Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-04-2459, 10 CFR 21 Report, Electric Power Research Institute Motor Operated Valve Performance Prediction Methodology Versions 1.0 Through 3.2 + (04:20:26, 16 January 2025)
- IR 05000282/2004012 + (04:20:28, 16 January 2025)
- ML043520036 + (04:20:29, 16 January 2025)
- ML043520028 + (04:20:29, 16 January 2025)
- ML043520027 + (04:20:30, 16 January 2025)
- ML043520019 + (04:20:31, 16 January 2025)
- ML043520018 + (04:20:32, 16 January 2025)
- PNO-II-04-012, Fire in Turbine Bearing Area Results in Shutdown Greater than Two Days + (04:20:33, 16 January 2025)
- ML043510436 + (04:20:34, 16 January 2025)
- ML043510431 + (04:20:35, 16 January 2025)
- ML043510424 + (04:20:36, 16 January 2025)
- ML043510406 + (04:20:37, 16 January 2025)
- CPSES-200402548, Relief Request P-1 to the Unit 1/Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, 1999 and 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) + (04:20:38, 16 January 2025)
- ML043510376 + (04:20:39, 16 January 2025)
- NUREG/CR-6859, Use of the University of Marylands Letter Report, Thermal-hydraulic Uncertainty Analysis in Pressurized Thermal Shock Risk Assessment, as a Reference in Our NUREG/CR-6859, PRA Procedures and Uncertainty for PTS Analysis + (04:20:40, 16 January 2025)
- ML043510347 + (04:20:40, 16 January 2025)
- ML043510324 + (04:20:42, 16 January 2025)
- ML043510322 + (04:20:43, 16 January 2025)
- Press Release-I-04-057, NRC Finds Violations of Low Safety Significance at Vermont Yankee Nuclear Power Plant + (04:20:44, 16 January 2025)
- Press Release-04-163, NRC Plans to Issue License Renewal Exemption for Oyster Creek Nuclear Station + (04:20:45, 16 January 2025)
- IR 05000424/2004008 + (04:20:49, 16 January 2025)
- ML043510246 + (04:20:49, 16 January 2025)
- ML043510245 + (04:20:50, 16 January 2025)
- ML043510239 + (04:20:51, 16 January 2025)
- BVY 04-131, Technical Specification Proposed Change No. 263 - Supplement No. 22 Extended Power Uprate - 10 CFR 50 Appendix R Timeline Verification + (04:20:52, 16 January 2025)
- NL-04-2451, November 2004 Monthly Operating Report for Edwin I. Hatch Nuclear Plant + (04:20:55, 16 January 2025)
- ML043510218 + (04:20:56, 16 January 2025)
- ML043510222 + (04:20:56, 16 January 2025)
- ML043510213 + (04:20:57, 16 January 2025)
- ML043510210 + (04:20:58, 16 January 2025)
- ML043510207 + (04:20:59, 16 January 2025)
- ML043510203 + (04:21:00, 16 January 2025)
- ML043510205 + (04:21:00, 16 January 2025)
- ML043510201 + (04:21:01, 16 January 2025)
- ML043510200 + (04:21:02, 16 January 2025)
- 05000254/LER-2004-003, Regarding Control Room Emergency Ventilation Test Failure Due to Deficient Modification to Hatch Covers + (04:21:05, 16 January 2025)
- ML043510165 + (04:21:06, 16 January 2025)
- ML043510161 + (04:21:07, 16 January 2025)
- SBK-L-04132, November 2004 Monthly Operating Report for FPL Energy Seabrook Station + (04:21:07, 16 January 2025)
- ML043510121 + (04:21:08, 16 January 2025)
- NL-04-2436, November 2004 Monthly Operating Reports for Joseph M. Farley Nuclear Plant + (04:21:09, 16 January 2025)
- ML043510116 + (04:21:09, 16 January 2025)
- ML043510100 + (04:21:10, 16 January 2025)
- ML043510074 + (04:21:11, 16 January 2025)
- ML043510093 + (04:21:11, 16 January 2025)
- ML043510065 + (04:21:12, 16 January 2025)
- JAFP-04-0186, November 2004 Monthly Operating Report for James A. FitzPatrick + (04:21:13, 16 January 2025)
- ML043510058 + (04:21:15, 16 January 2025)
- LR-N04-0524, Station. Supplement to Request for Change to Technical Specifications Safety Limit Minimum Critical Power Ratio + (04:21:15, 16 January 2025)
- ML043510043 + (04:21:16, 16 January 2025)
- ML043510039 + (04:21:17, 16 January 2025)
- ML043510035 + (04:21:18, 16 January 2025)