Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065P862 + (00:16:15, 17 December 2024)
- W3P82-3273, Forwards Revised Text of Facility Info Safety Brochure. Revision Improves Readability & Reflects Comments Received from NRC & Fema.Text Will Be Incorporated Into Printer Proof by 821112 Per ASLB Requirement.Comments Requested by 821103 + (00:16:16, 17 December 2024)
- 05000339/LER-1982-065-03, /03L-0:on 821007,control Power for a Casing Cooling Pump Found de-energized Due to Open Circuit Breaker. Cause Unidentified.Circuit Breaker Closed + (00:16:18, 17 December 2024)
- 05000335/LER-1982-044, Forwards LER 82-044/03L-0 + (00:16:19, 17 December 2024)
- ML20065P841 + (00:16:20, 17 December 2024)
- 05000260/LER-1982-029-03, /03L-0:on 820921,pinhole Leak Discovered in 3-inch Fire Protection Line Supplying Water to cable-tray Fixed Water Spray Sys.Caused by through-wall Pitting Corrosion Attack.Ultrasonic Testing to Be Done by 830201 + (00:16:23, 17 December 2024)
- ML20065P829 + (00:16:26, 17 December 2024)
- ML20065P828 + (00:16:26, 17 December 2024)
- ML20065P820 + (00:16:27, 17 December 2024)
- NRC-94-0034, Requests Exemption from Requirement to for Licensee at Site to Annually Exercise Emergency Plan,Per 10CFR50,App E, Section IV.F.2 + (00:16:28, 17 December 2024)
- ML20065P819 + (00:16:28, 17 December 2024)
- 05000260/LER-1982-029, Forwards LER 82-029/03L-0 + (00:16:29, 17 December 2024)
- ML20065P813 + (00:16:30, 17 December 2024)
- NLS9000559, Provides 30-day Response to Generic Ltr 89-10,Suppl 3 Re NRC-sponsored Tests of motor-operated Valves + (00:16:30, 17 December 2024)
- 05000339/LER-1982-065, Forwards LER 82-065/03L-0 + (00:16:31, 17 December 2024)
- 05000325/LER-1982-103, Forwards LER 82-103/03L-0 + (00:16:32, 17 December 2024)
- ML20065P803 + (00:16:32, 17 December 2024)
- JAFP-82-0853, Suppls Response to NRC 820120 & 0702 Ltrs Re Items Noted in IE Health Physics Appraisal Rept 50-333/80-20.Corrective Actions:Schedule for Technician Retraining Established & Engineering Controls Will Be Part of ALARA Program + (00:16:33, 17 December 2024)
- ML20065P784 + (00:16:34, 17 December 2024)
- ML20065P781 + (00:16:37, 17 December 2024)
- ML20065P779 + (00:16:38, 17 December 2024)
- BSEP-90-0811, Monthly Operating Rept for Nov 1990 for Brunswick Units 1 & 2 + (00:16:39, 17 December 2024)
- ML20065P763 + (00:16:39, 17 December 2024)
- ML20065P761 + (00:16:40, 17 December 2024)
- ML20065P760 + (00:16:41, 17 December 2024)
- ML20065P759 + (00:16:41, 17 December 2024)
- B14393, Application for Amend to License DPR-65,revising TS to Modify Indicated Measurement Range for Neutron Flux Monitor on Remote Shutdown Panel & Correct Typos & Administrative Errors + (00:16:42, 17 December 2024)
- ML20065P746 + (00:16:42, 17 December 2024)
- ML20065P739 + (00:16:47, 17 December 2024)
- ML20065P735 + (00:16:47, 17 December 2024)
- JAFP-82-1106, Ro:On 820628,combustion in Offgas Sys Observed.Caused by Improper Valve Lineup Allowing More Gas to Recombiner than Dilution Flow Rate Could Support.Incident Discussed W/Shift Supervisor & Training Will Be Developed + (00:16:48, 17 December 2024)
- ML20065P724 + (00:16:49, 17 December 2024)
- ML20065P730 + (00:16:49, 17 December 2024)
- ML20065P723 + (00:16:50, 17 December 2024)
- ML20065P719 + (00:16:50, 17 December 2024)
- 05000373/LER-1982-105-03, /03L-0:on 820920,during LOS-PC-01,valve 1833-F020, Reactor Water Sample Outboard Isolation Valve,Closed Outside Tech Spec Limit.Caused by Spring Tension Not Great Enough to Close Valve.Valve Spring Tightened + (00:16:52, 17 December 2024)
- 05000373/LER-1982-105, Forwards LER 82-105/03L-0 + (00:17:00, 17 December 2024)
- LIC-90-0941, Confirms That Response Re Implementation of Automatic Steam Generator Overfill Protection Sys Extended + (00:17:00, 17 December 2024)
- BSEP-82-2259, Ro:While Performing Insp of Fire Dampers Per 820518 Commitment,Discovered Ventilation Duct Located at Penetration Seal DG-2-034 on 23-ft Elevation of Diesel Generator Bldg Did Not Have Insp Door + (00:17:01, 17 December 2024)
- 05000338/LER-1982-063-03, /03L-0:on 820924,ambient Temp Signal Conditioner & Control Room Delta Temp Recorder Responses Found to Exceed Calibr Procedure Acceptance Criteria.Caused by Instrument Drift.Instruments Recalibr + (00:17:06, 17 December 2024)
- 05000338/LER-1982-063, Forwards LER 82-063/03L-0 + (00:17:07, 17 December 2024)
- ML20065P699 + (00:17:08, 17 December 2024)
- 05000285/LER-1950-285, Documents Deletion of Licensing Basis Commitment in LER 50-285/77-5 Re Failure of Reactor Protective Sys Trip Unit to Trip Prescribed Setpoint,Due to Improper Pretrip & Trip Indication Bulbs in Trip Unit Circuitry + (00:17:09, 17 December 2024)
- RBG-13-570, Interim Deficiency Rept DR-75 Re Error Found in Ghosh Computer Program Used in Reactor Bldg Hydrodynamic Analysis. Initially Reported on 820921.Investigation to Determine Significance of Error Continuing.Next Rept by 830114 + (00:17:09, 17 December 2024)
- SNRC-1775, Responds to Suppl 3 to Generic Ltr 89-10 Re Results of NRC- Sponsored Tests of motor-operated Valves + (00:17:10, 17 December 2024)
- ML20065P693 + (00:17:11, 17 December 2024)
- ML20065P694 + (00:17:11, 17 December 2024)
- ML20065P688 + (00:17:12, 17 December 2024)
- ML20065P690 + (00:17:12, 17 December 2024)
- PLA-1150, Responds to 820604 Systematic Assessment of Licensee Performance.Items Discussed Include Licensed Operators, Health Physics & Chemistry Staffs,Operating Procedures, Punch List Status & Open Items + (00:17:13, 17 December 2024)
- ML20065P677 + (00:17:14, 17 December 2024)
- ML20065P678 + (00:17:14, 17 December 2024)