Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065L849 + (00:28:00, 17 December 2024)
- ML20065L846 + (00:28:01, 17 December 2024)
- ML20065L845 + (00:28:02, 17 December 2024)
- ML20065L838 + (00:28:03, 17 December 2024)
- ML20065L836 + (00:28:03, 17 December 2024)
- ML20065L830 + (00:28:04, 17 December 2024)
- ML20065L827 + (00:28:05, 17 December 2024)
- ML20065L826 + (00:28:06, 17 December 2024)
- ML20065L825 + (00:28:07, 17 December 2024)
- ML20065L821 + (00:28:08, 17 December 2024)
- ML20065L815 + (00:28:08, 17 December 2024)
- 05000316/LER-1982-080-03, /03L-0:on 820909,west Component Cooling Water HX Outlet Valve CMO-420 Removed from Svc Due to Leak.Caused by Elastomer Seat Being Pulled Loosed from Valve Body.Valves Returned to Manufacturer + (00:28:10, 17 December 2024)
- ML20065L811 + (00:28:12, 17 December 2024)
- ML20065L813 + (00:28:12, 17 December 2024)
- 05000317/LER-1990-028, :on 901008,neither Train of Control Room Ventilation Operable Due to Operator Error + (00:28:14, 17 December 2024)
- 05000316/LER-1982-080, Forwards LER 82-080/03L-0 + (00:28:18, 17 December 2024)
- ML20065L803 + (00:28:19, 17 December 2024)
- 0CAN129002, Special Rept:On 901026,fire Pump Inoperable for More than 7 Days.Temporary Pump Installed as Backup + (00:28:20, 17 December 2024)
- ML20065L801 + (00:28:20, 17 December 2024)
- ML20065L798 + (00:28:21, 17 December 2024)
- ML20065L796 + (00:28:22, 17 December 2024)
- ML20065L797 + (00:28:22, 17 December 2024)
- 0CAN119012, Revises Commitment Completion Date Re Identification of Control Panels Per Reg Guide 1.97 Until 910131 + (00:28:23, 17 December 2024)
- ML20065L788 + (00:28:25, 17 December 2024)
- ML20065L794 + (00:28:25, 17 December 2024)
- ML20065L785 + (00:28:30, 17 December 2024)
- ML20065L780 + (00:28:31, 17 December 2024)
- ML20065L782 + (00:28:31, 17 December 2024)
- ML20065L778 + (00:28:32, 17 December 2024)
- ML20065L777 + (00:28:32, 17 December 2024)
- BECO-94-036, Requests Approval to Use Alternative Reactor Building Response Spectra,Reg Guide 1.61 & ASME Code Case N411 Modal Damping as Alternate to Existing Design Response Spectra + (00:28:33, 17 December 2024)
- ML20065L776 + (00:28:33, 17 December 2024)
- ML20065L774 + (00:28:34, 17 December 2024)
- NRC-94-4099, Forwards Westinghouse Responses to NRC Requests for Addl Info on AP600 from Ltrs of 940113 & 26 + (00:28:35, 17 December 2024)
- ML20065L760 + (00:28:35, 17 December 2024)
- ML20065L753 + (00:28:36, 17 December 2024)
- ML20065L754 + (00:28:36, 17 December 2024)
- 05000315/LER-1982-082-03, /03L-0:on 820908,low Pressure Carbon Dioxide Sys for AB Diesel Generator Room Discovered Isolated W/No Fire Watch Posted,Contrary to Tech Specs.Responsible Individual Undetermined.Personnel Trained in Fire Door + (00:28:38, 17 December 2024)
- ML20065L746 + (00:28:39, 17 December 2024)
- 05000315/LER-1982-081-03, /03L-0:on 820908,during Routine Turbine Bldg Tour, Operator Discovered Cd Diesel Room Carbon Dioxide (CO2) Sys Isolated W/No Names on Entry Board & No Personnel in Room. Caused by Personnel Error.Proper Use of CO2 Sys Discus + (00:28:40, 17 December 2024)
- ML20065L724 + (00:28:41, 17 December 2024)
- ML20065L721 + (00:28:42, 17 December 2024)
- ML20065L713 + (00:28:42, 17 December 2024)
- BECO-90-150, Submits Ltr of Intent Re Containment Integrated Leak Rate Test Planned for Refueling Outage 8 + (00:28:43, 17 December 2024)
- JPN-90-071, Advises That Schedule of Corrective Action Re Containment Hydrogen Monitoring Discrepancy Will Be Submitted by 910102 + (00:28:44, 17 December 2024)
- AECM-82-477, Advises of Completion of Thermocouple Qualification Testing Per SER Suppl 3.Thermocouples Considered Qualified for Seismic & Hydrodynamic Loads Including Variable Pool Swell. Final Test Rept Will Be Reviewed Upon Receipt + (00:28:48, 17 December 2024)
- JPN-90-072, Forwards Response to NRC 900905 Request for Addl Info Re Proposed TS Changes to Spent Fuel Pool Storage Capacity + (00:28:49, 17 December 2024)
- ML20065L676 + (00:28:53, 17 December 2024)
- 05000368/LER-1982-030-01, /01T-0:on 820922,measurements Revealed Shoulder Gap Clearances on Certain Batch C Fuel Assemblies May Not Be Sufficient to Prevent Pin Contact.Caused by Design Models & Annealed Guide Tubes Growing at Lesser Rate + (00:28:55, 17 December 2024)
- NLS9000537, Forward Initial Simulator Certification Submittal, Per 10CFR55.45 + (00:28:56, 17 December 2024)
- B10577, Final Deficiency Rept Re Design & Const of Metal Shavings in Containment Recirculation Pump Motor.Initially Reported on 820331.Event Not Considered Reportable Significant Deficiency Per 10CFR50.55e + (00:28:57, 17 December 2024)
- ML20065L665 + (00:28:57, 17 December 2024)