Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063J879 + (02:43:17, 17 December 2024)
- GO2-94-040, Forwards Editorial Rev 25 to WNP-2 Physical Security Plan Per 10CFR50.54(p).Withheld Plan Per 10CFR73.21 + (02:43:18, 17 December 2024)
- ML20063J851 + (02:43:19, 17 December 2024)
- ML20063J853 + (02:43:19, 17 December 2024)
- ML20063J850 + (02:43:20, 17 December 2024)
- ML20063J844 + (02:43:21, 17 December 2024)
- ML20063J825 + (02:43:21, 17 December 2024)
- ML20063J810 + (02:43:22, 17 December 2024)
- ML20063J817 + (02:43:22, 17 December 2024)
- ML20063J792 + (02:43:23, 17 December 2024)
- ML20063J808 + (02:43:23, 17 December 2024)
- ML20063J790 + (02:43:24, 17 December 2024)
- ML20063J756 + (02:43:25, 17 December 2024)
- ML20063J744 + (02:43:25, 17 December 2024)
- 1CAN029401, Forwards Arkansas Nuclear One-Unit 1 Monthly Operating Rept for Jan 1994 & 1993 Annual Rept of Safety & Relief Valve Failures & Challenges in Accordance w/ANO-1 TS 6.12.2.4. & NUREG-0737,Item Ii.K 3.3 + (02:43:26, 17 December 2024)
- ML20063J726 + (02:43:27, 17 December 2024)
- ML20063J715 + (02:43:28, 17 December 2024)
- ML20063J724 + (02:43:28, 17 December 2024)
- ML20063J714 + (02:43:29, 17 December 2024)
- ML20063J697 + (02:43:29, 17 December 2024)
- 05000348/LER-1982-040, Forwards LER 82-040/03L-0 + (02:43:30, 17 December 2024)
- ML20063J695 + (02:43:30, 17 December 2024)
- 05000306/LER-1982-014-03, /03L-0:on 820725,during Startup Operations, Flux Difference of Two ex-core Channels Deviated from Target Band for Greater than 15 Minutes.Caused by Personnel Error. Personnel Will Review Rept + (02:43:33, 17 December 2024)
- ML20063J688 + (02:43:33, 17 December 2024)
- ML20063J683 + (02:43:34, 17 December 2024)
- 05000338/LER-1982-053-03, /03L-0:on 820726,Type C Tests Revealed Containment Isolation Valves W/Unacceptable Leak Rates.Cause Undetermined.Valves Will Be Repaired or Adjusted & Acceptable Level of Leakage Verified + (02:43:36, 17 December 2024)
- 05000306/LER-1982-014, Forwards LER 82-014/03L-0 + (02:43:37, 17 December 2024)
- ML20063J671 + (02:43:37, 17 December 2024)
- 05000315/LER-1982-062-03, /03L-0:on 820728,during Refueling,Fire Door 415, Connecting Control Rooms,Would Not Fully Close on Two Occasions.Caused by Increased Ventilation Flow,Due to Unit 2 Open Cable Vault Door.Closure Mechanism Adjusted + (02:43:39, 17 December 2024)
- ML20063J658 + (02:43:41, 17 December 2024)
- ML20063J659 + (02:43:41, 17 December 2024)
- ML20063J655 + (02:43:42, 17 December 2024)
- ML20063J656 + (02:43:42, 17 December 2024)
- 05000338/LER-1982-053, Forwards LER 82-053/03L-0 + (02:43:43, 17 December 2024)
- ML20063J649 + (02:43:47, 17 December 2024)
- 05000272/LER-1982-054-03, /03L-0:on 820731,unidentified RCS Leakage Found to Be Greater than Tech Spec Limit.Caused by Failed Packing on Valve 1CV75.Valve Repacked & Will Be Permanently Repaired During Next Refueling Outage + (02:43:49, 17 December 2024)
- ML20063J644 + (02:43:50, 17 December 2024)
- ML20063J640 + (02:43:51, 17 December 2024)
- ML20063J636 + (02:43:52, 17 December 2024)
- 05000416/LER-1982-031-99, /99X-0:on 820722,special Insp Revealed Penetration Seal CV-19G Not Installed.Caused by Const Error.Penetration Will Be Sealed as Soon as Procedures & Qualified Personnel Available + (02:43:53, 17 December 2024)
- 05000272/LER-1982-054, Forwards LER 82-054/03L-0.Detailed Event Analysis Encl + (02:43:55, 17 December 2024)
- ML20063J623 + (02:43:55, 17 December 2024)
- ML20063J621 + (02:43:57, 17 December 2024)
- ML20063J617 + (02:43:58, 17 December 2024)
- ML20063J607 + (02:44:02, 17 December 2024)
- ML20063J603 + (02:44:03, 17 December 2024)
- ML20063J598 + (02:44:07, 17 December 2024)
- ML20063J597 + (02:44:07, 17 December 2024)
- ML20063J579 + (02:44:11, 17 December 2024)
- NG-94-0370, Responds to Deviation Noted in Insp Rept 50-331/93-19 on 931129-1209 of Commitments to GL 89-10.Corrective Actions: MOV Team Expanded & Has Been Reconstructed to Ensure Timely & Accurate Responses to NRC Commitments Re GL 89-10 + (02:44:12, 17 December 2024)
- ML20063J577 + (02:44:12, 17 December 2024)
- 05000416/LER-1982-028-01, /01T-0:on 820814,Halon Sys Surveillance Test Revealed That Acceptance Criteria for Change Pressure of Halon Bottles Not Met.Caused by Surveillance Test Performed Prior to Issuance of Ol.Halon Bottles Replaced + (02:44:17, 17 December 2024)