Responds to 901030 Request for Addl Info Re Implementation of Variable Overpressure Protection Sys Setpoint.Plant Design Change Being Considered to Include Automatic Setpoint Function
ML20065P820
Person / Time
Site: Beaver Valley
Issue date: 12/03/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-76889, NUDOCS 9012140075
Download: ML20065P820 (1)


Text

.--.- - -.

._. - - n.- -.. _ - -

-. _ - ~ -. - - -. _. - - -. -_.-..

e i V le, EUhef b39?O (h

+

Lhropnoppt. PA S040004 i

UdE

,c, December 3, 1990 e w ats Nuclear Regulatory Commissiu..

L.

s.

Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66

' Additional Information - TAC 76889 Gentlemen:

This provides our response to your request for additional infcrmation dated October 30, 1990 concerning our request to implement a

variable Overpressure Protection System (OPPS) setpoint as a function of temperature.

The OPPS is required to be placed in service during plant cooldown following Operating Manual Chapter 51, Procedure-D, Station Cooldown from the Hot Shutdown (mode

4) to the Cold Shutdown i

Shutdown '(mode 5).

The OPPS is then placed in service in accordance with-Operating. Surveillance Test (OST) 1.6.8, Placing Overpres ire Protection ESystem.in Service.

A temperature is selected and the corresponding pressure is obtained from new Figure 3.4-4-then the i

actuation setpoint is set and is verified monthly in accordance with Maintenance Surveillance Procedurca (MSP's) 6.68 and 6.69.

Normally the :setpoint' 'is set once on plant cooldown prior to decreasing Tavg below-the-current Technical Specification value of 275'F and is then removed on pla nt'.

heatup when Tavg increases above 275'F.

Utilizing

. existing equipment, the methodology to be applied upon receipt of NRC apnroval' is to select a setpoint, which envelopes all RCS temperature 1-...jes expected for anticipated plant conditions.

A

. plant design change (DCP-1587) is being considered to incorporate an automatic' setpoint funct..on similar to that used at DV-2, however,. no schedule has yet been determined to implement this change.

-If 'you have-any questions regarding this submittal, please call members of my staff.

Sincerely,

.A.J.

QF *~ ~

sS s

D.

Sieber

' Q" R a a ". 6 ice President-Nuclear Group

-cc:.

Mr. J. : Beall, Sr. Resident Inspector Mr. T.

T. Martin, NRC Region I Administrator Mr. A. W.. DeAgazio, Project Manager Mr. R.'Saunders (VEPCO) 9012140075 901203 PDR ADOCK 05000334 1001 P

PDC

.