Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065B164 + (01:05:07, 17 December 2024)
- ML20065B163 + (01:05:07, 17 December 2024)
- ML20065B162 + (01:05:08, 17 December 2024)
- ML20065B161 + (01:05:08, 17 December 2024)
- 05000361/LER-1982-086-03, /03L-0:on 820806,control Element Assembly 38 Slipped & Dropped in Excess of Tech Specs.Caused by Slow Operation of Grippers.Control Element Assembly Exercised, Oxide Deposits Removed W/Hydrazine & Circuits Modified + (01:05:10, 17 December 2024)
- ML20065B158 + (01:05:11, 17 December 2024)
- ML20065B153 + (01:05:12, 17 December 2024)
- ML20065B156 + (01:05:12, 17 December 2024)
- ML20065B150 + (01:05:13, 17 December 2024)
- ML20065B152 + (01:05:13, 17 December 2024)
- 05000361/LER-1982-085-03, /03L-0:on 820805,control Element Assembly 68 Slipped & Dropped in Excess of Tech Specs.Caused by Slow Operation of Grippers.Control Element Assembly Exercised, Oxide Deposits Removed W/Hydrazine & Circuits Modified + (01:05:16, 17 December 2024)
- ML20065B143 + (01:05:17, 17 December 2024)
- 05000361/LER-1982-084-03, /03L-0:on 820801,control Element Assembly 57 Slipped & Dropped in Excess of Tech Specs.Caused by Slow Operation of Grippers.Control Element Assembly Exercised, Oxide Deposits Removed W/Hydrazine & Circuits Modified + (01:05:18, 17 December 2024)
- ML20065B134 + (01:05:19, 17 December 2024)
- ML20065B133 + (01:05:24, 17 December 2024)
- ML20065B131 + (01:05:27, 17 December 2024)
- ML20065B130 + (01:05:30, 17 December 2024)
- ML20065B126 + (01:05:31, 17 December 2024)
- ML20065B124 + (01:05:32, 17 December 2024)
- 05000387/LER-1983-012-03, /03L-0:on 830113,during Startup Test Program, Reactor Recirculation Pump a Tripped Off.Caused by Defective Transformer That Had Shorted Secondary.Transformer Replaced. Pump Returned to Svc + (01:05:33, 17 December 2024)
- ML20065B122 + (01:05:34, 17 December 2024)
- 05000278/LER-1983-004-03, /03L-0:on 830127,during Power Operation,Torus Purge Air Supply AO-3521-B Did Not Fully Close Upon Completion of Deinerting Operations.Caused by Piece of Plastic Falling Through Pipe Chase.Plastic Removed + (01:05:36, 17 December 2024)
- ML20065B116 + (01:05:37, 17 December 2024)
- 05000387/LER-1983-012, Forwards LER 83-012/03L-0 + (01:05:41, 17 December 2024)
- ML20065B114 + (01:05:41, 17 December 2024)
- ML20065B105 + (01:05:43, 17 December 2024)
- ML20065B104 + (01:05:44, 17 December 2024)
- FVY-82-101, Verifies That Design Criteria for NUREG-0737,Item II.K.3.22, Automatic Switchover of Reactor Core Isolation Cooling Sys Suction, Has Been Satisfied + (01:05:45, 17 December 2024)
- 05000293/LER-1983-004-03, /03L-0:on 830117,reactor Pressure Sys (RPS) Breaker 5 Acb 1A Overheated Causing RPS a to Trip & Initiating Half Scram to Reactor.Caused by High Internal Resistance.Breaker Replaced + (01:05:46, 17 December 2024)
- ML20065B097 + (01:05:47, 17 December 2024)
- ML20065B095 + (01:05:48, 17 December 2024)
- ML20065B092 + (01:05:48, 17 December 2024)
- ML20065B089 + (01:05:49, 17 December 2024)
- 05000293/LER-1983-004, Forwards LER 83-004/03L-0 + (01:05:50, 17 December 2024)
- ML20065B086 + (01:05:50, 17 December 2024)
- ML20065B079 + (01:05:52, 17 December 2024)
- ML20065B085 + (01:05:52, 17 December 2024)
- ML20065B077 + (01:05:53, 17 December 2024)
- ML20065B076 + (01:05:53, 17 December 2024)
- ML20065B073 + (01:05:58, 17 December 2024)
- ML20065B069 + (01:05:59, 17 December 2024)
- ML20065B063 + (01:05:59, 17 December 2024)
- ML20065B062 + (01:06:00, 17 December 2024)
- ML20065B061 + (01:06:01, 17 December 2024)
- 05000387/LER-1983-011, Forwards LER 83-011/03L-0 + (01:06:02, 17 December 2024)
- ML20065B055 + (01:06:03, 17 December 2024)
- PM-82-868, Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per 10CFR50,App J,Section VB Requirements + (01:06:04, 17 December 2024)
- ML20065B051 + (01:06:05, 17 December 2024)
- 05000416/LER-1983-013-99, /99X-0:on 830119,while in Cold Shutdown,Three Doors in Auxiliary Bldg Blocked Open to Support Plant Testing.Fire Watches Established.Testing Completed & Doors Closed on 830127 + (01:06:07, 17 December 2024)
- ML20065B047 + (01:06:11, 17 December 2024)
- ML20065B045 + (01:06:12, 17 December 2024)