ML20065B134

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1983
ML20065B134
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/14/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20065B135 List:
References
NUDOCS 8302220408
Download: ML20065B134 (1)


Text

-

M;iting Addr;ss Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

b n%l30 Tff"'

NabamaPower filt? SOUlllt?f1104ClrIC SySIUIT1 February 14, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S.

Nuclear Regulatory Commission

-Washington, D.C.

20555

Dear Sir:

RE: Joseph M.

Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the January, 1983 Monthly Operating Report for Joseph M. Fa rl ey Nuclear Pl ant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21, 1977, a "Narra-tive Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly,

.la FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) t 8302220408 830214 PDR ADOCK 05000364 R

PDR