- NUREG-1233, Informs of NRC Plans to Visit Tokyo on 890920-28.Requests Meeting W/Ministry of Intl Trade & Industry on 890921 to Discuss Advanced BWR Licensing Issues & Review Status.Srp, NUREG-1233 & Questions & Discussion Topics Encl.W/O SRP + (19:43:02, 16 March 2025)
- TXX-8947, Responds to Issues Raised During Operational & Startup Audit on 890620-22 Re Ac Essential Lighting Acceptance Testing, Control Rod Reactivity Worths & Loss of Offsite Power.Fsar Change Submittal Re Loss of Offsite Power Test Summary Encl + (19:43:18, 16 March 2025)
- ML20247R364 + (19:43:24, 16 March 2025)
- 05000282/LER-1998-005, :on 980422,inoperability on Actuation Logic for MSIV in Certain Flooding Conditions from Fwlb Was Noted. Cause for Flooding Not Identified.Doors Have Been Opened on Unit 1 to Preclude Flooding Concerns W/Respect to MSIVs + (19:43:35, 16 March 2025)
- AECM-89-0010, Rept of 10CFR50.59 Safety Evaluations for June-Dec 1988 + (19:44:03, 16 March 2025)
- ML20247R156 + (19:44:33, 16 March 2025)
- TXX-8954, Supplemental Deficiency Rept CP-88-29 Re Feedwater Split Flow Bypass Valve Mod Not Incorporated Into FSAR Chapter 15 Accident Analysis.Initially Reported on 880422.Corrective Actions for Unit 1 Rescheduled to Prior to Fuel Load + (19:44:38, 16 March 2025)
- NUREG-1343, Forwards NUREG-1353, Regulatory Analysis for Resolution of Generic Issue 82, Beyond Design Basis Accidents in Spent Fuel Pools. No Actions Should Be Required of Licensees + (19:44:57, 16 March 2025)
- L-98-105, Responds to NRC Re Violations Noted in Insp Repts 50-334/98-01 & 50-412/98-01.Corrective Actions:Performed Maint History Review of as-found Surveillance Data for Degraded Voltage Setpoints from Apr 1995 to Present + (19:45:00, 16 March 2025)
- IR 05000458/1989011 + (19:45:39, 16 March 2025)
- ML20247Q987 + (19:45:41, 16 March 2025)
- L-89-016, Forwards Request for Enforcement Hearing Re Enforcement Action EA-88-113 to Question Justification of Imposed Order Concerning Operability of Train a ECCS Subsystem Charging Pumps for Use in Recirculation Mode + (19:46:33, 16 March 2025)
- 05000352/LER-1998-007, :on 980422,discovered Three Itt Barton Model 580A Differential Pressure Switches Inoperable.Caused by Misapplication.Replaced Subject Itt Barton Differential Pressure Switches in safety-related Applications + (19:46:40, 16 March 2025)
- ML20247Q788 + (19:46:58, 16 March 2025)
- ML20247Q769 + (19:47:09, 16 March 2025)
- IR 05000309/1997009 + (19:47:18, 16 March 2025)
- ST-HL-AE-3118, Application for Amend to License NPF-76,allowing Use of New Power Distribution Limits Described in Encl FSAR Pages + (19:47:27, 16 March 2025)
- ML20247Q689 + (19:47:32, 16 March 2025)
- ML20247Q673 + (19:47:42, 16 March 2025)
- ML20247Q661 + (19:47:46, 16 March 2025)
- 05000285/LER-1989-012, :on 890502,determined That Main Feedwater Isolation Valve to a Steam Generator Inoperable Due to Improperly Set Torque Switch on Valve Motor Operator.Caused by Inadequate Maint Program.Switches Reset + (19:47:49, 16 March 2025)
- 05000302/LER-1989-026, :on 890629,plant Shutdown Initiated Due to Inability to Repair Emergency Diesel Generator 1B in Time Remaining in Action Statement.Cause of Inadequate Crankcase Vacuum Undetermined.Oil Separator Cleaned + (19:47:59, 16 March 2025)
- ML20247Q623 + (19:48:04, 16 March 2025)
- ML20247Q598 + (19:48:11, 16 March 2025)
- 05000285/LER-1989-017, :on 890624,internal Valve Component from Check Valve RW-125 Found Lying on Pump Discharge Vane.Caused by Lack of long-term Preventive Maint & Inservice Testing.Train of Raw Water Sys Returned to Svc on 890630 + (19:48:20, 16 March 2025)
- TXX-8910, Supplemental Deficiency Rept CP-87-33 Re Auxiliary Feedwater Pump Motor Fans.Initially Reported on 871214.Review of safety-related Motor Spec Conducted to Assure That Rotation Specified for Motor That Utilizes Unidirectional Fans + (19:48:33, 16 March 2025)
- TXX-8932, Advises That Date of Full Compliance for Deviations & Violations Noted in Insp Repts 50-445/86-22,50-446/86-20, 50-445/86-03 & 50-446/86-02 Rescheduled for Completion Prior to Unit 1 Fuel Load.Unit 2 Schedule Unchanged + (19:48:54, 16 March 2025)
- ML20247Q346 + (19:49:20, 16 March 2025)
- IR 05000499/1988024 + (19:49:41, 16 March 2025)
- 05000266/LER-1998-015, :on 980420,containments Fan Cooler Test Results Were Outside Acceptance Criteria.Cause Is Still Being Evaluated.Pressure Washing of Air Side of Cooling Coils for All Four Unit 1 CFCs Has Been Completed + (19:49:54, 16 March 2025)
- TAC:65482 + (19:49:56, 16 March 2025)
- IR 05000302/1989009 + (19:49:59, 16 March 2025)
- 05000313/LER-1989-030, :on 890824,fire Barrier Between Adjacent Emergency Diesel Generator Rooms Did Not Meet NFPA Code Re Protection Against Spread of Flammable Liquids.Caused by Fire Barrier Degradation.Barriers Modified + (19:50:01, 16 March 2025)
- TAC:62261 + (19:50:05, 16 March 2025)
- 05000341/LER-1989-019, :on 890819,pressure Control to HVAC Sys Lost, Resulting in Decrease in Control Room Air Pressure.Caused by Seized Bearings & Fan Not Rotating.Shaft & Bearings Replaced & Fan Placed Back in Svc + (19:50:12, 16 March 2025)
- 05000414/LER-1998-002-01, Forwards LER 98-002-01 Re Violation of Auxiliary Bldg Filtered Exhaust Ventilation Sys Tech Specs 3.7.7 Due to Exceeding Allowable Outage Time of TS Action Requirements for 2A Auxiliary Bldg Filtered Exhaust Sys + (19:50:59, 16 March 2025)
- IR 05000289/1989017 + (19:51:01, 16 March 2025)
- ML20247P625 + (19:51:12, 16 March 2025)
- 05000289/LER-1998-005, Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr + (19:51:15, 16 March 2025)
- 05000336/LER-1997-022-03, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachm + (19:51:24, 16 March 2025)
- TAC:61634 + (19:51:29, 16 March 2025)
- ML20247P537 + (19:51:31, 16 March 2025)
- 05000461/LER-1998-018, :on 980416,ESFA,occurred.Caused by Deficiencies in Method Used to Perform Nsps Power Supply Adjustment. Developed Maint Procedure for Replacement of Power Supplies Powered by Nsps Bus + (19:51:42, 16 March 2025)
- GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld + (19:51:43, 16 March 2025)
- IR 05000254/1997023 + (19:51:53, 16 March 2025)
- IR 05000397/1998002 + (19:51:55, 16 March 2025)
- IR 05000413/1989009 + (19:52:02, 16 March 2025)
- 05000395/LER-1989-015, :on 890825,pressurizer Safety Valve Body Inlet a Temp Increased to Greater than 450 F & Plant Shutdown Initiated.Licensee Continuing to Evaluate Cause.Manual Reactor Trip Initiated + (19:52:06, 16 March 2025)
- 05000423/LER-1998-016-01, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl + (19:52:14, 16 March 2025)
- IR 05000289/1988030 + (19:52:15, 16 March 2025)
- IR 05000289/1988007 + (19:52:17, 16 March 2025)