ML20062G046

From kanterella
Jump to navigation Jump to search
Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Encl Schedules Provide Util Best Estimate Through FY94 to Meet Operator Licensing Needs
ML20062G046
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/20/1990
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To: Lange D
Office of Nuclear Reactor Regulation
References
GL-90-07, GL-90-7, NUDOCS 9011280362
Download: ML20062G046 (4)


Text

.

wGyi' n

Southem Califomia Edison Company 23 PARKER STREET 4RVINE, CAUFORNIA 92718 TELEPHONE F.R.NANDY (714) d54-d$04 MAP 4AGER. NUCLE AR LIC ENfMNO '

November 20,'1990-i U ' S. Nuclear Regulatory Commission Attention: Mr. David J.'Lange,. Acting Chief-Operator Licensing Branch. 0WFN-10D-22 Wahington, D. C. 20555

Dear Mr. Lange:

Subjec': Docket Nos. 50-206', 50-361, and'50-362 Response to Generic Letter.90-07.

San Onofre Nuclear Generating Station' Units 1,.2, and 3

Reference:

Letter, R. M. Rosenblum, SCE, 'to NRC, " Exemption : request for.

Simulator Certification:and Operator Requalification Exam Schedule," dated November 2,1990.-

l This letter provides the Southern California Edison Company'(SCE) response *.o' NRC Generic Letter 90-07, " Operator Licensing National Examination:Schedul<."

dated August 10, 1990.' The schedules on the enclosed ' sheets provide' SCE,-

best estimate through FY 19941to' meet ~oursoperator. licensing-needs. Thr.

P L

enclosed information is consistent'with the NRCf s National Examination Schedule provided in Generic Letter 89-03,~ dated March 24, 1989. TMs-schedule reflects agreements reached between:.SCE-and the NRC during meetings-on October 4 and 19, 1990, regarding the Unit 1' simulator and-operator-examination schedules as documented in'the referenced letter. LIf a significant change to our, estimates occurs, the NRC will be! notified.

If you have any questions, please contact me.

l Very 'truly yours,

,/;

Enclosures cc:

J. B. Martin, Regional Administrator, NRC Region V.

C. Caldwell, NRC Senior Resident Inspector,. San-Onofre Units 1, 2 and~.3 l

90u2eo362 901120 h~

PDR ADOCK O$000206

'3y 1

]' a (\\

P PDC i

=

1 Enclosure I PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT FACILITY: San Onofre Unit 1 NRC REGION Five F' 1991 FY'1992

. FY 1993 FY 1994-(10/1/90-(10/1/91-

'(10/1/92 :

'(10/1/93.

9/30/91) 9/30/92) 9/30/93) 9/30/94) 1.

Assigned-Date (GL89-03) 10/22-10/26 4/6-4/24 10/25-10/29

{

  1. R0's 4

15 20

  1. SR0 Instant _

1 3

0

  1. SR0 Upgrade

~0 4'

2'

  1. SR0 Limited 0

'O 0

FACILITY: San Onofre Units 2 and'3-NRC-LREGION' Five l

FY 1991 FY 1992-FY 1993 FY 1994 (10/1/90-(10/1/91-(10/1/92-(10/1/93-I 9/30/91) 9/30/92).

9/30/93) 9/30/94).

1 i

1.

Assigned ~

i Date (GL89-03) 7/22-8/2 7/20-7/31 7/19-7-30 7/18-7-29

-i s' R0's 18 12 12' 12 i

  1. $?0 Instant 0

5

-0 0'

  1. SR0 Upgrade 7

6 6

6

  1. SRO. Limited 0

0 0

0 F

i

5 Enclosure.11 PROPOSED REQUAllFICATION EXAMINATION SCHEDULE FORMAT-FACILITY: San Onofre Unit 1

'NRC REGION-Five" l

l

[

. FY 1993:

'FYl1994 L

FY 1991

.FY:1992 (10/1/90-(10/1/91.

.(10/1/92-(10/1/93-9/30/91) 9/30/92).

9/30/93)'

9/30/94) l 1.

Date 10/1-11/2 10/12-10/23 10/1'l-10/24?

7 2.

Date 4/15-5/27

  • 3.

Date 4.

Date 5.

Date Exams during this period will be-administered.by SCE; LNo NRC involvement is required.

l I

L FACILITY:

San Onofre Units 2 and 3 NRC REGION Five 1.

Date 1/21-2/1 1/4-1/15 2.

Date 3.

Date r

4.

Date 5.

Date t

I.

l.

l 0

\\

i o

.- l J 11 PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FORMAT l

FACILITY: San Onofre Units 1,-2, and 3 NRC REGION Five j

OCTOBER 1990 FEBRUARY 1991 JUNE 1991 1.

Estimated Number of

'i Candidates 36

=36 0

i i

The Generic Fundamental Examination Schedule (GFES) is. administered three times a year, on the Wednesday following the first Sunday in February, June, and October.

i i

'k

,