELEPHONE fl 4-4 92- 7700 LXt. /UZ "i-

= *e ?a: S p ~j

~:j j _{  ? l.icensee gto g4 Cause & Correctne

"- Dd8 e -- ,-

4 2 - cc I vent

. aT g.? Atinin so 3E E Repine : SC EL 55i!

- v Pscsent Recurrente 6

N/A N/A N//. N/A N/A N/A N/A N/A N/A N/A g,

e i l'e n s ed H e.n. in Method ; l' Inbu f - Instincinius 5 b in J nicJ A l .inspinent I ailure (1 splam) 1. Manual los Psep.u.Hinn of Data lt Maintenante os lest 2 Manual Scram. 1.nir5 Shects lin I keinee

( Helurling 4. Automatie Si r.un. I seni Rep.niil i RIlife iNL RI G.

D Hernia"i Re:,isiction 4 Other ilNplanil Ol t.11 I Opciaio lea'unir & Iis ense 1.unnnation I-Adunnntiain.c 5

(. t #pcialional I eson ll spl.nni i sinbitll Linc Sonce i ll (Illir e I splanll i

r. olil i,. . . ,,,.

o

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-361 i .

UNIT San Onofre, Unit 2 DATE 7/1/82 l COMPLETED BY T. Hanaford TELEPHONE 714-492-7700 Ext. 702 Date/ Time Event June 1, 0001 Unit 2 is in Mode 5. The RCS is drained to mid-loop for RCP seal repairs.

June 2, 0800 RCP's 2P-002 and 2P-003 declared operable.

2 June 4, 1707 Entered Mode 4.

June 6, 1355 Entered Mode 3.

i June 7, 0120 Started RCP 2P-001 and observed indication of upper j seal failure. Stopped 2P-001.

i June 9, 0240 Auxiliary Feedwater Pump 2P-140 declared inoperable.

June 11, 1245 Auxiliary Feedwater Pump 2P-141 declared inoperable.

Initiated cooldown in accordance with Technical Specification 3/4-7-4.

June 11,1445 Auxiliary Feedwater Pump 2P-140 declared operable j after satisfactory I.S.I. test of 2HV-4716 and successful starts from the Control Room. Terminated cooldown.

June 11,1500 Commenced heat up from 485 F to 545 F.

J June 17,1845 Initiated plant cooldown to Mode 5 due to excessive controlled bleedoff flow (greater than 3.5 gpm) and high controlled bleedoff temperature on 2P-001.

June 18, 0040 Entered Mode 4.

j June 18, 1340 Entered Mode 5 to begin work on RCP seals.

i June 30, 2359 Unit 2 is in Mode 5. RCP seal repairs are in progress.

i l

....t.i , . .. . .,,.

r

. . /. REFUELING INFORMATION o DOCKET NO. 50-361 UNIT SONGS-2 DATE 7/1/82 COMPLETED BY T. Hanaford TELEPHONE 714-492-7700 Ext. 702

1. Scheduled date for next refueling shutdown.

Not yet determined

2. Scheduled date for restart following refueling.

Not yet determined

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined

5. Important licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

l Not yet determined

6. The number of fuel assemblies.

c) In the core 21 7 b) In the spent fuel storage pool. 0 l

7. Licensed spent fuel storage capacity. 800 i

Intended change in spent fuel storage capacity. N/A

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Not yet determined