December 29, 2004 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF ALTERNATE SOURCE TERM (TAC NO.
Dear Mr. Christian:
By letter dated May 27, 2004, you requested an amendment to the technical specifications for the Millstone Power Station, Unit No. 3. The proposed amendment would allow the use of an alternate source term.
The Nuclear Regulatory Commission staff has determined that the enclosed questions must be addressed before we can complete our review. These questions were forwarded electronically to Mr. Paul Willoughby of your staff on December 6, 2004. Additionally, they were discussed in a telephone call with Mr. Willoughby and other members of your staff on December 14, 2004. I understand that you intend to respond to this request for additional information within 30 days of the date of this letter. If you have any questions, I can be reached at (301) 415-1494.
Sincerely,
/RA/
George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page
Enclosure:
Request for Additional Information
Enclosure REQUEST FOR ADDITIONAL INFORMATION MILLSTONE POWER STATION, UNIT NO. 3 USE OF ALTERNATE SOURCE TERM Regulatory Guide (RG) 1.52 establishes the criterion for penetration in the laboratory testing of engineered safety feature filter systems. In Revision 2 of RG 1.52, the allowable penetration for a 2-inch bed filter is less than 1 percent. In Revision 3 of RG 1.52, some relaxation was allowed and the penetration criterion for a 2-inch bed during a laboratory test was increased to less than 2.5 percent, based in part on maintaining a safety factor of 2. The current Millstone Power Station, Unit No. 3 technical specification (TS) for the control room emergency ventilation filter allows 2.5 percent penetration and is in compliance with RG 1.52, Revision 3.
The submittal requests a TS surveillance change to allow a 5-percent penetration test criteria.
The Nuclear Regulatory Commission staff does not have sufficient information on filter performance for test penetration criteria lower than specified in your existing TSs.
The fact that lower filter efficiencies were assumed in the design basis analysis does not necessarily support reducing filter efficiency test requirements. The surveillance requirement is based on system parameters for a 2-inch deep filter considering residence time and other parameters using clean carbon adsorbers.
In addition, consideration is given to the change in efficiency over time so that there will be reasonable assurance that the filter will have the required efficiency at the end of the test interval, as well as at the beginning of the test interval. Performance of carbon adsorbers at other efficiencies as a result of depletion of adsorber sites over the time of the test interval have not been evaluated. Please justify the acceptability of reducing the testing criteria in your existing TS.
Millstone Power Station, Unit No. 3 cc:
Lillilan M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
Millstone Power Station, Unit No. 3 cc:
Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF ALTERNATE SOURCE TERM (TAC NO.
Dear Mr. Christian:
By letter dated May 27, 2004, you requested an amendment to the technical specifications for the Millstone Power Station, Unit No. 3. The proposed amendment would allow the use of an alternate source term.
The Nuclear Regulatory Commission staff has determined that the enclosed questions must be addressed before we can complete our review. These questions were forwarded electronically to Mr. Paul Willoughby of your staff on December 6, 2004. Additionally, they were discussed in a telephone call with Mr. Willoughby and other members of your staff on December 14, 2004. I understand that you intend to respond to this request for additional information within 30 days of the date of this letter. If you have any questions, I can be reached at (301) 415-1494.
Sincerely,
/RA/
George F. Wunder, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page
Enclosure: