Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000277/LER-1989-007, Corrected LER 89-007-00:on 890411,green Discoloration Discovered in Grease on Stabs of Control Fuses in Switchgear.Root Cause of Event Under Investigation.Stabs Lubricated W/Different Type of Approved Grease + (20:43:19, 16 March 2025)
- ML20247G825 + (20:43:27, 16 March 2025)
- ML20247G787 + (20:43:36, 16 March 2025)
- 05000382/LER-1998-009, :on 980415,inadvertent ESF Actuation Occurred. Caused by Inadequate Configuration Control.Restored Incorrectly Lifted Lead to Terminal Point & Made Maint Personnel Aware of Drawing Discrepancy + (20:43:44, 16 March 2025)
- IR 05000219/1988033 + (20:43:47, 16 March 2025)
- ML20247G714 + (20:43:53, 16 March 2025)
- ML20247G701 + (20:43:57, 16 March 2025)
- IR 05000416/1989019 + (20:44:03, 16 March 2025)
- ML20247G666 + (20:44:10, 16 March 2025)
- L-98-102, Requests Written Interpretation from NRR Re Intent of TS Requirements for Channel Calibr of Resistance Temp Detectors & Thermocouples.Method for Clarifying TS Requirements Described in Info Notice 97-080 + (20:44:34, 16 March 2025)
- IR 05000482/1988014 + (20:44:49, 16 March 2025)
- IR 05000348/1989019 + (20:44:51, 16 March 2025)
- IR 05000482/1998011 + (20:44:55, 16 March 2025)
- IR 05000458/1998003 + (20:44:59, 16 March 2025)
- IR 05000024/2030007 + (20:45:36, 16 March 2025)
- ML20247G505 + (20:45:49, 16 March 2025)
- ML20247G480 + (20:45:56, 16 March 2025)
- ML20247G446 + (20:46:04, 16 March 2025)
- TXX-8967, Deficiency Rept CP-89-022 Re Seismic Qualification of Atmospheric Cleanup Heater Control Panels.Initially Reported on 890814.Requisition to Procure Seismically Qualified Replacement Heater Control Panels Initiated + (20:46:05, 16 March 2025)
- TXX-8968, Interim Deficiency Rept CP-89-023 Re Failure of nonsafety- Related Inverter W/Potential to Adversely Affect RHR Sys Operability.Initially Reported on 890817.Next Rept Will Be Issued Prior to Unit 1 Fuel Load + (20:46:10, 16 March 2025)
- ML20247G438 + (20:46:13, 16 March 2025)
- IR 05000285/1998001 + (20:46:18, 16 March 2025)
- ML20247G395 + (20:46:23, 16 March 2025)
- 05000298/LER-1998-005, :on 980405,discovered That APRM Sys High Flux RPS Trip Set Point,Not Being Functionally Tested,Per Requirements of CNS Tss.Caused by Deficiency in Surveillance Procedures.High Flux Trip Set Point Test Procedures Revised + (20:46:27, 16 March 2025)
- IR 05000458/1988026 + (20:46:39, 16 March 2025)
- ML20247G357 + (20:46:46, 16 March 2025)
- 05000312/LER-1989-005, :on 890218,discovered That Six Essential Flow Transmitters in Auxiliary Feedwater Sys Had Plastic Plugs Installed in Spare Conduit Connection Opening.Plastic Plugs Replaced W/Metal Plugs + (20:46:56, 16 March 2025)
- ML20247G287 + (20:47:01, 16 March 2025)
- IR 05000089/1989001 + (20:47:33, 16 March 2025)
- TAC:69154 + (20:47:39, 16 March 2025)
- ML20247G140 + (20:47:41, 16 March 2025)
- 05000325/LER-1989-017, :on 890624,HPCI Sys,Steam Line Break Delta Pressure High Signal,Channel A,Isolation Occurred.Probably Caused by Spurious Trip of Redundant Div 1 ECCS Trip Unit. Unit Replacd & Original Unit Bench Tested + (20:47:52, 16 March 2025)
- ML20247G108 + (20:48:01, 16 March 2025)
- ML20247G064 + (20:48:12, 16 March 2025)
- ML20247G062 + (20:48:15, 16 March 2025)
- L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 + (20:48:21, 16 March 2025)
- ML20247G028 + (20:48:28, 16 March 2025)
- ML20247G018 + (20:48:36, 16 March 2025)
- IR 05000395/1998001 + (20:48:51, 16 March 2025)
- IR 05000369/1997019 + (20:48:52, 16 March 2025)
- ML20247F971 + (20:48:56, 16 March 2025)
- AECM-89-0058, Responds to 890117 Request for Addl Info Re Type C Testing of Test,Vent & Drain Valves.Encl Valve Lineup Records & Drawings Provide Valve Lineups for Performing Local Rate Tests & Illustrate Components/Barriers Associated W/Test + (20:49:35, 16 March 2025)
- ML20247F773 + (20:49:46, 16 March 2025)
- IR 05000483/1998004 + (20:50:09, 16 March 2025)
- IR 05000232/2008001 + (20:50:19, 16 March 2025)
- ML20247F647 + (20:50:23, 16 March 2025)
- L-98-004, Forwards Proposed Format & Content for License Application Including Regulatory Guidance Used,For NRC Review + (20:50:37, 16 March 2025)
- ML20247F585 + (20:50:42, 16 March 2025)
- 05000423/LER-1998-022, :on 980408,failure to Provide Operable Reactor Coolant Sys Loops in Mode 4 Occurred.Caused by Human Error. Operations Personnel Involved in Event Have Been Counseled + (20:50:57, 16 March 2025)
- TAC:L32067 + (20:51:01, 16 March 2025)
- 05000423/LER-1998-023, :on 980411,ESF Actuation Occurred at Millstone Unit 3.Caused by Failure of CR Operations Personnel to Diagnose S/G C Level Loss Resulting from Abnormal Sampling Blowdown Lineup.Operating Procedure Revised + (20:51:03, 16 March 2025)