Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Constellation I
Energy Group December 14, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 November 2004 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
for David A. Holm Plant General Manager DAH/CAN/bjd Attachments cc:
J. Petro, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. I. McLean, DNR S. Mainieri, INPO K. N. Larson, ANI
, --'i,,-, 4 1 -
L`
ATTACHMENT (1)
NOVEMBER 2004 OPERATING DATA REPORTS Calvert Cliffs Nuclear Power Plant, Inc.
December 14,2004
OPERATING DATA REPORT Docket No. 50-317 Calvert Cliffs Unit I December 3, 2004 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
NOVEMBER 2004 845 870 Year-Cumulative to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED (MWH)
This month 720.0 720.0 0.0 644,799 7,330.9 7,291.1 0.0 6,306,296 199,380.3 196,176.8 0.0 161,006,011
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - UI December 2, 2004 Herman 0. Olsen (410) 495-6734 REPORTING MONTH November 2004 TYPE DURATION METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DHOURAI REASON SHUTTING S:
SCHEDULED (HURS)
DOWN 2 COMMENTS There were no shutdowns this month.
l Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
1 - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I December 2, 2004
SUMMARY
OF OPERATING EXPERIENCE November 2004 The unit operated at 100% power for the entire month.
OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 December 3, 2004 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
NOVEMBER 2004 845 858 Year-to-Date Cumulative to Date This month
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 720.0 720.0 0.0 629,906 7,990.4 7,985.6 0.0 6,896,664 192,717.2 190,823.8 0.0 157,639,954
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 December 2, 2004 Herman 0. Olsen (410) 495-6734 REPORT MONTH November 2004 TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DURATION REASON SHUTTING S:
SCHEDULED (HOURS)
DOWN 2 COMMENTS There were no shutdowns this month.
l Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 December 2, 2004
SUMMARY
OF OPERATING EXPERIENCE November 2004 The unit began the month at 100% power.
On 1 1/05/04 at 2200, power was reduced to 86% for Main Turbine Valve Testing. Testing was completed at 2353. At 2355 power was further reduced to 65% to allow securing 22 Steam Generator Feed Pump for planned maintenance. Following maintenance and testing of the feed pump, power was returned to 100% on 11106/04 at 0830.
The unit operated at 100% power for the remainder of the month.