Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062G050 + (04:24:01, 17 December 2024)
- ML20062G048 + (04:24:02, 17 December 2024)
- ML20062G044 + (04:24:03, 17 December 2024)
- ML20062G046 + (04:24:03, 17 December 2024)
- ML20062G043 + (04:24:04, 17 December 2024)
- ML20062G041 + (04:24:05, 17 December 2024)
- ML20062G039 + (04:24:06, 17 December 2024)
- ML20062G040 + (04:24:06, 17 December 2024)
- ML20062G035 + (04:24:09, 17 December 2024)
- ML20062G032 + (04:24:10, 17 December 2024)
- ML20062G031 + (04:24:11, 17 December 2024)
- ML20062G028 + (04:24:12, 17 December 2024)
- PM-78-411, Forwards Reactor Containment Bldg Integrated Leak Rate Test for Subj Facil + (04:24:12, 17 December 2024)
- ML20062G023 + (04:24:13, 17 December 2024)
- ML20062G018 + (04:24:14, 17 December 2024)
- ML20062G021 + (04:24:14, 17 December 2024)
- ML20062G016 + (04:24:15, 17 December 2024)
- RBG-34032, Requests Temporary Relief from License Condition 2.C(14) to Procure & Install Neutron Monitoring Sys,Per Reg Guide 1.97 + (04:24:15, 17 December 2024)
- ML20062G013 + (04:24:16, 17 December 2024)
- ST-HL-AE-3628, Requests Waiver from Tech Spec 4.4.6.2.2d,extending 24 H Time Requirement to 72 H for Pressure Isolation Valve Leak Testing + (04:24:17, 17 December 2024)
- ML20062G011 + (04:24:17, 17 December 2024)
- ML20062G007 + (04:24:18, 17 December 2024)
- ML20062G006 + (04:24:18, 17 December 2024)
- ML20062G005 + (04:24:19, 17 December 2024)
- ML20062G004 + (04:24:21, 17 December 2024)
- AECM-82-461, Application to Amend License NPF-13,delaying Control Room Leak Tightness Testing Until Unit Exceeds 5% Power. Technical Justification Encl + (04:24:22, 17 December 2024)
- ML20062G000 + (04:24:23, 17 December 2024)
- ML20062G001 + (04:24:23, 17 December 2024)
- ML20062F999 + (04:24:24, 17 December 2024)
- L-90-392, Responds to Violations Noted in Insp Repts 50-335/90-23 & 50-389/90-23.Corrective Actions:Instructions Reviewed W/Maint Personnel to Ensure Compliance & Work Control Procedure Revised + (04:24:25, 17 December 2024)
- ML20062F998 + (04:24:25, 17 December 2024)
- RBG-34031, Requests Termination of Senior Operator License SOP-43489 for Js Carlson + (04:24:26, 17 December 2024)
- ML20062F994 + (04:24:28, 17 December 2024)
- ML20062F989 + (04:24:29, 17 December 2024)
- ML20062F991 + (04:24:29, 17 December 2024)
- ML20062F988 + (04:24:30, 17 December 2024)
- ML20062F986 + (04:24:31, 17 December 2024)
- ML20062F983 + (04:24:32, 17 December 2024)
- ML20062F985 + (04:24:32, 17 December 2024)
- 05000302/LER-1978-062-03, /03L-0:on 781121,during Control Rod Exercise Procedure SP-333,absolute Position Indication for Rod 4 Group 3 Not Observed as Rod Was Moved.Caused by Sticking Reed Switch + (04:24:34, 17 December 2024)
- ML20062F979 + (04:24:35, 17 December 2024)
- ML20062F978 + (04:24:36, 17 December 2024)
- 05000302/LER-1978-062, Forwards LER 78-062/03L-0 + (04:24:37, 17 December 2024)
- ML20062F976 + (04:24:38, 17 December 2024)
- ML20062F975 + (04:24:39, 17 December 2024)
- 05000302/LER-1978-063-03, /03L-0:on 781123,start-up Transformer Disabled, Causing Loss of Power in Cable Tunnel Sump Pumps.Operability Restored Shortly.Engineering Evaluation of Power Sys Initiated + (04:24:40, 17 December 2024)
- ML20062F970 + (04:24:43, 17 December 2024)
- 05000302/LER-1978-063, Forwards LER 78-063/03L-0 + (04:24:44, 17 December 2024)
- ML20062F968 + (04:24:44, 17 December 2024)
- ML20062F966 + (04:24:45, 17 December 2024)
- ML20062F967 + (04:24:45, 17 December 2024)