ML20063J655

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1994 for Grand Gulf Nuclear Station Unit 1
ML20063J655
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/31/1994
From: Hutchinson C, Lin S
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-94-00022, GNRO-94-22, NUDOCS 9402240109
Download: ML20063J655 (5)


Text

.

Entergy Operations,Inc.

cr~ENTERGY

==

r\\M Gt wn, MS 30 gn w mi CI Dy'0

. ~. -... -... - ~ - -. -. -. -. -.. - - -. ~ - - - -

~~-

~

C, R. Hutchinson Vv 'l* i '(LL t

February 14, 1994 n il ', nm, cm U.S. Nuclear Regulatory Commission Mail Station P1 137 Washington, D.C. 20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-94/00022 i

Gentlemen:

In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for January 1994.

If vou have any questions or require additionalinformation, please contact this office.

Yours truly, i

,f'/s A /)

/)

gy

/ // y.

,n4r"#

v CRH/TMC attachments:

1.

Operating Status 2.

Average Daily Power Level

?

3.

Unit Shutdown and Power Reduction cc:

(See Next Page)

T h

i

[

9402240109 940131 PDR ADOCK 0500 6

g

/

n,.

d.t

r February 14, 1994 GNRO-94/00022 Page 2 of 3 cc:

Mr. R. H. Bemhard (w/a)

Mr. D. C. Hintz (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

O. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator j

U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 b

i 3

t i

P l

i l

DOCKET NO 50-416 DATE 02/03/94 COMPLETED BY S. D. Lin TELEPHONE (601)437-6793 OPERATING STATUS 1.

Unit Name: GGNS UNIT 1 2.

Reporting Period: January 1994 3.

Licensed Thermal Power (MWt):' 3833 MWT 4.

Nameplate Rating (Gross MWe): 1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.

Maximum Dependable Capacity (Net MWe): 1143 MWE 8.

If changes occur in Capacity Ratings (ftems 3 through 7) Since Last Report. Give Resason:

N/A 9.

Power Level To Which Restricted, if Any (Net MWe):

N/A

10. Reasons For Restrictions, if Any:

N/A This Month Yr to Date Cumulative

11. Hours in Reporting Period 744 744 81.400
12. Number of Hours Reactor was Critical 744.0 744.0 65.430.6
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 744.0 744.0 62.803.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2.813.538 2.813.538 220.631.109
17. Gross Electrical Energy Generated (MWH) 928.112 928.112 70.235.616
18. Net Electrical Energy Generated (MWH) 893.640 893.640 67.265.027
19. Unit Service Factor 100.0 100.0 79.4
20. Unit Availability Factor 100,0 100.0 79.4
21. Unit Capacity Factor (Using MDC Net) 105.1 105.1 76.6
22. Unit Capacity Factor (Using DER Net) 96.1 96.1 69.5
23. Unit Forced Outage Rate 0

0 6.5

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End of Report Period. Estirnated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85

1 5

DOCKET NO 50-416 DATE 02/03/94 i

COMPLETED BY S. D. Lin TELEPHONE ID01) 437-6793 i

MONTH January 1994 Day AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1

1213 17 1202 2

1118 18 1230 3

1219 19 1230 4

1224 20 1225 5

1222 21 1224 5

6 1198 22 1210 7

1215 23 1219 8

1214 24 1202 9

1224 25 1193 10 1218 26 1195 11 1217 27 1021 12 1219 28 1216 1

13 1219 29 1089 14 1167 30 1221 15 1228 31 1225 16 1219 N/A 5

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME 1

DATE 02/03N4 COMPLETED BY S. D. Lin TELEPHONE 601-437 4793 i

REPORT MONTI JANUARY 1994 NO Date Type (1)

Duration Reason Method Of Licensee System Code Component Cause & Correctist Action To Hours (2)

Shutting Event Repon #

(4)

Code Prevent Recurrence (CACA)

Down Reactor (5)

(3)

NONE 1

2 3

4 5

F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NLHEG-0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &

5-Reduced load Licensing Examination 6-Other F-Administratist G-Operational Error (Explain)

II-Other (Explain)

~.

=.

....