Advises That NUREG-0737,Item II.K.3.22,satisfied.Partially Qualified Switches Installed as Interim Measure Determined to Fully Comply W/Criteria of Core Isolation Cooling Sys Suction
ML20065B073
Person / Time
Site: FitzPatrick 
Issue date: 09/09/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.22, TASK-TM JPB-82-100, JPN-82-73, NUDOCS 8209140240
Download: ML20065B073 (2)


Text

,,.

POWER AUTHORITY OF THE STATE OF NEW YORK

'Q 10 COLUMeus CIRCLE NEW YORK. N. Y. too19 j.. ( 'h a212> 397 6200

'E"oY g,5 M '^,',"

g g g, o..m atesse cep ec.=

^

,,,f,,*, ][,

JOHN 9 DVSON l'.;l';*.'.*l,':.',,,.

GEORGE L INGALLS W IC S CMaligMAN JOSE PH R. SCHMIEDER RICHAMd M',fLYt4N e.a oser & c se r Race i Ma.cO""

September 9, 1982 aoHu w.

oSvou

,n,oEaicx R. eoaa JPB-82-100

.". !.*,1'.'!! l.'* :. m....

' "" ~~~~*"

JPN-82-73 THOM AS R. FREY Director of Nuclear Reactor Regulation Ul="."'lle"o""2"'

U.S.

Nuclear Regulatory Commission Wachington, D.C.

20555 Attention:

Mr. Domenic B.

Vassallo, Chief Operating Reactors Branch No. 2 s

i Division of Licensing

Subject:

James A.

Fi.tzPatrick Nuclear Power Plant

(

Docket No. 50-333 NUREG-0737 Item II.K.3.22 Automatic Switchover of Reactor

(

Core Isolation Cooling System Suction

References:

1.

D.B. Vassallo (USNRC) to L.W. Sinclair (PASNY) dated August 5, 1982 - same subject 2.

J,P.

Bayne (PASNY) to T.A.

Ippolito dated January 11, 1982 regarding post-TMI requirements submittals and modifications required by January 1, 1982 (JPN-82-7) y

Dear Sila:

~

Item II.K 3.22 of, NUREG-0737 required the automatic switchover of l

[

the Reactor Core Isolation Cooling (RCIC) system suction from the con-densate tank to the torus.

P.eference letter 1 requested that the Authority verify that the acceptance criteria included with that letter have been satisfied.

We have compared these criteria to the system modification and find that it fully satisfies the stated criteria.

In Reference 2, the Authority stated that fully qualified level switches could not be obtained in time for the scheduled installation.

I7 We further stated that the modification would be completed using par-si, tji' ally qualified switches, with fully qualified units being installed

'suben ' they become available.

During our review of this modification

, and equipment qualification documentation, we have determined that the

)

currently installed switches fully comply with the criteria of Reference 1*

a g-

'8209140240 820909 '

]

PDft ADOCK 05000333 3 P

PDR d

. Therefore, it is no longer necessary to replace these_ switches as previously stated.

We consider this modification complete for the FitzPatrick plant.

If you have any questions, please contact Mr.

J.A.

Gray, Jr.

of my staff.

Very truly yours,

~

('

J, P. B y eY

-_ Executive Vice President Nuclear Generation cc:

Mr. Ron Barton United Engineers & Constructors, Inc.

30 S.

17th Street Philadelphia, PA 19101 Mr.

J.

Linville Resident Inspector U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, N.Y.

13093' f