ML043510093
| ML043510093 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/13/2004 |
| From: | Ellen Brown NRC/NRR/DLPM/LPD2 |
| To: | Abney T Tennessee Valley Authority |
| Brown E, NRR/DLPM, 415-2315 | |
| References | |
| Download: ML043510093 (3) | |
Text
I Eva Brown -C CLRIFICATION: EPU Review Standard and associated Topcial ReportsPa i
.---1 -I - - -__ -- __-_
- -_ - Pag.1A From:
Eva Brown To:
Abney, Timothy Date:
Monday, December 13, 2004 9:19AM
Subject:
CLARIFICATION: EPU Review Standard and associated Topcial Reports
- Tim, I just wanted to follow-up on the conversations we had last Wednesday regarding the hierarchy of these EPU guidance documents; Review Standard for Extended Power Uprates, RS-001, Rev. 0 dated December 2003, and the General Electric, Generic Guidelines for General Electric Boiling Water Reactor Extended Power Uprate,0 Februalry 1999 and 2000, (ELTR1 and ELTR2, respectively).
The standardized review guidance and acceptance criteria (applicable sections of 1 0 CFR 50) are collected and segregated by functional area in the RS-001. These acceptance criteria include General Design Criteria as enumerated in Appendix A to 1 0 CFR 50. Topical reports such as ELTRi and ELTR2 are used as a vehicle to improve the efficiency of a licensing process by allowing the staff to review a methodology or proposal that will be used by multiple licensees and following approval, allowing the participating licensees to reference the approved report. The NRC-accepted ELTRi and ELTR2 provide appropriate guidelines for the EPU applications, but do not provide the regulatory criteria for the safe operation of the facility. They describe a generic proposed methodology for evaluating whether design changes still meet applicable NRC requirements.
In Enclosure 12, TVA marked up the RS-001, Areas of Review Matrix. In many cases regulatory requirements were replaced by TVA with references to the ELTR methodology vice the regulatory acceptance criteria. If TVA believes that the acceptance criteria not be the applicable sections in 1 0 CFR 50 and Appendix A as orifginally indicated in the Review Standard, the NRC staff is looking for TVA's proposed regulatory acceptance criteria. This is consistent with the guidance in RS-001 which states for the acceptance review "jr]eview the information provided by the licensee... to confirm that the regulatory requirements and design basis are adequately characterized and addressed with respect to the proposed EPU.0 The NRC staff's acceptance review RAls are focused primarily on the adequacy of TVA's description of Browns Ferry's existing and proposed engineering design and licensing bases at the current and proposed power level. Question 1 requests that TVA supplement the submittals to better define the regulatory acceptance criteria used by TVA to determine that uprating the licensed power remained acceptable for Browns Ferry. The Browns Ferry EPUs are two among at least seven EPUs in house, on top of the other restart, license renewal, and outage related submittals for the nuclear industry. As Browns Ferry's design basis differs from the baseline in the review standard, a description of the Browns Ferry specific EPU acceptance criteria used by TVA greatly enhances the efficiency of the NRR staff's review.
During our conversation, you indicated that the TVA licensing basis and design basis was described in Appendix A to the FSAR, and you suggested we take a look. Based on our cursory review, that document may be a good starting point for TVA to address the NRC staff's questions regarding characterization of the criteria used. As for the feedwater heater analysis, the analysis itself is not needed at this time, however a detailed summary should be included.
Hopefully this clarifies your understanding of the hierarchy of documents and clarifies the guidance provided in RS-001 and ELTR1/2. If you have any additional questions, please feel free to give me or Margaret a call.
IEva Brown - CLARIFICATION: EPU Review Standard and associated Topcial Reports P ge 2 Eva A. Brown Project Manager - Turkey Point, Browns Ferry 2 and 3 Project Directorate 11-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Office: (301) 415-2315 Fax: (301) 415-1222 CC:
Austin, Steve; Chernoff, Margaret; Hackett, Edwin; Marshall, Michael; Steingass, Timothy
I \\temp\\-Gw)OOO1.TMP MailEnvelopeProperties (41BDA506.9C3: 18:18539)
Paae 1 1
Subject:
Creation Date:
From:
Created By:
CLARIFICATION: EPU Review Standard and associated Topcial Reports 12/13/04 9:19AM Eva Brown EAB 1 @nrc.gov Recipients nrc.gov owf2_po.OWFN_DO TXS3 CC (Timothy Steingass) nrc.gov owf4.po.OWFNDO MHC CC (Margaret Chernoff)
MXM2 CC (Michael Marshall) nrc.gov twf5-po.TWFNDO EMH1 CC (Edwin Hackett) tva.gov swaustin CC (Steve Austin) teabney (Timothy Abney)
Post Office owf2.po.OWFNDO owf4_po.OWFNDO twf5-po.TWFNDO Route nrc.gov nrc.gov nrc.gov tva.gov Files MESSAGE Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Size 4791 Date & Time 12/13/04 09:19AM None Standard No None No Standard