ML20065B130

From kanterella
Jump to navigation Jump to search
Clarifies Criteria for Document Storage Vault Set by ANSI N45.2.9-1974.Light,power & Communications Penetrations Will Be Included in Facility Record Storage Vault
ML20065B130
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/03/1982
From: Tauber H
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
EF2-59-069, EF2-59-69, NUDOCS 8209140263
Download: ML20065B130 (2)


Text

.

~

' HIrry Teuber NarNSIab Coneuuon I

i Detroit Edison EWinna j

September 3,1982 EF2 - 59,069 Mr. B. J. Youngblood, Chief.

Licensing Branch No. 1 Division of Licensing U.

S. Nuclear Regulatory Commission Washington, D. C. 20555 j

Dear Mr. Youngblood:

Re ference :

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 i

Subject:

Criteria for Document Storage Vault j

Clarification on ANSI N45.2.9 - 1974 i

l Detroit Edison is in the process of constructing its secure record storage facility in the new Nuclear j

Operations Center at the Fermi 2 site.

While Nuclear

. Operations has elected to adopt the " dual storage" facility option provided by ANSI N42, since most of our documentation will be stored on multi-copy micro-form, unfilmable materials will reside in this area.

We have committed in.the FSAR (Chapter 17, paragraph 17 2.17) that this storage facility must be built in l

accordance with the standards set by ANSI N45 2 9-1974.

However, a careful review and analysis of these stan-i dards, if literally interpreted, suggests that light, i

power, and communications cable penetrations are pro-hibited.

Since this posture seems extreme, we con-i tacted Mr. Les Kintner and Mr. John Gilray of your i

' organization for clarification.

Mr. Gilray was sympathetic with our position and suggested we talk with the administrator of a recently constructed, and NRC accepted, storage facility.

We did so, and found that Northeast Utilities' vault i

doeu, in fact, have light, power, and communications penetrations.

Accordingly, it is our intention to proceed in a similar fashion.

[

300 i

1 8209140263 820903 l

PDR ADOCK 050003gg A

Mr B.

J. Youngblood September 3, 1982 EF2 - 59,069 Page 2 If the above is not acceptable, we request that you inform us as soon as possible so that we may resolve any comments you may have since construction of the Nuclear Operations Center has begun.

Sincerely,

b. M -Si h

n.T w cc:

Mr. J. W. Gilray Mr. L. L. Kintner Mr. B. Little