November 2004 Monthly Operating Report for Beaver Valley Power Station
ML043510200
Person / Time
Site: Beaver Valley
Issue date: 12/07/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-04-157
Download: ML043510200 (3)


Text

FENOC Beaver Valle) PowerStation P. O. Box 4 Shippingport, PA 15077 L-04-157 December 7, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report",- and. Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of November, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfull Pearce Vice-President BVPS DTJ/cmg Enclosures cc: *NRC Regional Office. . -' ' - -

c: ,;KingofPrussiaPAi' -,

j-I ,YGC~~~s. ;_ i1x ;X*b. ,\i;,,  :.................... ;

i.I: .,4..............

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE December 01, 2004 COMPLETED BY David 1. Jones ,

TELEPHONE 724-682-4962 REPORTING PERIOD: November 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 408.50 7,391.87 175,419.14
4. Number of Hours Generator On-line 392.30 7,375.32 172,873.14
5. Reserve Shutdown Hours 0.00 0.00 0.00 6.--Net Electrical Energy Generated (MWHrs)- --- 256,997 -6,048,747.00--130,690,119.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 10/18/2004 S 327.70 C 4 The Unit was shutdown for its planned 16th refueling outage on 10/18/04 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

The Unit was synchronized to the electrical grid at 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> on 11/14/04 officially ending the 16th refueling outage.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit began the report period shutdown in Mode 6 during its planned 16th refueling outage. Mode 5 was entered at 1438 hours0.0166 days <br />0.399 hours <br />0.00238 weeks <br />5.47159e-4 months <br /> on 11/6/04. The Unit began to heat up on 11/12/04, entering Mode 4 at 0353 hours0.00409 days <br />0.0981 hours <br />5.83664e-4 weeks <br />1.343165e-4 months <br /> and Mode 3 at 1343 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.110115e-4 months <br />. Mode 2 was entered at 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br /> on 11/13/04, and the Reactor was taken critical at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> on 11/13/04. Mode l was entered at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br /> on 11/14/04. The Unit was synchronized to the electrical grid at 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> on 11/14/04 officially ending the 16th refueling outage.

Output was then escalated to the 30%, 75% and 90% power plateaus over the next several days for fuel preconditioning, to obtain core power distribution data (flux maps) for startup testing, and for calibration of nuclear instrumentation. A nominal value of 100% output was achieved at 0507 hours0.00587 days <br />0.141 hours <br />8.382936e-4 weeks <br />1.929135e-4 months <br /> on 11/22/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

.OD OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver valley 2 DATE December 01,2004 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO November 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 8,040.00 125,648.48
4. Number of Hours Generator On-line 720.00 8,040.00 124,904.38
5. Reserve Shutdown Hours 0.00 0.00 0.00

~Z-.6.; -Net Electrical Energy Generated (MWHrs) - .- -607,400.00 --6,684;414;00 - 98,503,812.00 --- --- ---

UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration Reasonl Shutting Cause & Corrective Action No at  : Scheduled (Hours) Resn1Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1

Text

FENOC Beaver Valle) PowerStation P. O. Box 4 Shippingport, PA 15077 L-04-157 December 7, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report",- and. Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of November, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfull Pearce Vice-President BVPS DTJ/cmg Enclosures cc: *NRC Regional Office. . -' ' - -

c: ,;KingofPrussiaPAi' -,

j-I ,YGC~~~s. ;_ i1x ;X*b. ,\i;,,  :.................... ;

i.I: .,4..............

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1 DATE December 01, 2004 COMPLETED BY David 1. Jones ,

TELEPHONE 724-682-4962 REPORTING PERIOD: November 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 408.50 7,391.87 175,419.14
4. Number of Hours Generator On-line 392.30 7,375.32 172,873.14
5. Reserve Shutdown Hours 0.00 0.00 0.00 6.--Net Electrical Energy Generated (MWHrs)- --- 256,997 -6,048,747.00--130,690,119.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments 1 10/18/2004 S 327.70 C 4 The Unit was shutdown for its planned 16th refueling outage on 10/18/04 at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

The Unit was synchronized to the electrical grid at 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> on 11/14/04 officially ending the 16th refueling outage.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit began the report period shutdown in Mode 6 during its planned 16th refueling outage. Mode 5 was entered at 1438 hours0.0166 days <br />0.399 hours <br />0.00238 weeks <br />5.47159e-4 months <br /> on 11/6/04. The Unit began to heat up on 11/12/04, entering Mode 4 at 0353 hours0.00409 days <br />0.0981 hours <br />5.83664e-4 weeks <br />1.343165e-4 months <br /> and Mode 3 at 1343 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.110115e-4 months <br />. Mode 2 was entered at 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br /> on 11/13/04, and the Reactor was taken critical at 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> on 11/13/04. Mode l was entered at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br /> on 11/14/04. The Unit was synchronized to the electrical grid at 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> on 11/14/04 officially ending the 16th refueling outage.

Output was then escalated to the 30%, 75% and 90% power plateaus over the next several days for fuel preconditioning, to obtain core power distribution data (flux maps) for startup testing, and for calibration of nuclear instrumentation. A nominal value of 100% output was achieved at 0507 hours0.00587 days <br />0.141 hours <br />8.382936e-4 weeks <br />1.929135e-4 months <br /> on 11/22/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

.OD OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver valley 2 DATE December 01,2004 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO November 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 8,040.00 125,648.48
4. Number of Hours Generator On-line 720.00 8,040.00 124,904.38
5. Reserve Shutdown Hours 0.00 0.00 0.00

~Z-.6.; -Net Electrical Energy Generated (MWHrs) - .- -607,400.00 --6,684;414;00 - 98,503,812.00 --- --- ---

UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration Reasonl Shutting Cause & Corrective Action No at  : Scheduled (Hours) Resn1Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1