v A

, o-e o,

OPERATING DATA REPORT DOCKET NO. 50-286 DATE July 1, 1982 COhiPLETED BY L.

Autorino TELEPIIONE (0141 ~110-8200 OPERATING STATUS

1. Unit Name:

Indian Point No. 3 Nuclear Powar Pl et June 82

2. Reporting Period:
3. Licensed Thermal Power 15tWr):

3025 1013

4. Nameplate Rating (Gross 51We):

965

5. Design Electrical Rating (Net StWe):

7 926

6. Staximum Dependable Capacity (Gross StWe):

891

7. Staximum Dependable Capacity (Net StWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

?

9. Power Level To Which Restricted,if Any (Net StWe):
10. Reasons For Restrictions. If Any:

This Month YrAo.Date Cumulative 720 4,343.0 51,144.0

11. Hours in Reporting Period 0

1,984.6 34,090.8

12. Number Of Hours Reactor Was Critical 0

0 0

43. Reactor Reserve Shutdown Hours 0

1,969.4 32,913.1

14. Hours Generator On Line 0

0 0

-15. Unit Reserve Shutdown Hours 0

5,060,030 86,143,401

16. Gross Thermal Energy Generated (51WH) 0 1,502,170 26,298,300
17. Gross Electrical Energy Genemted (SIWH) 0 1,436,036 25,183,443
18. Net Electrical Energy Generated (StWH) 0 45.1

.64.4

19. Unit Service Factor 0

45.3 64.4

20. Unit Availability Factor 0

37.1 ss.7

21. Unit Capacity Factor (Using blDC Net 1 0

34.3 51.0

22. Unit Capacity Factor (Using DER Net) o 2.3 14.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 5tonths (Type. Date, and Duration of Each):

Hefuelino outaqe in progress Unon comnletion of scheduled Maintenance

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achieved i

INITIAL CRITICALITY INITIAL ELECTRICITY CO313tERCIAL OPER ATION 8208120217 820806 PDR ADOCK 05000286 N

14/77)

PDR

AVERAGE DAILY UNIT POWER LEVEL l

l DOCKET NO. _50-286 Indian Point UNIT Mo 3 l

l DATE July 1, 1982 j

COMPLETED BY L.

Auterino TELEPHONE (914) 739-8200 MONTH J'2ne 82 1

DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

'/

(MWe-Net)

(MWe-Net) 1 0

0' 17 2

0 I3 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

0 22 7

o 23 0

8 0

24 0

9 0

0 25 10 n

26 0

l I1 0

27 0

0 0

I2 28 l

13 0

0 29 l

l 14 0

0 30 0

15 3y 0

I6 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77)

1 UNITSIfUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNITNAME Indian Point No. 3 DATE Julv 1.

1982 REPORT MONTII June 82 COMPLETED BY L.

Auterino TELEPilONE (014) 710-8200 2

e e.

=.a :

c

$*'o Cause & Corrective

'S E

'EU Na

  • Dat#

2:I a

_E E cc Event u?

c. ?

'\\ction to

~ $5 5

j d5 g Report #

d' 0 0

Prevent Recurrence 1

6 04 82/03/25 S

720 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

1 1

i

}

i I

2 3

4 F: Forced Reason:

Method:

Exhibit - Inst ructions i

S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance or Test 2 Manual Scrana.

Entr> Sheets for Licensee C Refucting 3-Automatic Scram.

Event Report tLER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & License Examination F-Administrative 5

G. Operational Error (Explain)

Exhibit. - Same Source W/77)

It-Other (Explain)

?

I

MONTilLY I & C CATEGORY I PJEPORT June 1982 Month m

W.R.

No.

DATE EQUIPMENT MALFUrJCTION CORRECTIVE ACTION IC-1-1028-3C 5-20-82 Seismic Peak Shock Broken Switch Contact Fapaired Switch Contact Recorder PSR 1200-H/V-12A i

IC-1-1450-1 8-26-81 Reactor Trip Bypass Misalignment of Pins Installed Support brace Breakers BYA & BYB for Aux. Switches in breaker compartments IC-1-1676-2 l

5-15-82 Diesel Generator Fuel Switch defective Replaced switch Oil Tank d31 Outlet A P DPC-lll95 IC-1-1677-2 5-15-82 Diesel Generator Fuel Switch defective Replaced switch Oil Tank #33 Outlet AP DPC-ll21S i

l..--.._____._.___ _ _ _ _.

f10tlTIII,Y ttAltiTE!IAliCE 1(EI'OltT Jime 1992

  1. 1onth WrR. #

DATE EQUIPltEtiT

!!AIEUtiCTIOri CORRECTIVE ACTIOli I-2636 6-01-82 PCV-ll88 City Water to Aux.

Valve leaks through Lapped in valve seat Feed pump I-2927 6-23-82 PCV-ll8d City Water to Aux.

Valve leaks through Lapped in valve seat Feed pump I-2928 6-23-82 PCV-1189 City Water to Aux.

Valve leaks through Lapped in valve seat Feed pump I-2929 6-23-82 PCV-ll87 City Water to Aux.

Valve leaks through Lapped in valve seat Feed pinap e

G O

e OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

Preparations for steam generator repairs, replacement of containment recirculation fan cooling coils, and replacement of 31 and 33 main turbine spindles continue.

v

(