ML20062F986
| ML20062F986 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 07/22/1982 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20062F993 | List: |
| References | |
| TASK-03-06, TASK-3-6, TASK-RR LAC-8418, NUDOCS 8208120218 | |
| Download: ML20062F986 (4) | |
Text
,
, JS "i D DA/RYLAND h
[k COOPERAT/VE
- PO BOX 817
- 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN S4601 (608) 788 4 000 July 22, 1982 In reply, please refer to LAC-8418 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation ATTN:
Mr. Dennis M.
Crutchfiald, Chief Operating Reactors Branch #5 Division of Licensing U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 SEP TOPIC III SEISMIC DESIGN CONSIDERATIONS - LA CROSSE
References:
(1)
NRC Letter, Eisenhut to Linder, dated August 4, 1980.
(2)
NRC Letter, Crutchfield to Linder, dated April 24, 1981.
Gentlemen:
References (1) and (2) requested DPC to perform a seismic re-i evaluation of LACBWR.
As part of the evaluation process, Technical References 001, 002, 003, 004, 012, 013 and 014, as listed on the attached index, are enclosed for your review.
If there are any questions concerning these reports, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE 4WYU f
(~
g,,
I l
Frank Linder, General Manager l
PL:RMB:af I
cc:
J.
G.
Keppler, Reg. Adm., NRC-DRO III NRC Resident Inspector DN I
h G208120210 B20722 1
PDR ADOCK 05000409 P
PDH l
P i
1 4
{
f 1
4 4
SEIS4IC REPORTS
.INDE_X i
i li l
.I l
l 1
i l
l l
l i
l, I
i i
l l.
i h1'2. 3 1
TECil_._ _REF. NO._
DOC _UMErff NO._
'IOPIC __
IRTE REVISIW 001 81A0044 NES SIUIDOWN CONDENSER 11/13/81 1
002 81A0045 IES SIUTDGsN C04 DENSER 01/19/82 0
PIATFOIM 003 81A0046 tES IACBia SPACK 04/16/82 0
004 81A0047 IES l-B DIESEL BUILDItG 01/21/82 0
005 81A0087 NES FEEDWATER 06/18/75 PIPING SYSTEM 006 81A0088 IES MAIN SPEAM 08/01/75 PIPDC SYSTEM 007 81A0089 NES RECIRCUIATIW 11/17/75 PIPDC SYSrfli 008 81A0090 IES IIIGli PRESSJRE 07/09/76 CORE SPRAY SJCTIQJ LD4E PIPHO SYSTEM 009 81A0091 NES IIIGli PRESSJRE 05/10/77 1
CORE SPRAY DIS]IAICE LD4E PIPDU SYSTEM l
010 81A0092 NES IACBWR NJD GENOT 3 06/24/76 l
SPACKS l
011 81A0095 NES SPF1TT FUEL 09/26/78 1
POOL STRUCIUIE t
012 81A0048 NES IACBWR 'IURBEE 07/28/82 0
BUILDIfC 013 81A0049 NES IACBWR COfrAINMENT 07/27/82 0
BUILDHC WP-2.3 1
TECli._ JEF._NO.
DOCUMEtfr _NO_._
'IOP_I_C IETE REVISIQJ 014 80A0051 PES LACBWR 14" SIUrDOWN 07/26/82 0
C04 DENSER VENT PIPING SYSTEM PREVIOUSLY SUBMITTED 'IO NRC i
i I
l l
i l
3 WP-2.3