ML20065P760

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Remote Shutdown Monitoring Instrumentation
ML20065P760
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/22/1994
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20065P758 List:
References
NUDOCS 9404290271
Download: ML20065P760 (6)


Text

.

4 Docket No. 50-336 B14393 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Remote Shutdown Monitoring Instrumentation Marked-Up Technical Specifications t

April 1994 9404290271 940422 PDR ADOCK 05000336

.P _-_

PDR

l O r. d. 2 ^, '^0^

INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION-PAGE 4

3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 LINEAR HEAT RATE.......................................

3/4 2-1 i

3/4,z.3 3/4.2.2 Deleted TOTALINTEGRATEDRADIALPEAKINGFACTOR-Ff............

3/4 2-9 3.4.2.3 3/4.2.4 AZIMUTHAL POWER TILT...................................

3/4 2-10 3/4.2.5 Deleted i

3/4.2.6 DNB HARGIN.............................................

3/4 2-13 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION.....................

3/4 3-1 3. '. 3. 2-ENGI.'EERED SAFETY FEATURE ACTUATION SYSTEM 3 /4.'3. 2 INSTRUMENTATION......................................

3/4 3-10 3/4.3.3 MONITORING INSTRUMENTATION.............................

3/4 3-26 i

Radiation Monitoring...................................

3/4 3-26 Incore Detectors.......................................

3/4 3 30 Seismic Instrumentation................................

3/4 3-32 MeteoroT5gTEaT~TnstT01ientatt g

hw Sourcom sm%wma Chi cri r.e De ttet4en-Syttems c........................ 34 3-39 3/4 ' '2-

~'

^

DE ITe't e c ti o n I n s t rume n t a t i o n.........................

3/4 3-43 ec Accident Monitoring....................................

3/4 3-46 Radioactive Liquid Effluent Monitoring Instrumentation.

3/4 3 50 Radioactive Gaseous Effluent Monitoring Instrumentation 3/4 3-56 q3l4,4

>3,4.4)EACTORCOOLANTSYSTEM s

3/4.4.1 COOLANT LOOPS AND COOLANT CIRCULATION..................

3/4 4-1 Startup and Power 0peration............................

3/4 4-1 Hot Standby............................................

3/4 4-la i

Shutdown..

3/4 4-lb MILLSTONE - UNIT 2 V

Amendment No. JE, JE, EE,

( 9 3. 19.4

  1. 1

o T."0LE 3.3-9 x

h REMOTE SHUTD0'a?4 MONITORING INSTRUMENTATION

$g MINIMUM m

REA00!!T MEASUREMENT CHANNELS INSTRUMENT c-

-Lf' RANGE OPERABLE a

k 1.

Wide Range Logarithmic Neutron Flux t

en Panel

~

---4^

Monitor L

10 % - 100%

1 y

2.

Reactor Trip Breaker Indication Reactor Trip OPEn-CLOSE 1/ trip breaker Switchgear (003) 3.

Reactor Cold tv; Temperature Hot Shutdown Panel 0-600*F 1

(C-21) 4.

Pressurizer Pressure Hot Shutdown Panel a.

Low Range (C-21) 0-1600 psia 1

m2 b.

High Range 1500-2500 psia 1

5 5.

Pressurizer Level

  • Hot Shutdown Panel 0-100%

1 (C-21) k

-o 6.

Steam Generator Pressure Hot Shutdown Panel 0-1200 psia 1/ steam generator (C-21)

  • J 7.

Steam Generator Level Hot Shutdown Panel 0-100%

1/ steam-generator (C-21)

T P

\\

di 8

k, ~ _.

{'

-l J

c

= -

Docket No. 50-336 flL4191

'l Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specific 3tions Remote Shutdown Monitoring Instrumentation Retyped Technical Specifications April 1994-

i' INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION 3/4.2 POWER DISTRIBUTION LIMITS PAGE 3/4.2.1 LINEAR HEAT RATE 3/4 2-1 3/4.2.2 Deleted 3/4.2.3 TOTAL INTEGRATED RADIAL PEAKING FACTOR - Ff......

3/4 2-9 3/4.2.4 AZIMUTHAL POWER TILT 3/4 2-10 3/4.2.5 Deleted 3/4.2.6 DNB HARGIN 3/4 2-13 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTIVE INSTRUMENTATION 3/4 3-1 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION....................

3/4 3-10 3/4.3.3 MONITORING INSTRUMENTATION 3/4 3-26 Radiation Monitoring

.................. 3/4 3-26 Incore Detectors 3/4 3-30 Seismic Instrumentation.................

3/4 3-32 Meteorological Instrumentation 3/4 3-36 Remote Shutdown Instrumentation.............

3/4 3-39 Fire Detection Instrumentation 3/4 3-43 Accident Monitoring...................

3/4 3-46 Radioactive Liquid Effluent Monitoring Instrumentation 3/43-50 Radioactive Gaseous Effluent Monitoring Instrumentation.

3/4 3-56 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 COOLANT LOOPS AND COOLANT CIRCULATION..........

3/4 4-1 Startup and Power Operation...............

3/4 4-1 Hot Standby.......................

3/4 4-la Shutdown 3/4 4-lb MILLSTONE - UNIT 2 V

Amendment No. 75, 77 JJ, 77, ooss

$$,195,119,

n ex

@p

'. ~

0; a

E TABLE 3.3-9

-m REMOTE SHUTDOWN MONITORING INSTRUMENTATION

'E A

MINIMUM m

READ 0UT MEASUREMENT CHANNELS INSTRUMENT LOCATION RANGE OPERAELE 1.

Wide Range Logarithmic Neutron Flux Hot Shutdown Panel 10% - 100%

1 Monitor (C-21) 2.

Reactor Trip Breaker Indication Reactor Trip OPEN-CLOSE 1/ trip breaker Switchgear (QO3) w 3.

Reactor Cold Leg Temperature Hot Shutdown Panel 0-600*F 1

1 (C-21) 4.

Pressurizer Pressure Hot Shutdown Panel a.

Low Range (C-21) 0-1600 psia 1

b.

High Range 1500-2500 psia 1

S.

Pressurizer Level Hot Shutdown Panel 0-100%

1 (C-21) 6.

Steam Generator Pressure Hot Shutdown Panel 0-1200 psia 1/ steam generator (C-21) 7.

Steam Generator Level Hot Shutdown Panel 0-100%

1/steamgenerator (C-21)-

2r 8

.a

.O v-

-~