Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064A585 + (02:13:26, 17 December 2024)
- ML20064A583 + (02:13:27, 17 December 2024)
- ML20064A584 + (02:13:27, 17 December 2024)
- ML20064A577 + (02:13:28, 17 December 2024)
- ML20064A567 + (02:13:29, 17 December 2024)
- ML20064A574 + (02:13:29, 17 December 2024)
- ML20064A562 + (02:13:30, 17 December 2024)
- ML20064A559 + (02:13:31, 17 December 2024)
- ELV-02056, Forwards Operator Exam Schedule for Facility,Per Generic Ltr 90-07 Request,Including Number of Candidates to Be Examined During NRC Site Visits,Requalification Schedules & Number of Candidates to Participate in Generic Fundamentals Exam + (02:13:32, 17 December 2024)
- ML20064A557 + (02:13:32, 17 December 2024)
- ML20064A549 + (02:13:33, 17 December 2024)
- ML20064A547 + (02:13:34, 17 December 2024)
- 05000278/LER-1990-010-03, :on 900804,HPCI Declared Inoperable Due to Failure of Manual & Overspeed Trip Tappet Assembly.Caused by Design Problem Re Tappet Swelling.New Design Being Provided by GE Will Replace Tappet Assembly + (02:13:36, 17 December 2024)
- ML20064A520 + (02:13:37, 17 December 2024)
- 05000416/LER-1990-014, :on 900810,retest Not Performed Prior to Returning Secondary Containment Isolation Valve to Operable Status.Caused by Programmatic Weaknesses in Administrative Controls.Plant Procedures Changed + (02:13:39, 17 December 2024)
- 05000254/LER-1990-016-02, :on 900809,loss of Diesel Fire Pump 1/2A Due to Failure of Starting Relays Occurred.Caused by Component Failure.Relays Replaced + (02:13:41, 17 December 2024)
- 05000254/LER-1990-017, :on 900811,observed Excessive Leakage Through HPCI Steam Exhaust Check Valve Due to Deterioration of Seat. Caused by Gap Between Seat & Disk Along Ctr Sealing Surface of Disks.Steam Exhaust Check Valve Replaced + (02:13:44, 17 December 2024)
- ML20064A478 + (02:13:45, 17 December 2024)
- ML20064A482 + (02:13:45, 17 December 2024)
- ML20064A476 + (02:13:47, 17 December 2024)
- ML20064A475 + (02:13:48, 17 December 2024)
- ML20064A474 + (02:13:49, 17 December 2024)
- ML20064A473 + (02:13:49, 17 December 2024)
- ML20064A471 + (02:13:50, 17 December 2024)
- ML20064A470 + (02:13:51, 17 December 2024)
- ML20064A466 + (02:13:51, 17 December 2024)
- ML20064A463 + (02:13:52, 17 December 2024)
- ML20064A465 + (02:13:52, 17 December 2024)
- ELV-02033, Semiannual Radioactive Effluent Release Rept for Jan-June 1990 + (02:13:53, 17 December 2024)
- TXX-9030, Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-131 + (02:13:54, 17 December 2024)
- ML20064A441 + (02:13:55, 17 December 2024)
- ML20064A436 + (02:13:56, 17 December 2024)
- ML20064A438 + (02:13:56, 17 December 2024)
- ML20064A435 + (02:13:57, 17 December 2024)
- ML20064A400 + (02:13:58, 17 December 2024)
- ML20064A402 + (02:13:58, 17 December 2024)
- NRC-90-0117, Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred + (02:13:59, 17 December 2024)
- ML20064A387 + (02:13:59, 17 December 2024)
- ML20064A375 + (02:14:00, 17 December 2024)
- B13618, Forwards Addl Info on Util 900815 Relief Request from ASME Code Section XI Requirements,Per 10CFR50.55a(g)(6)(i),for Repairs to Pipe 3SWP-006-050-03 + (02:14:01, 17 December 2024)
- ML20064A368 + (02:14:02, 17 December 2024)
- ML20064A370 + (02:14:02, 17 December 2024)
- ML20064A343 + (02:14:03, 17 December 2024)
- ML20064A337 + (02:14:04, 17 December 2024)
- ML20064A338 + (02:14:04, 17 December 2024)
- SNRC-1747, Forwards Semiannual Radioactive Release Rept for First & Second Quarters 1990 & Revised ODCM + (02:14:05, 17 December 2024)
- ML20064A333 + (02:14:05, 17 December 2024)
- ML20064A331 + (02:14:06, 17 December 2024)
- PY-CEI-NRR-1211, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086 + (02:14:09, 17 December 2024)
- HL-1245, Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d + (02:14:10, 17 December 2024)
- ML20064A291 + (02:14:12, 17 December 2024)
- ML20064A289 + (02:14:13, 17 December 2024)