ML20064A559
| ML20064A559 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/04/1990 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20064A560 | List: |
| References | |
| NUDOCS 9009140100 | |
| Download: ML20064A559 (3) | |
Text
_ _ _ _ - _ _ _ _ _
F e l.. e,Ly w i
-,N 3
p;
' lla R hcd '
n,
< - ikke hmwr Compay Ike hesident '
90 ha 33I9S.
+;
i (marlotte. NC 28342 '
' Nulest hvducthe
~
(704)373 4531 as
[.
DUKEPOWER September 4, 1990 U.~ S. Nuclear Regulatory Constission -
ATTNt' Document Control Desk Washington, D.C.
20555 Subjects - McGuire Nuclear Station Docket 50-369.and 50-370 Technical Specification Change
= To Allow: Reduced Reactor Coolant'. System Flow Requirements Because of steam generator tube degradation, it has been necessary to plug; or sleeve some of the tubes in'the steam generators in both units at-McGuire.- An effect of this repair may_be the reduction of Reactor Coolant S
System (RCS) Flow.. Attached is a proposed technical specification change
-which would reduce the required measured flowrate by 1 percent.(from 97220 GPM/ Loop _toL96250 GIM/ Loop). Also, an administrative change is being-made to delete references to the RTD bypass manifold system. This systs was deleted from both units, and technical specification references are obsolete. ; Deletion;of the system was approved by the NRC staff in a previous; license amendment. The revised pages from technical
- specifications are included as Attachment I, the Justification and Safety Analysis appear,in Attachment II, and a "No Significant Hazards" analysis is contained'in Attachment III.
'If thare are any questions, please call Scott Gewehr at (704) 373-7581.,
Very truly yours -
A h
/
Hal B. Tucker i
SAG 185/lcs Q..,
> ? -'
14 -
l k
O 0
9009140100 900904% y
\\\\
PDR ADOCK 05000369w p.
PNU M
\\
j j
c
1(1i,,
+
Document Contri1 De:k
. Pagy 2 September 4, 1990' t
Y xc D. S. Hood, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission i
Washington, D.C. -20555 i
S. D. Ebneter, Regional' Administrator
,w U..S. Nuclear Regulatory Commission ~, Region II 101 Marietta'St. NW, Suite 2900' Atlanta, Georgia 30323 P. K. VanDoorn Senior Resident Inspector i
McGuire Nuclear Station-
,4 t
V i
p 5
ll h
- i'
!?:
i-s
~-
( :"
s,',
k 1
J"ii U. S. Nut b r Regul:tiry Cosmicsion
)
?'
September (),1990' i
2, Page 3'
]
1 i
I
'Hal B. Tuter, being duly sworn, states that he is Vice President of Duke
- Power Company; that he is authorir.ed on the part of said Company to sign and :
file with tha Nuclear Regulatory Commission this revision to the McGuire-j Nuc16sr Statian Licenses NPF 9 and NPF-17 and that all statements and matter met forth therein are true and correct'to the best of his' knowledge.
-)
i M
Hal B. Tucker, Vice President
?
l l
Subscribed and sworn to before me this 4th day of September, 1990.
l nh>
A-oTary PublYc > './
1 My Commission Expires:
777am, O /W v
m
/.
jfbgionies,h,g M-u l
$ 3,f g o T A u ) *g g
E w)r.:gi,Pust \\C g o5
^u O'a J
jmg
.$b..i.b.
I i
l r
I