OPERATING DATA REPORT DOCKET NO. 50-286 DATE July 1, 1982 COhiPLETED BY L.
Autorino TELEPIIONE (0141 ~110-8200 OPERATING STATUS
- 1. Unit Name:
Indian Point No. 3 Nuclear Powar Pl et June 82
- 2. Reporting Period:
- 3. Licensed Thermal Power 15tWr):
3025 1013
- 4. Nameplate Rating (Gross 51We):
965
- 5. Design Electrical Rating (Net StWe):
7 926
- 6. Staximum Dependable Capacity (Gross StWe):
891
- 7. Staximum Dependable Capacity (Net StWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
?
- 9. Power Level To Which Restricted,if Any (Net StWe):
- 10. Reasons For Restrictions. If Any:
This Month YrAo.Date Cumulative 720 4,343.0 51,144.0
- 11. Hours in Reporting Period 0
1,984.6 34,090.8
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 43. Reactor Reserve Shutdown Hours 0
1,969.4 32,913.1
- 14. Hours Generator On Line 0
0 0
-15. Unit Reserve Shutdown Hours 0
5,060,030 86,143,401
- 16. Gross Thermal Energy Generated (51WH) 0 1,502,170 26,298,300
- 17. Gross Electrical Energy Genemted (SIWH) 0 1,436,036 25,183,443
- 18. Net Electrical Energy Generated (StWH) 0 45.1
.64.4
- 19. Unit Service Factor 0
45.3 64.4
- 20. Unit Availability Factor 0
37.1 ss.7
- 21. Unit Capacity Factor (Using blDC Net 1 0
34.3 51.0
- 22. Unit Capacity Factor (Using DER Net) o 2.3 14.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 5tonths (Type. Date, and Duration of Each):
Hefuelino outaqe in progress Unon comnletion of scheduled Maintenance
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achieved i
INITIAL CRITICALITY INITIAL ELECTRICITY CO313tERCIAL OPER ATION 8208120217 820806 PDR ADOCK 05000286 N
14/77)
AVERAGE DAILY UNIT POWER LEVEL l
l DOCKET NO. _50-286 Indian Point UNIT Mo 3 l
l DATE July 1, 1982 j
COMPLETED BY L.
Auterino TELEPHONE (914) 739-8200 MONTH J'2ne 82 1
DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'/
(MWe-Net)
(MWe-Net) 1 0
0' 17 2
0 I3 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
0 22 7
o 23 0
8 0
24 0
9 0
0 25 10 n
26 0
l I1 0
27 0
0 0
I2 28 l
13 0
0 29 l
l 14 0
0 30 0
15 3y 0
I6 INSTRUCTIONS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
(9/77)
1 UNITSIfUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNITNAME Indian Point No. 3 DATE Julv 1.
1982 REPORT MONTII June 82 COMPLETED BY L.
Auterino TELEPilONE (014) 710-8200 2
e e.
=.a :
c
$*'o Cause & Corrective
'S E
'EU Na
- Dat#
2:I a
_E E cc Event u?
- c. ?
'\\ction to
~ $5 5
j d5 g Report #
d' 0 0
Prevent Recurrence 1
6 04 82/03/25 S
720 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.
1 1
i
}
i I
2 3
4 F: Forced Reason:
Method:
Exhibit - Inst ructions i
S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance or Test 2 Manual Scrana.
Entr> Sheets for Licensee C Refucting 3-Automatic Scram.
Event Report tLER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F-Administrative 5
G. Operational Error (Explain)
Exhibit. - Same Source W/77)
It-Other (Explain)
?
I
MONTilLY I & C CATEGORY I PJEPORT June 1982 Month m
W.R.
No.
DATE EQUIPMENT MALFUrJCTION CORRECTIVE ACTION IC-1-1028-3C 5-20-82 Seismic Peak Shock Broken Switch Contact Fapaired Switch Contact Recorder PSR 1200-H/V-12A i
IC-1-1450-1 8-26-81 Reactor Trip Bypass Misalignment of Pins Installed Support brace Breakers BYA & BYB for Aux. Switches in breaker compartments IC-1-1676-2 l
5-15-82 Diesel Generator Fuel Switch defective Replaced switch Oil Tank d31 Outlet A P DPC-lll95 IC-1-1677-2 5-15-82 Diesel Generator Fuel Switch defective Replaced switch Oil Tank #33 Outlet AP DPC-ll21S i
l..--.._____._.___ _ _ _ _.
f10tlTIII,Y ttAltiTE!IAliCE 1(EI'OltT Jime 1992
- 1onth WrR. #
DATE EQUIPltEtiT
!!AIEUtiCTIOri CORRECTIVE ACTIOli I-2636 6-01-82 PCV-ll88 City Water to Aux.
Valve leaks through Lapped in valve seat Feed pump I-2927 6-23-82 PCV-ll8d City Water to Aux.
Valve leaks through Lapped in valve seat Feed pump I-2928 6-23-82 PCV-1189 City Water to Aux.
Valve leaks through Lapped in valve seat Feed pump I-2929 6-23-82 PCV-ll87 City Water to Aux.
Valve leaks through Lapped in valve seat Feed pinap e
G O
e OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.
Preparations for steam generator repairs, replacement of containment recirculation fan cooling coils, and replacement of 31 and 33 main turbine spindles continue.