Submits Info Re Potential Problem W/Ventilation Sys Associated W/Battery & Emergency Switchgear Rooms,Solution to Problem & Schedule for Completion of Necessary Mods.Mods Will Be Completed by 821231
ML20065P759
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/14/1982
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8210260329
Download: ML20065P759 (3)


Text

PHILADELPHIA ELECTRIC COMPANY

.t 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)641 4000 October 14, 1982 Mr. R. C. Haynes, Director Office of Inspection and Enforcement Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

Peach Bottom Battery and Emergency Switchgear Room Ventilation Systems Modification

Dear Mr. Haynes:

In a letter to you, dated April 13, 1981, we identified a potential problem with the ventilation system associated with our ba'ttery and emergency switchgear rooms.

We indicated that we would notify you as soon as we developed a permanent modification and established an anticipated completion date.

This letter will l

explain the potential problem, detail our se't** "? and submit our schedule for completion of the necessary modifications.

The system consists of a common ventilation supply system and separate exhaust systems for the emergency switchgear and battery rooms.

All ventilation systems for these rooms are installed in seismic Class I structures, however, it has been determined that the control air supply for the dampers associated with each supply and exhaust fan are not seismically qualified.

The potential exists for these dampers to fail during a seismic event such that all forced air cooling to the battery and emergency switchgear rooms would be eliminated.

l

[b p p@\\h0 l

B210260329 B21014

'"7 PDR ADOCK 05000277 P

PDR

\\

,si s

g Mr. R. C. Haynes, Director Page 2 Tne following dampers are affected:

PO-00019-1&2, PO-00020-l&2, l

PO-00031-l&2, PO-00032-l&2, PO-00025-l&2, PO-00026-l&2, PO-00016 As a temporary measure, mechanical restraints have been installed on one complete flow path so that ventilation is maintained on loss of instrument air.

The pneumatic air supply will be upgraded to seismic Class I criteria.

Seismically qualified bottled nitrogen will be provided for the pneumatic operators.

The bottled air installation will allow continued operation of the required fan systems after a seismic event.

1 Supply for the pneumatic operators will be from a 2 l

bottle system provided with suitable pressure indicators, and l

control valves.

One bottle will be used as required with the second as a backup.

One bottle will provide 250 cubic feet of nitrogen or air.

The 24 operators requiring a seismic air supply 4

utilize 1 cubic feet per operations.

Sufficient number of

- operator actions is provided by one. bottle.

The bottles and interconnecting tubing will be seismically restrained.

The outside air inlet damper.is currently air controlled i

to provide a minimum outside air inlet flow.

The damper will be i

provided with a mechanical stop to assure minimum fresh air i

intake.

The minimum air flow setting of 18,200 CFM is sufficient to keep the safeguard rooms at or below their design maximum temperature.

The subject modification does not involve unreviewed safety questions since:

1.

The probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report is not increased.

2.

The possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis-report is not created.

3.

The margin of safety as defined in the basis for the Technical Specifications is not reduced.

,n--

,,v,

--.~,

-n w-

- - - - - - - -. - ~

,,---,,r

,,r-,a,,--,,,r, r---

y e

-v

Mr. R. C. Haynes, Director Page 3 These modifications are expected to be completed by December 31, 1982.

If you have any questions or require additional information, please don't nesitate to call.

a Very truly yours,

~

/

i

'ooney erintendent eneration Division - Nuclear cc: